2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.

Slides:



Advertisements
Similar presentations
P-Y BERTIN Jefferson Laboratory and Université BLAISE PASCAL- IN2P3/CNRS for the DVCS HALL A collaboration 0 exclusive electro production Q 2 =2.3 GeV.
Advertisements

E status report Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting December 13 th 2007.
Ioana Niculescu James Madison University August 15, 2013.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Experimental requirements for GPD measurements at JLab energies. Detector that ensures exclusivity of process, measurement of complete final state Measure.
LHCf 2015 Questions from LMC: – LHCf run scheduled shortly after initial commissioning – can it be delayed? – Present plan below. LHCf to removed at first.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
E : (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Proton Form Factor ratio GEp/GMp with polarization method --on behalf of Jefferson lab GEp3 collaboration Wei Luo Lanzhou University, China April
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
Proton polarization measurements in π° photo- production --on behalf of the Jefferson Lab Hall C GEp-III and GEp-2 γ collaboration 2010 Annual Fall Meeting.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
KIN2  .30 deuterium t min = GeV 2 q’=2.78 GeV P’ d =.352 Gev Inner calo 10x9 block R=13.5 cm   ’ =8° t min =-0.33 GeV 2 q’=2.72 GeV P’ d =.579.
S PIN A SYMMETRIES ON THE N UCLEON E XPERIMENT ( E07-003) Anusha Liyanage Experiment Nuclear Physics Group Meeting Hampton University May 11, 2009.
Unique Capabilities – Det./Elect.Missed Opportunities – Det./Elect. Novel detectors and instrumentation for particle detection and beam diagnostics Calorimeters.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
Possibility for Double DVCS measurement in Hall A Alexandre Camsonne SBS Meeting June 4 th 2013.
Hall A Collaboration, June 10, 2010, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Thia Keppel 9/24/12. Accelerator schedule excerpts (Arne Freyberger) Accelerator Run II: Beam in hall 3/2014, or maybe as early as 1/2014 (?) > 1.1 GeV/pass,
Precision Measurement of R L and R T of Quasi-Elastic Electron Scattering In the Momentum Transfer Range 0.55GeV/c≤|q|≤1.0GeV/c* Yan Xinhu Department of.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
E : (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Deeply Virtual Compton Scattering on the neutron Malek MAZOUZ LPSC Grenoble EINN 2005September 23 rd 2005.
Deeply Virtual Compton Scattering in JLAB Hall A
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
Proton Charge Form Factor Measurement E. Cisbani INFN Rome – Sanità Group and Italian National Institute of Health 113/Oct/2011E. Cisbani / Proton FF.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Kelli Hardy Compton Study from Experimental Data.
DVCS – Hall A Study of the Background Noise HUGS 2008 Florian ITARD.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
Study of Background Noise in the DVCS Experiment Hall A - JLab Florian ITARD Monastir – December 15th 2008.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting December 2008 Monastir, Tunisia.
E & E status report Maxime DEFURNE CEA-Saclay/Irfu/SPhN 1.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne VI. Nuclear Physics (NP)
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne November 18 th 2011 VI. Nuclear.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Hall C - 12 GeV pCDR Max. Central Momentum 11 GeV/c 9 GeV/c Min. Scattering Angle 5.5 deg 10 deg Momentum Resolution.15% -.2% Solid Angle 2.1 msr 4.4 msr.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
JLab, October 31, 2008 WACS in 12 GeV era 1 GPDs Wide-Angle Compton Scattering pi-0 photo-production in 12 GeV era B. Wojtsekhowski Outline WACS and other.
JLab PAC33, January 16, 2008 Polarization transfer in WACS 1  p   p Polarization transfer in Wide-Angle Compton Scattering Proposal D. Hamilton,
The GMp Experiment in 2014 Vincent Sulkosky Longwood University for the E Collaboration Hall A DVCS Collaboration Meeting December 19-20, 2013.
Status of HRS Detectors Barak Schmookler DVCS - 12/19/20131.
Envisioned PbWO4 detector Wide-Angle Compton Scattering at JLab-12 GeV with a neutral-particle detector With much input from B. Wojtsekhowski and P. Kroll.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
X. Zheng, July 22-23, 2008, Hall A Parity Collaboration Meeting Xiaochao Zheng University of Virginia July 22-23, 2008 Overview of the experiment, schedule.
Preparation for CERN test beam
Luminosity Monitor Status
The G0 experiment at JLAB
during Fall GMp run (high current)
Preparation of the CLAS12 First Experiment Status and Time-Line
Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003.
Wei Luo Lanzhou University 2011 Hall C User Meeting January 14, 2011
Gep/SANE this week – quick overview
David Anez Saint Mary’s/Dalhousie University May 14, 2011
Hall “12 GeV” May 27, 2003 NAPP 2003: J.J. LeRose.
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
Possible parasitic measurement during Fall GMp run
Presentation transcript:

2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde

Three models: Independence – GMp installs and runs first ~1 PAC month Full operation of both HRS for GMp, no Luminosity limits from DVCS – One month shutdown for DVCS installation – DVCS runs ~3 PAC months – No modification to scattering chamber needed Cooperation – GMp and DVCS install together (except DVCS Calo.) – GMp runs independently Restrictions on HRS angles from vacuum chamber and DVCS stand Restrictions on HRS movement from DVCS cables and stand, HRS movement needs manual assistance – One week shutdown to install DVCS Calo. – DVCS runs ~3 PAC months GMp acquires parasitic data in HRS-R at large angles. Symbiosis – GMp and DVCS fully install together – GMp and DVCS running is interlaced (circa weekly) Maximum luminosity is 25μA × 15 cm LH 2 (radiation limit for DVCS Calo.) Beam in Compton Chicane Restrictions on HRS angles and movement GMp acquires “unlimited” parasitic data in wide angle HRS-R – Luminosity is correlated with beam energy: GeV, of GeV GMp angles < 49° only accessible with HRS-L – DVCS Calo parked in “safe mode” at 5.5 m from target at 14° No 11 GeV beam before Autumn 2014 Too many restrictions on G M p Must have DVCS DAQ operational Jan 2014

DVCS Cabling Spectrometers movement must be monitored in the Hall 220 RG-213 cables DVCS cables must be moved by hand with HRS-L movement (multi-person effort)

New (skinny) support for DVCS Stand HRS-L: 20.2°; HRS-R: –43°; DVCS:–8.5°

Removable support struts for walkways Must be removed for angle changes

DVCS: –8.5° and 2.0 m from target center (minimum distance 1.5 m)

Angle Restrictions (Approximate, to be revised) Minimum (central) HRS—DVCS-Calo opening angle: 25° (limited by DVCS-Calo stand)   HRS-L)–  DVCS-Calo) ≥ 28.7° HRS-L ≥ 19° with –9.7°   DVCS-Calo)–  HRS-R) ≥ 34.5° |HRS-R| ≥ 49° with –14.5° Restrictions of the common Scattering Chamber design – HRS-L ≤ 46° – HRS-R: 33°—80°

Scattering Chamber HRS-L  12.5°—46° (central angles)  14.5° min w/ 14.5° DVCS Calo HRS-R (central angles)  49°—80° w/ DVCS 14.5°

E DVCS Kinematics : nucl-ex/ nucl-ex/ Beam (GeV) k’ (GeV)  (HRS-L) Q 2 (GeV 2 ) x Bj Beam (  A)  (Calo) d(Calo) (m) Time (days) ° –11.7° – Subtotal 6.6 GeV – – – – Subtotal 8.8 GeV – – – – – Subtotal 11 GeV45

G M p Proposal Last two kinematic points rejected by PAC Possible parasitic points in blue

Cryotargets

Detector Configuration Cerenkov mirrors need re-coating. Short Cerenkov for FPP chamber? Trigger options: – S0 – Cerenkov – Pb-Glass

2013 Reconstruct the Calorimeter – Return PMT to JLab – re-wrap blocks Remount calorimeter – Space in TEDF building? – Small stand for Calo – Space to organize cables? – Need 200 x ~5m cables to connect to ARS Re-commission ARS/Trigger/CODA Ready for Jan 2014?