EuCARD WP 7 – High Field Magnets Task 7.2 – Support Study Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 – Support Study.

Slides:



Advertisements
Similar presentations
Machine Tools And Devices For Special Technologies Plasma machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Advertisements

KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
1 What we know (and still don’t) on He II heat transfer through electrical insulation for accelerator magnets Bertrand Baudouy CEA, Irfu, SACM Gif-sur-Yvette.
BepiColombo Mercury Dust Monitor ( MDM ) P.1 BepiColombo MMO Payload Mercury Dust Monitor (MDM) MMO Science Working Sub-Group Meeting At Kyoto Univ. 22.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Mask-writing Strategies for Increased CD Accuracy and Throughput Calibrating Achievable Design Annual Review September 2003 Swamy V. Muddu, Andrew B. Kahng.
Towards sympathetic cooling of trapped ions with laser- cooled Mg+ ions for mass spectrometry and laser spectroscopy Radu Cazan.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
WUT Experience in Measurements of the Heat Transfer Thought SC Cable Electrical Insulation Jaroslaw Polinski*, Maciej Chorowski*, Michal Strychalski*,
October 30 th Advances in Heat Transfer in High Field Accelerator Magnet B. Baudouy CEA/Saclay - Dapnia/SACM Annual meeting CARE October.
HQ02b : Test plan overview Test plan overview: Main elements and Open questions H. Bajas TE-MSC-TF H. BAJASUpdate meeting on HQ02b assembly and test plan02/05/2014.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
Workshop on Beam losses, heat deposition and quench levels for LHC magnets, Geneva, 3-4 March 2005 Liquid helium heat transfer in superconducting cable.
Bias Magnet for the Booster’s 2-nd Harmonic Cavity An attempt to evaluate the scope of work based of the existing RF design of the cavity 9/10/2015I. T.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
CARE-HHH-AMT Workshop on Heat Generation & Transfer in Superconducting Magnets Paris, November 190th Experience at CEA Experience at CEA Jaroslaw.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Irradiation of insulators for EuCARD Workshop on Accelerator Magnet, Superconductor, Design and Optimization CERN Maciej Chorowski, Jaroslaw.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
Radiation Resistance G. Ambrosio Fermilab 2nd Joint HiLumi LHC/LARP Annual Meeting November, 2012 Frascati Work supported by the US LHC Accelerator.
UKNF 12 January 2005 Target Studies J R J Bennett RAL.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Giovanni Ciavola, JRA-07 ISIBHI JRA-07 Ion Sources for Intense Beams of Heavy Ions (ISIBHI) EURONS PCC Meeting, Groningen, Holland, December 2006.
FLUKA Meeting Milan Jul 2010 Work in the frame of the LHC Phase II Upgrade Previous work was dedicated to the study of the.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
EuCARD WP 7 – High Field Magnets Task 7.2 Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 Status report EuCARD HFM collaboration.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
Future Perspectives of the Bonn Polarized Target Since the mid 1980‘s: Bonn is a place of excellence in the field of polarized solid targets ! Still valid.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
Carmine SENATORE Département de Physique de la Matière Condensée & Département de Physique Appliquée Université de Genève, Switzerland Benchmarking of.
Real-Time FOS monitor DEPFET PXD and SVD Workshop in Göttingen E. Currás, D. Moya, I. Vila, A. L. Virto. Instituto de Física de Cantabria (CSIC-UC ) G.
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
SPES Target Group Data…… INFN-CISAS-CNR collaboration The Ablation Ion Source for refractory metal ion beams A preliminary design.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
MQXF Preliminary Dose Requirement G. Ambrosio, E. Fornasiere, E. Todesco Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi.
Cryogenic Safety- HSE seminar CERN,
X Z rotor Istator stator out of page ICD into page rotation axis
1 K thermal model for QUBIC
HIGH VOLTAGE ENGINEERING (HVE)
Task 5: High-Tc superconducting link Summary of work-package
Hervé Allain, R. van Weelderen (CERN)
Hervé Allain, R. van Weelderen (CERN)
11T Magnet Test Plan Guram Chlachidze
The R&D programme on High Field Magnets (HFM)
Quench estimations of the CBM magnet
HO Corrector Magnets: decapole test and future plans
THERMOGRAVIMETRIC ANALYSIS (TGA)
EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task summary
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Hervé Allain, R. van Weelderen (CERN)
2th EuCard Col/Mat WP Meeting
EuCARD2 WP 10.2 HTS Conductor

IT & D1 HeII cooling-variants
Jeremy Weiss & Danko van der Laan Chul Kim & Sastry Pamidi
Poster ID: FIP/P7-26: Preventive measures to avoid electrical arcing incidences in SST-1 PF current leads As a preventive measure to mitigate arcing inside.
PANDA Collaboration Meeting
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
MQXF quench heaters: tests and investigation (CERN)¶
Presentation transcript:

EuCARD WP 7 – High Field Magnets Task 7.2 – Support Study Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 – Support Study Status report EuCARD WP7 Collaboration Meeting – INFN-LASA Milano Maciej Chorowski, Jaroslaw Polinski, Piotr Bogdan Faculty of Mechanical and Power Engineering

2 Outline Sample irradiation Cryostat for electrical test Mechanical tests Thermal test at PWR Task 7.2 planning

3 Material burning during the irradiation

4 Pt 1000 sensor 1st possible reason: Lack of LN2 during irradiation? The samples holder is equipped with Pt1000 T sensor. In case of temperature exceed 80K the accelerator control system stops the accelerator

5 Material burning during the irradiation 2nd possible reason: Heat deposited in the irradiated sample creates LN2 vapor bubbles around the heated area. Due of that the cooling capacity of the coolant drastically decrease and temperature of the sample increase over the material melting or flash point Decision: reduction of the dose rate by 1/2 and see if the material is still burning for 50MGy of total dose Beam LN2 LN2 vapors Irradiated sample

6 Methods of the dose rate reduction 4s4s 6,67 ms N electrons/  s 4s4s 13,33 ms 2s2s 6,67 ms N electrons/  s 4s4s 6,67 ms 1/2N electrons/  s Original beam scheme Decrease of impulse frequency Decrease of impulse time Decrease of impulse intensity

7 Material burning during the irradiation Mix 71 Mix 237 LARP Lonza CE 1st package – irradiated with 16 kGy/min 2nd package – irradiated with 10.8 kGy/min

8 Irradiation plan prediction (based on the present irradiation procedure knowledge) End of EuCARD

9 Toward to complete the irradiation certification program in the EuCARD time frame Determination/confirmation of the maximum dose rate which not cause the sample burning Change of thermal properties test method –thermal conductivity and heat capacity in 4-300K temperature range can be determined on very small material sample by Institute of Low Temperature and Structure Research (ILTSR) in Wroclaw –the samples for this tests can be extracted from the electrical or mechanical samples after them tests –preparation of separated samples for the thermal tests, irradiated with 1 spot, can be considered Change of number of the irradiation spots on the mechanical samples from 4 to 1

10 Patterns for thermal samples - 4 spots, d= 17.5 mm

11 Preliminary mechanical tests Mech. sample preparation

12 Preliminary mechanical tests Mech. tests – irradiated samples BurnedNormal (Total dose: 0.5 – 0.7 MGy)

13 Outline Sample irradiation Cryostat for electrical test Mechanical tests Thermal test at PWR Task 7.2 planning

14 Electrical certification test cryostat Voltage source – up to 60kV

15 Electrical certification test cryostat stsus Cryostat was delivered at the end of August 2012 Instrumentation - ongoing Commissioning, determination of the test procedure and first tests – mid. of Oct. 2012

16 Outline Sample irradiation Cryostat for electrical test Mechanical tests Thermal test at PWR Task 7.2 planning

17 Mechanical tests status Update of existing mechanical set-up with elements allow measurements in LN2 is undergoing in collaboration with PWR MechLab The possibility and quality of the mechanical sample cut- off with WaterJet technique will be tested next weeks The PWR MechLab has possibility to test the sample with Fourier Transform Infrared Spectroscopy (FTIS) and with Thermal Gravimetric Analysis (TGA), what can provide more information about the samples destruction origin (thermal/radiation)

18 Outline Sample irradiation Cryostat for electrical test Mechanical tests Thermal test at PWR Task 7.2 planning

19 Thermal tests – test parameters Material: unirradiated Mix 71 (NED insulation) Thicknesses:  m,  m,  m,  m Bath temperature levels: 1.5K, 1.55K, 1.6K. 1.7K, 1.8K, 1.9K, 2.0K, 2.1K Dissipated heat range: 0÷125mW/sample = 0÷12 W/m 2 Heat step: 2mW Heat step time: min. 4 min Temperature increase range considered in post-test analysis: 10÷35mK Bath temperature stabilization: ±0.25mK

20 Thermal tests – set-up view

21 Thermal tests – test results Thermal conductivity

22 Thermal tests – test results Kapitza resistance

23 Outline Sample irradiation Cryostat for electrical test Mechanical tests Thermal test at PWR Task 7.2 planning

24 WP7.2 Plan

25 Summary The sample burning during irradiation has been found Decrease of the irradiation dose rate from 16.0 to 10.8 kGy/min avoided this problem, nevertheless the max allowed dose rate need to be found/confirmed To keep the EuCARD time scale the modification in the thermal property certification test as well as in the mechanical and the thermal sample irradiation pattern is proposed Cryostat for electrical certification tests has been delivered and is currently under instrumentation on PWr. First certification tests are foreseen for mid of Oct. Preparation of the mechanical certification test in the LN2 conditions is ongoing Thermal conductivity and Kapitza resistance values of Mix 71 (NED) insulation has been confirmed on the PWr HEII cryostat experiment