Endcap Integration Workshop: June 11-14, 20011 CSC Commissioning Andrey Korytov.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Line Efficiency     Percentage Month Today’s Date
Status of CMS CSC upgrade in LS1 Present CSC Status ME 4/2 project ME 1/1 project 5/20/2015 Petr Levchenko NEC 2013, Varna 1.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
US Some Preliminary Test Beam Results T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct , 2004.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
US FAST site EMU CSC test results – a global view from ROOT N. Terentiev (Carnegie Mellon University) Fermilab July 23, 2004.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
CMS Muon System Guenakh Mitselmakher University of Florida
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
Dec
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
ELENA installation progress F. Butin / ELENA collaboration.
Windows Server 2008 R2 Oct 2009 Windows Server 2003
University of Wisconsin
Jan 2016 Solar Lunar Data.
Technical Coordination Parallel Session November 2011, FNAL
T1 status (a selection from EDR presentations)
Colliding Beams Group Involvement In CMS (see also M
CMS RPC Endcap RE1 Status Report
Q1 Jan Feb Mar ENTER TEXT HERE Notes

Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com
Electricity Cost and Use – FY 2016 and FY 2017
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
CSC Electronics Installation and Commissioning Oct ‘06
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov

Endcap Integration Workshop: June 11-14, CMS schedule v31CMS schedule v31 EMU scheduleEMU schedule EMU installation windowsEMU installation windows Shipping containerShipping container Tests on arrival at CERNTests on arrival at CERN Quick pre-installation testQuick pre-installation test Installation/commissioning sequenceInstallation/commissioning sequence On-disk local commissioningOn-disk local commissioning Station commissioningStation commissioning CMS schedule v31CMS schedule v31 EMU scheduleEMU schedule EMU installation windowsEMU installation windows Shipping containerShipping container Tests on arrival at CERNTests on arrival at CERN Quick pre-installation testQuick pre-installation test Installation/commissioning sequenceInstallation/commissioning sequence On-disk local commissioningOn-disk local commissioning Station commissioningStation commissioningOutline

Endcap Integration Workshop: June 11-14, V31: March 2001

Endcap Integration Workshop: June 11-14, V31: May 6, 2001 Muon system installation windows v31: Austin Ball, May 6, 2001 ENDCAP: ========================================================================================= startfinishcomments ========================================================================================= YE-123 Jul 0214 Oct 02free access YE-122 Oct 0223 Apr 03share with YB- (no YB- work planned) YE-123 Apr 0315 Sep 03shared with vac tank & coil YE-112 Jan 0418 Feb 04free access YE-112 Jul 0403 Dec 04crane shared with UX supply YE-218 Jun 0214 Oct 02free access YE-222 Oct 0223 Apr 02share with YB- (no YB- work planned) YE-223 Apr 0315 Sep 03shared with vac tank & coil YE-212 Jan 0418 Feb 04free access YE-212 Jul 0410 Dec 04crane shared with UX supply YE-309 Jul 0214 Oct 02free access YE-322 Oct 0223 Apr 02share with YB- (no YB- work planned) YE-323 Apr 0315 Sep 03shared with vac tank & coil YE-312 Jan 0418 Feb 04free access YE-312 Jul 0417 Dec 04crane shared with UX supply ========================================================================================= YE+127 Jan 0315 Nov 03free access YE+117 Dec 0302 Mar 03free access YE+112 Jul 0430 Aug 04crane shared with UX supply YE+214 Oct 0215 Nov 03free access YE+217 Dec 0302 Mar 03free access YE+212 Jul 0402 Sep 04crane shared with UX supply YE+328 Oct 0215 Nov 03free access YE+317 Dec 0302 Mar 03free access YE+312 Jul 0415 Sep 04crane shared with UX supply =========================================================================================

Endcap Integration Workshop: June 11-14, V31: May vs. March 2001

Endcap Integration Workshop: June 11-14, FNAL--UC/UF Schedule

Endcap Integration Workshop: June 11-14, PNPI Schedule

Endcap Integration Workshop: June 11-14, IHEP Schedule

Endcap Integration Workshop: June 11-14, EMU Installation/Commissioning March V31 version

Endcap Integration Workshop: June 11-14, Shipping Containers –stacks of 5 boxes (easily re-stackable) –chambers are assembled and tested with electronics: once cover is taken off, one can connect and readout all electronics without extracting a chamber –HV and Gas connectors accessible without opening boxes: test for gas leaks test for broken wires and HV disconnections in air test dark current at nominal HV and nominal gas mixture

Endcap Integration Workshop: June 11-14, CSCs will arrive to ISR Gas pipes?

Endcap Integration Workshop: June 11-14, Handling on Arrival 1) Truck enters here 2) Unloading Stacks of 5 CSCs 3) Stacks are moved to the tunnel Semi-clean rooms?

Endcap Integration Workshop: June 11-14, ISR: storage hall 5) Pre-installation Test: –dark current test (nominal mix) –un-stack, spread, and open –use portable mini-FAST DAQ: LVDB mezzanine board ALCT self-test CFEB connectivity CFEB noise CFEB calibration AFEB connectivity AFEB noise ALCT/CLCT Self-trigger Glue alignment pads (?) –close and stack again –gas: Ar+CO 2 Notes: Italic--we may want to skip later ME1--may require pre-installation tests conducted twice (on arrival and before installation) 4) HV and Leak Test in boxes 4*) Broken CSCs go to semi- clean room for repair

Endcap Integration Workshop: June 11-14, SX5: installation/commissioning: tentative sequence under scrutiny ME2 (example): 36+18=54 CSCs –deliver to SX5 30 chambers (6 stacks) = (5 days) –(gas leak in FY02-03 when we have time) = (6 days) –burst of installation of “back” 4 CSC/day= 7 days XY –check for gas leak, in parallel with –burst of cabling/piping for back 4 CSC/day = 7 days Y –commission “back” 4 CSC/day (portable HV and DAQ)= 7 days Y –at the same time deliver to SX5 another 30 chambers= (5 days) –burst of installation of “front” 4 CSC/day= 7 days XY –check for gas leak, in parallel with –burst of cabling/piping for “front” 4 CSC/day = 7 days Y –commission gas/water for the station= 1 day Y –commission “front” 4 CSC/day (portable HV and DAQ)= 7 days Y –alignment photogrametry = 2 days Y = 45 days –after that maintain Ar+CO 2 gas flow, monitor gas leaks, test HV periodically X - need for crane, Y - need for cherry picker

Endcap Integration Workshop: June 11-14, Commissioning Tests to be based on FAST site DAQ MINIMAL COMMISSIONING TESTS are in BOLD 1 Assembly 2 Water leak 3 LV electronics turn-on 4 HV turn on (current and cabling) 5 ALCT self-test 6 AFEB Noise test 7 AFEB Connectivity & Alive 8 AFEB Threshold and Analog Noise 9 AFEB Time Delay 10 CFEB Noise 11 CFEB Connectivity and Alive 12 CFEB Calibration 13 Comparator Noise 14 Comparator Threshold 15 Left/Right Comparator Logic 16 Left/Right Comparator Offset 17 Neighbor Comparator Offset 18 Comparator Timing 19 Chamber gain map 20 ALCT self-trigger on cosmics (need gas+HV) 21 CLCT self-trigger on cosmics (need gas+HV) 22 High-statistics cosmics (strip analysis) 23 Performance vs HV 24 High-rate test

Endcap Integration Workshop: June 11-14, Commissioning Manpower Overall Coordination:1 FTE (senior) DAQ Expert:1 DAQ software expert ISR:1 expert, 2 techs –Receiving, quick check on arrival –Pre-installation tests –Repairs, replacement of boards SX5:2 experts, 2 techs –Signal cable dressing/tests (on disks) –Service cables (HV, LV, slow control), pipes, hoses… –Post-installation commissioning

Endcap Integration Workshop: June 11-14, Summary: : –next 6 mo:start forming a core of CERN-residing physicists define all steps and procedures both at ISR and SX5 2002: –January:First 10 CSCs will arrive to CERN-ISR –January:Portable DAQ and Equipment at CERN-ISR Test environment (gas, outlets, Ethernet, etc.) Working place (desks, phones, cabinets, etc.) CSC test and repair tooling, clean room –Jun-Aug:Pre-installation tests of 36 ME23/2 and 18 ME2/1 –June:One more portable DAQ and Equipment at SX5 Test and work environment –August:Finish YE-2 infrastructure –Sep-Dec:Installation/commissioning of ME-2

Endcap Integration Workshop: June 11-14, Summary: : –Jan-Feb:Pre-installation tests of 36 ME23/2 and 18 ME2/1 –Mar-Apr:Installation/commissioning of ME+2 –May-Jun:Pre-installation tests of 36 ME23/2 and 18 ME3/1 –Jul-Aug:Installation/commissioning of ME-3 –Sep-Oct:Pre-installation tests of 36 ME23/2 and 18 ME3/1 –Nov-Dec:Installation/commissioning of ME : –Jan:Pre-installation tests of 18 ME4/1 –Feb:Installation/commissioning of ME+4/1 –Mar-Jun:Pre-installation tests of 74 ME1/2, 54 ME1/3, 18 ME4/1 (Magnet test at SX5) –Jul-Aug:Installation/commissioning of ME+1/2 and +1/3 –Sep:Installation/commissioning of ME-4/1 –Sep:Pre-installation tests of 18 ME1/3 –Oct-Nov:Installation/commissioning of ME-1/2 and -1/3