To Conduct FlexPLI Round Robin Car Test Smoothly and Effectively We had 10 organizations offering to join the FlexPLI Round Robin Car Tests. To conduct.

Slides:



Advertisements
Similar presentations
WLTP Phase 1b Organization WLTP Informal Group Chair : S. Redmann Vice Chair : K. KOBAYASHI co-TSs : K. Kolesa / N. ICHIKAWA Drafting Coordinator : from.
Advertisements

Flex PLI GTR Status 1-2 December 2011 Bernard Been Informal Group GTR9 PH2 GTR9-1-08r1.
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 24th WHDC, Geneva, 03 June 2008 Informal document No. GRPE (56th.
1 Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities Status Report on Flexible Pedestrian Legform Impactor.
Scrum in 30 minutes! Oddly, a 45-minute presentation by Carl Chatfield Content Project Manager, Microsoft Puget Sound MPUG September 2009.
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
HRB Webinar Health Research Awards Content Objective of the call Scope and Panels Principal Investigator Response to peer-reviewers (rebuttal) Some.
Insert the title of your presentation here Presented by Name Here Job Title - Date Change to foam flesh used by EEVC lower & upper legforms Brian Hardy.
Checklist for Vehicle Testing GTR Round Robin FlexPLI Logbook for each leg to be sent with the leg to record the following: Certification tests.
Project Analysis Course ( ) Week 2 Activities.
EUROPE. September 08 to 11 September 12 to 14 September - 15.
Company Confidential Registration Management Committee 1 Completing Independent Assessments Robert Flaharty & John Horan January 17, 2013 OP Assessor Workshop.
Community Foundation of the Ozarks December 1 st, 2009 Webinar Professionalizing Board Development Brad Toft – Ozarks Regional YMCA.
Join us on Twitter: #AU2015 Autodesk University 2015 – Webcast #2 AU Class Requirements - Handouts, the Autodesk Gallery, and More For audio, call:
Fourth progress report of the informal group on Phase 2 of gtr No. 9 (IG GTR9 - PH2) Transmitted by the experts of Japan and Germany Informal document.
1 1 WLTP Round robin program -Asia round – Prepared by JAMA 12 MAR 2014 WLTP-06-19e.
CLE 3231.Inq.2 Design and conduct scientific investigations to explore new phenomena, verify previous results, test how well a theory predicts, and compare.
So they wrecked Your Master Schedule? Michael Jackson Director Michael Jackson Director.
Changing How Our Children Grow Up in America. Supporting Staff Development and Retention with a New BBBS Learning Center.
Slide 1 Flex PLI Inverse Test Setup - Moving Ram Friction Dirk-Uwe Gehring BGS Böhme & Gehring GmbH 5 th Meeting of the IG GTR9-PH2 Bergisch Gladbach,
Processing Project Proposals
TEMPUS III Guide for applicants NEW. Web addresses TEMPUS III.
Copyright © 2014 by The University of Kansas Rating Community Goals: Appraising of Importance and Feasibility.
Leg Feasibility Testing 9 th GRSP Ad Hoc Meeting Geneva, Switzerland December 5-6, 2005.
2015/9/29 Japan Automobile Research Institute 1 Asian Round Robin Test ~ Interim report ~ 12th WLTP-IWG 29 Sep – 1 Oct 2015 prepared by Japan WLTP-12-32e.
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
Conducting Research and Making Your Presentation  Picking a topic  Researching your topic  Scoping your topic  Developing a plan  Outlining your presentation.
FlexPLI Rebound Phase 7 th IG GTR9-PH2 Meeting 3/July/2013 Japan Automobile Standards Internationalization Center (JASIC) GTR
Atsuhiro Konosu Chairperson of Flex-TEG, Japan Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Status Report.
PRESENTATION SKILLS. Preparation Need to know Who is the audience? what is the topic? What is the purpose of the presentation? Where and when will.
Introducing Regulatory Impact Analysis into the Turkish Legal Framework Improving Transparency, Consultation and Communication of RIAs March 2009.
1 Atsuhiro Konosu Chairperson of Flex-TEG, Japan Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities.
GTR Industry proposal (update) to identify the relevant measuring results in FlexPLI to vehicle tests to be compared to the Flex-PLI requirements.
1 Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities Status Report on Flexible Pedestrian Legform Impactor.
© Mahindra Satyam 2009 PM/PL/ML Module QMS Training Mahindra Satyam Confidential.
Preparing for your HIPPY Accreditation visit Accreditation 101.
ARE YOU INTERESTED IN JOINING STUDENT COUNCIL? Open to 7th and 8th grade students. Pick up applications outside room 106.
Public Law Government Charge Card Abuse Prevention Act of 2012 (Charge Card Act) REPORTS December 2013.
GTR Durability Study SN03 at Bertrandt Laboratory Bertrandt Ingolstadt Ingolstadt, 19. March 2013, J.C. Kolb.
Flex-GTR Master Leg Level Impactor Test Data - Pendulum Test - June 28, 2013 Japan Automobile Standards Internationalization Center (JASIC) 1 GTR
RMC Auditor Workshop Charleston, SC July 2015 Registration Management Committee Company Confidential RMC Auditor Workshop Charleston, SC
GTR & Page 1 Technical Specification and PADI Procedures for Assembly, Disassembly and Inspection Presented by the pedestrian safety.
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.
1 Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities Status Report on Flexible Pedestrian Legform Impactor.
ISO 9001:2015/14001:2015 Certification Transition Process
Section 14.1 Teamwork Back to Table of Contents. Chapter 14 Teamwork and LeadershipSucceeding in the World of Work Teamwork 14.1 WHAT YOU’LL LEARN How.
The Successful Club Seris Creating the Best Club Climate.
Orientation to the Self-Assessment Process in Head Start.
BC SUPPORT Unit: Overview and update
Small Audit Shop Roundtable
2016 CA-2 Instructor Workshop
ACA – Fall Conference FAA AIP Grants Management
Commercial Operations Sub-Committee Update to TAC
Urban Audit The 2006 data collection
GTR EVS ‘Thermal propagation testing’ JRC Work Plan
Submitted by the expert from Republic of Korea
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Rating Community Goals: Appraising of Importance and Feasibility
Japan Automobile Standards Internationalization Center (JASIC)
Status report of the cycle and gearshift issues task force (GSTF)
2016 Summit: Planning a Technical Editing Progression
Working Party on General Safety Provisions (GRSG) General information
Summary of Proposed Amendment to gtr 9
Status Report of New Issues TF –CFD* sub wg
Dr. Phyllis Underwood REL Southeast
Inputs Regard to “Test Phase” to TFCS
WLTP Phase 1a Round Robin (European plan)
Tyre Industry workplan proposal to IWG Worn tyres
Palais des Nations, Geneva
Presentation transcript:

To Conduct FlexPLI Round Robin Car Test Smoothly and Effectively We had 10 organizations offering to join the FlexPLI Round Robin Car Tests. To conduct the FlexPLI Round Robin Car Test smoothly and effectively, we would like to take following steps: Step 1: Could you tell us how many master legs are needed in your test series? Step 2: Could you decide a "Region Leader" for each region (especially in Europe and the USA) by discussion among same region members? Step 3: Could you prioritize each region’s test contents (especially in Europe and the USA) by discussion among same region members? If the test content is necessary for IG discussion, its priority shall be high. If the test content is NOT necessary for IG discussion, its priority shall be low. Step 4: Could each region’s leader prepare a detailed test schedule for each region based on Step 3 results? Step 5: Could you tell Step 1 to Step 4 results to IG GTR9-PH2 Vice-Chair in order to organize over all test activity? Step 1: Could you tell us how many master legs are needed in your test series? Step 2: Could you decide a "Region Leader" for each region (especially in Europe and the USA) by discussion among same region members? Step 3: Could you prioritize each region’s test contents (especially in Europe and the USA) by discussion among same region members? If the test content is necessary for IG discussion, its priority shall be high. If the test content is NOT necessary for IG discussion, its priority shall be low. Step 4: Could each region’s leader prepare a detailed test schedule for each region based on Step 3 results? Step 5: Could you tell Step 1 to Step 4 results to IG GTR9-PH2 Vice-Chair in order to organize over all test activity? 3 August 2012 IG GTR9-PH2 Vice-Chair Objectives of FlexPLI Round Robin Car Test relating to IG GTR9-PH2 Activity To compare master leg test results with previous build level leg test results To investigate technical feasibility on car development Etc. (basically, to conduct tests which are needed for IG discussions) GTR9-4-08

We will have the 4 th IG GTR9-PH2 meeting in September 2012 (17 th -19 th Sep.) and the 5 th IG GTR9-PH2 meeting in December 2012 (just before 11 th Dec.). We highly appreciate to submit your test results to the 4 th and/or the 5 th IG GTR9-PH2 in order to make great progress of IG GTR9-PH2 meeting activity. GTR9-4-08

Appendix: Tips to Conduct FlexPLI Round Robin Car Test Effectively GTR9-4-08

Tips to Conduct FlexPLI Round Robin Car Test Effectively (1) Especially, if it is needed to investigate repeatability of car test results FlexPLI condition shall be verified by pendulum and (or) inverse certification tests before and after the car test series. Brand-new car parts (from the same batch) shall be used in the test series. Car body damages (parts that cannot be changed) shall be investigated after each car test. Test conditions (impact speed, etc.) shall be recorded in detail. Basically, the car test results are affected by impactor conditions, car parts/body conditions and test conditions, so careful checks of all details above is seriously needed. If those conditions are unclear, IG members cannot analyze/assess the car test results at all. Car Flex Car Flex Check impactor’s condition by certification test Flex Test conditions shall be recorded in detail. Test conditions shall be recorded in detail. Check impactor’s condition by certification test Change to brand-new car parts Change to brand-new car parts same batch Check car body damage (parts that cannot be changed) carefully after each test Check car body damage (parts that cannot be changed) carefully after each test If a test lab cannot conduct certification tests by themselves, the test lab shall offer to other test lab which can conduct certification test to conduct the certification test. GTR9-4-08

Tips to Conduct FlexPLI Round Robin Car Test Effectively (2) Especially if it is needed to investigate reproducibility of car test results Car Flex 1 Flex 2 Car Flex 2 Check impactors’ conditions by certification test Change to brand-new car parts Change to brand-new car parts same batch Test conditions shall be recorded in detail. Test conditions shall be recorded in detail. Check car body damage (parts that cannot be changed) carefully after each test Check car body damage (parts that cannot be changed) carefully after each test Flex 1 Flex 2 Check impactors’ conditions by certification test Flex 1 FlexPLI’s conditions shall be verified by pendulum and (or) inverse certification tests before and after the car test series. Brand-new car parts (from the same batch) shall be used in the test series. Car body damages (parts that cannot be changed) shall be investigated after each car test. Test conditions (impact speed, etc.) shall be recorded in detail. Basically, the car test results are affected by impactor conditions, car parts/body conditions and test conditions, so careful checks of all details above is seriously needed. If those conditions are unclear, IG members cannot analyze/assess the car test results at all. If a test lab cannot conduct certification tests by themselves, the test lab shall offer to other test lab which can conduct certification test to conduct the certification test. GTR9-4-08