North Island Grid Upgrade Proposal Presentation to the Electricity Commission Conference 22 May 2007.

Slides:



Advertisements
Similar presentations
Project Appraisal Module 5 Session 6.
Advertisements

Chapter 10 Dealing with Uncertainty Introduction ---exacerbated by regulatory & environmental uncertainty Restructuring of the electric industry,
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Energy Policy and Scotland’s Constitutional Future Setting the Scene John Paterson University of Aberdeen.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Economic Analysis Concepts. 2 Is the project justified ?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive.
4. Project Investment Decision-Making
Real Options and Transmission Investment: the New Zealand Grid Investment Test Glenn Boyle, Graeme Guthrie and Richard Meade EPOC Winter Workshop University.
Project Selection Three main categories of methods/approaches:  Strategic approach  Analytical approach  Financial methods.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Date (Arial 16pt) Title of the event – (Arial 28pt bold) Subtitle for event – (Arial 28pt) Internal models Gareth Truran Head of Department, London Markets.
U.S. LNG Exports – Prospects and Implications W. David Montgomery Senior Vice President NERA Economic Consulting PANC 2013 Annual Seminar May 21, 2013.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
1 Portfolio Analysis Mike Hopkins Senior Manager, Price Risk & Resource Planning.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Chapter 3 – Opportunity Cost of Capital and Capital Budgeting
U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Electricity Co-operation in North America: Effect on Price Electricity Co-operation in North America: Effect on Price.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
RTI,Chennai Learning Objective Given the concepts of Decision Analysis, Option Pricing and Investment Decisions, the trainee will be able to audit the.
Presentation by AER’s Consumer Challenge Panel (CCP) sub-panel 7 David Prins and Robyn Robinson.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
WLI REGIONAL KNOWLEDGE EXCHANGE WORKSHOP ON DECISION-SUPPORT TOOLS AND MODELS SEPTEMBER, 2013, JERBA, TUNISIA Economic analysis of improved water.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Network Customer Meeting Access Metric Update November 16, 2006.
Chapter 6 Investment Decision Rules
Lyndonville Electric Department Feasibility Analysis Review December 2,
Project Selection Models. Project Selection Project selection is the process of evaluating individual projects or groups of projects, and then choosing.
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
UK Parliamentary Committee Report on PFI (PPP) August 2011 All PFI projects have to complete a Value for Money (VfM) assessment of the PFI option compared.
Chapter 3 Arbitrage and Financial Decision Making
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
Developing a Framework for Offset Use in RGGI Opportunities and Risks Dale Bryk, NRDC and Brian Jones, MJB&A – Northeast Regional GHG Coalition RGGI Stakeholder.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Transmission Pricing Methodology Presentation to the Electricity Commission Conference 26 April 2007.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Risk and Capital Budgeting 13.
CHAPTER NO. 4 CAPITAL BUDGETING. 2 Capital and Capital Budgeting Capital: is the stock of assets that will generate a flow of income in the future. Capital.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Software Project Management
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Angela Beazer Solicitor TCs AND STCs: ASSESSING WHAT MAY BE “CONTRARY TO THE INTERESTS OF AVIATION SAFETY”
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Electricity security of supply review Public hearing 24 April 2007.
Budget Presentation 2010/2011 – 2013/2014 All Communities 28 January 2010.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Northwest Power and Conservation Council The Northwest Experience with Energy Efficiency As A Resource Option Tom Eckman Manager, Conservation Resources.
Briefing for financial market analysts 30 April 2013 Draft report on the effectiveness of information disclosure regulation at Auckland Airport.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Diversification of Energy Power Plants in the North of Chile Matías Raby.
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
Regional Implications of the Clean Power Plan Lanny Nickell Midwest Energy Policy Conference October 6 th,
Submission on the draft ODV Handbook WEL Networks 14 th April 2004.
WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.
Project Selection Three main categories of methods/approaches:
EIA approval process, Management plan and Monitoring
Transpower New Zealand Ltd March 2005
Overview of New Control Room Desk
SOUTH AFRICAN INSURANCE ASSOCIATION
Wholesale Electricity Costs
Stakeholder Engagement
Presentation transcript:

North Island Grid Upgrade Proposal Presentation to the Electricity Commission Conference 22 May 2007

2 Outline MEUG introductory statement Commission’s assessment Our concerns: – Addressed – Remaining Others’ submissions

3 MEUG introductory statement Concern that last minute issues not properly resolved or consulted on High risk the Environment Court will find detriments of 400 kV relative to 220 kV > $11m GIT difference Remaining unresolved issues largely tend to close or reverse the $11m GIT gap

4 MEUG introductory statement On the whole, including GIT assessment and likely Environment Court process, 220 kV is the better option MEUG recommend EC should decline 400 kV and Transpower should resubmit new GUP for 220 kV

5 Commission’s assessment Satisfied that Transpower’s amended proposal meets grid reliability standards Satisfied that Transpower has complied with relevant Rules processes Grid investment test: – Three commissioners conclude it meets the GIT – One commissioner considers it doesn’t – alternative option meets grid reliability standards at lower net market cost

6 Our concerns – addressed Commission’s assessment addressed a number of our concerns about Transpower’s amended proposal

7 Our concerns – addressed Rejected Transpower’s use of solely higher growth scenario demand forecasts: – Used 2005 initial SOO demand forecasts – Lower demand scenarios from draft 2007 SOO in sensitivity analysis Allowed for uncertainty in demand growth rates and generation Used extended variant of “low demand” market development scenario from 2005 initial SOO

8 Our concerns – addressed Engaged PBA to scrutinise Transpower’s capital cost estimates Indicated intention to approve amount sought or actual costs, whichever is lower Confirmed the capacity figures for Otahuhu to Whakamaru A and B circuits were subject to a typo

9 Our concerns – addressed Modelled analysis period of 20 years + terminal benefits Applied discount rate of 7%, 4-10% in sensitivity analysis Adopted unserved energy value of $20,000/MWh

10 Our concerns – addressed Disregarded alleged business confidence benefits of effects on foreign direct investment and economic growth

11 Our concerns – remaining Likelihood of sufficient surplus generation to require proposed additional Whakamaru to Auckland transmission capacity? Any operating expenditure included in $27 million investigation costs sought?

12 Our concerns – remaining Opportunity benefits under some options through ability to adopt future new technology? Impact on analysis and preferred option of including reasonable allowance for demand-side management in non-transmission alternatives? Technical and operational issues in series compensation and decommissioning of 110kV Arapuni to Pakuranga line?

13 Our concerns – remaining 400kV amended proposal vs. 220kV alternative option Higher cost – Commissioner Pinnell’s alternative NPV calculations show: – Amended proposal is the higher cost option (by $39-45 million) up to 220kV capacity until around 2050 – Without any cost advantage in lower costs future development options

14 Our concerns – remaining Management of outages – vulnerability to infrequent but significant events: – Single 400kV line – may not meet good electricity industry practice – Highly likely that second 400kV line would be required before acceptable to energize first line at 400kV capacity Option value – 220kv alternative option allows for new technology providing lower cost future development options

15 Our concerns – remaining Environmental costs: – Likely to be significantly higher for amended proposal – Likely to outweigh small alleged economic advantage of amended proposal and unquantified benefits – If amended proposal rejected under RMA, reconsidering and re-consulting on options would further delay approvals process – Recommend against approving at this stage a proposal which would almost certainly not be granted RMA approval

16 Our concerns – remaining Commencement date: – In response to original proposal Commission suggested new lines should be constructed from 2017 and this was a low-risk decision on timing – Commission now proposes to accept a proposal with new line construction in 2013 – Reason for change in view not clear Duplexing option: – Warrants further consideration – Technically sound solution – Defers need for major line construction

17 Others’ submissions Genesis: – Supports exclusion of costs and benefits of conversion to 400kV on grounds they are too uncertain and distant We suggest Commission needs to ensure that it is not discounting real options the 400kV will forestall but which the alternative allow – Argues GIT requirement for option with lowest NPV – too constraining Sensitivity analysis is designed to deal with uncertainty; an ad hoc fudge factor should be viewed with caution

18 Others’ submissions Meridian: – Argues that due to GPS, gas availability and carbon charges future generation development will see more renewables, less gas and sees renewables as largely coming from the south. It argues this justifies major transmission investment Underlines the urgent need for the TPM to send the right locational signals to generators now – Argues that for environmental reasons we should minimise the number of additional transmission lines needed Is this not an argument for duplexing, which Meridian dismisses?

19 Conclusions Very important decision, large sums at stake The submission process underlines to us the urgent need for the TPM to send the right signals to generators now Amended proposal: – Higher cost option up to 220kV capacity around 2050, in addition 220kV offers option of new lower cost future development – May not meet good electricity industry practice, highly likely that second line would be required before acceptable to energize first line at 400kV capacity – Higher environmental costs, likely to outweigh small alleged economic advantage of amended proposal and unquantified benefits (some of which are dubious) – almost certainly will struggle to be granted RMA approval