REVIEW APPROVAL AND RECORD KEEPING PROCEDURE. 001-17628 Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # 001-12362 Rev*C Document # 001-12362.

Slides:



Advertisements
Similar presentations
Publication Module using back end interface. Institution Data Entry Add Documents. Edit/Delete Documents that are added but not yet sent to Institution.
Advertisements

Welcome to Online HRS All your Human Resources needs in one easy to follow database system.
Secretary Duties and OPR Training
Manage Transfer Students. C3-TF Manage Transfer Students by School Student Registrar Description: –This function allows the School Student Registrar to;
EvalS Application User Guide version September 17, 2011.
LeaveTraq Training for Managers HUMAN RESOURCES DIVISION OF FINANCE.
WELCOME TO. This program will allow you to easily receive and respond to leads issued from your Convention and Visitor Bureau…All directly through the.
Objectives The Government of India and Government of Karnataka has constituted the Private Security Agencies Regulation Act, 2005 and Karnataka Private.
Guide to using the myNATE website
In the top right hand corner you will type in your package code in the box that says “Place Order.” Then you will click “Go.”
 Sertifi automates the process of sending and obtaining documents for approval and signature. A completely secure web-based solution, senders and signers.
Page 1 of 36 Respective of PNG Tenure Regulation Sections 19 to 23; when Crown land is leased without a producing well and is being drained by a freehold.
REVIEWER NAVIGATION GUIDE OnBase Conflict of Interest Disclosure System If the Reviewer has any concern that information may be missing, the disclosure.
Using ITAMS as a Supervisor or ITAMS Approver Login to ITAMS as usual, at: Enter your User Identification Number (Same as your.
New School Process Please read the following slides carefully, as they provide helpful information about the new school account creation process.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
Engineering Document Repository & Electronic Signature (E-Sign) Tutorial 1 DCG- Revision C 7/25/2014.
School of Psychology Online Ethics Guide No. 1 Submitting an application for ethical review. JRC/13/10/2014.
LMS Gap Analysis 6/15/2011 Department of Personnel.
Mentor ePolls Polling for Groups. 2 What is ePolls? ePolls is the newest feature of Mentor, the IEEE tool for Working Group collaboration. ePolls allows.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
Komen Grants eManagement System GeMS. Why Online Grants  Reduce the amount of administrative paperwork being completed by applicants and grantees. 
Welcome to BLT Online NQT Induction. Points We Will Cover: What is BLT Online NQT Service? What are the advantages of using it? User roles on the site.
NATE Training Provider Portal Guide to using the myNATE website Submitting Class Rosters.
Welcome Document Imaging System Training Dial in number: (559) Participant Access Code: #
Submitting and reviewing promotion applications in Vibe.
Hunter Valley Amateur Beekeepers Forum User Guide Guide shows sample screenshots with most relevant actions. Website is at
Getting Started- Online Submission You can access your Online Portfolio account from inside your Member Console area ( or.
NACCED Conference Tech. 101: Making Your Grants Dance September 19, 2011 Presenter – Scott Stevenson, L.A. County CDC.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Mentor ePolls Polling for Entity Working Groups. 2 What is ePolls? ePolls is the newest feature of Mentor, the IEEE tool for Working Group collaboration.
1 SCHOOL-WIDE PERFORMANCE BONUS PROGRAM (SPBP) Instructions for Compensation Committees.
Managing Student Documents. What we will cover: Document Basics Document Categories Confidential Documents Document Forwarding Document Approval Document.
Environment, Health and Safety OARS Online Accident Reporting System A guide to the University of Calgary’s new web- based On-line Accident Reporting System.
Graduate Degree Progress & Clearance Graduate School Office Amy Gillett and Amy Corr.
Material Review Board (MRB) System Training
Outlook Workflow Process Director Approval IRB Submittal Outlook VP Approval Finance Approval 5 IRB Final Approval.
NEW FOR 2009 Faster, Easier, Friendlier. Before you start Any student, staff, or faculty member can file an accident/incident report. Accident reporting.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
HR Action Request The Ohio State University OAA HR Service Center.
Secretary Duties and OPR Training
Baseline Edge Task Force Training
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
STUDENT FACULTY / ITP COMMITTEE SENATE START 2. Look for company for ITP placement END 1. Generate the list of eligible students for ITP and conduct briefing.
Creating and Editing a SEI Project Updated: May 18, 2011 – for Six Seconds’ Tools Intranet available May 30, 2011 Creating and Editing a SEI Project Updated:
Meetingangels.com Service Buyer. Front Page 2created by ilancecustomization.com.
Thesis Defense and Submission 1 Spring  Register for Spring semester  Deadline to submit thesis to GPS: Friday, April 22 nd at NOON  Deadline.
Signing a Document Digitally Click when you are ready to begin the tutorial.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Proprietary + Confidential1 Supplier iPPAP Training.
Collecting Copyright Transfers and Disclosures via Editorial Manager™ -- Editorial Office Guide 2015.
Document Module Features Streamlines the control, routing and revision process for critical documents and records Controls documents in any format (Excel,
Submitting Your Thesis/Dissertation into Digital Southern.
Online Recruiting System Hiring Manager Presentation This presentation will take about 15 minutes. Click on your mouse to go to the next slide OR click.
One to two days after he submits his “DRA2+ App Admin Request” online form, DA receives Account Activation from Pearson, with link to self- register.
SCC P2P – Collaboration Made Easy Contract Management training
E-JPPAP User Guide _ Supplier
Submitting and reviewing promotion applications in Vibe
Document Management Lindsey & Krystian.
Administrator Training
Ariba Contracts: Initiate eSignature
Reliance Supplier Corrective Action Process
AmeriCorps Member Tutorial – OnCorps Reports 2.0, Standard Reports
Online Training Course
Reliance Supplier Corrective Action Process
To the ETS - Offset Notice Response Training Course
Steps in the TDES Evaluation Process
Using AIM (for Registered Students):
Submitting and Accessing 5-year Post-Tenure Review Materials in Vibe
Presentation transcript:

REVIEW APPROVAL AND RECORD KEEPING PROCEDURE

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 2  Use Change Management System (CMS) to approve reviews  To shorten the turn around time of obtaining approvals from both SPML and SPSV review committee members  Recordkeeping of passing and non-passing reviews  Control access to presentations using DMS Objectives

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 3 All product, process, equipment, and test reviews for new designs or changes should use this procedure.  EPR (Level 0 - 4)  PCR (Level 1- 4)  SPC (Level 1- 6)  TLD (Level 1- 4)  TCR  CR  Other Related Reviews  NOTE: Stage Gate Reviews are saved in the PMO intranet Reviews to be logged

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 4 Why Keep Reviews?  The presentation materials includes important information that could be pertinent in the future.  As a tool for tracing what happened in the past.  Previously, reviews were to be ed to DCON after passing and then archived in the Outlook Public Folders. As of Q206, >300 EPRs that had passed still needed to be sent to DCON.

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 5 Passing Guidelines  A presented review with Gating ARs does not pass.  A review is not passed until it is in the DMS (not just uploaded as an ECN).  A logged review should gate passage of the NEXT stage gate review, e.g.SPC5 cannot pass if SPC4 is not logged

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 6  Passing and non-passing presentations are stored in the DMS - Document Management System Where Stored?

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 7 Whose approval?  Approvers are usually identified in the applicable templates which are located in the DMS.  Presenter must bring the Presentation Review Attendance Sheet ( ) to the presentation.  At least 75% of the approvers is needed to start a meeting.  If a quorum is achieved, those who are not present (the 25%) and do not send a delegate approve automatically.  Presenter should get all required hard-copy signatures at the end of the review meeting. (this must be done real time)  People who are on remote like Videocon, conference bridge, must give their verbal approval and the presenter records their approval in the attendance sheet as “Verbal approval by via and witnessed by ” with signature of witness (not the presenter).  Presenter then scans the Presentation Review Attendance Sheet ( ) paste into the presentation and uploads to CMS with DCON as the only approver.

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 8 Presentation Review Attendance Sheet ( ) Complete this form before presentation, including filling out the names of the Required Attendees base from defined approvers per review If 75% of the required attendees (or delegates) were present, proceed with the presentation. The 25% were considered automatically approved Ask the actual attendees to affix physical approval (signature) in the attendance sheet. This must be done “real time” (right after the presentation) For approver who are on remote access, ask their verbal approval, write their verbal approval opposite to their names, witness must affix signature Sign Minutes taker / Verified by portion Scan attendance sheet, paste in slide2 of the presentation

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 9 OBTAINING A DOCUMENT NUMBER IN DMS (before presentation)

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 10  Key-in title “take note of the naming convention” Product = Cell, Module, or Systems Tool = Vendor name, Machine (e.g. MRL Diffusion Furnace) Line = Line applicability (e.g.. Line2, Line8, Line 12, etc.) Review = EPR, CR, SPC etc. Level = SPC6, EPR4, EPR1.5 etc.  Select appropriate Category Request a Document Number in DMS  All presentations will be registered in DMS

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 11 Request a Document Number in DMS  This step requests final confirmation of entered information. Click appropriately either on Back or Create button. SUNPOWER CELL REVIEW SUNPOWER CELL RANTEX L5-6 EPR1 STEPSTEP 32 4  This document number should be included in the presentation before it is presented.

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 12 BEFORE UPLOADING TO CMS

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 13  Complete AR’s and make whatever necessary modifications to slides to reflect AR completion.  Scan the completed Presentation Review Attendance Sheet ( ), paste it in slide 2.  For EPR’s and PCR’s,  Update the AR Status Review Slide - should include AR’s from past and current EPR’s. Modifications to Presentation

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 14  Non-passing or Failing Review should also be submitted by the presenter as an ECN.  Add gating and non-gating AR’s to the presentation  Add ‘watermark’ on master slide to include “Presented Not Passing”  Start ECN. In “Description of Changes” add “Presented. “Not Passing”  Include DCON admin as the only approver of the ECN  When ARs are complete, download the presentation from DMS and make necessary changes  If presentation is required, then present to review committee, otherwise send via  Document the result whether passing or not as a revision to the existing document, updating document number revision to *A  Repeat until review passes Non-passing Reviews Presented : May 11, ‘08 Result : Not Passing

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 15 UPLOADING PRESENTATIONS INTO THE CMS

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 16 - From the SPML or SPSV intranet, click on “Change Management System” Key-in Cypress Initials and password. Access to CMS

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 17 Initiate ECN

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 18 SunPower Cell Reviews SunPower Module Reviews SunPower System Reviews Upload source and pdf files. All these categories are restricted and have limited access for- viewing. Only selected individuals can view. Initiate ECN

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 19 Source–.ppt presentation PDF –.pdf file Document Number Format: 001-xxxxx Enter exactly as in DMS and on document File name of the presentation to be uploaded should start with the document number Example: Initiate ECN New Rev Enter ** for initial issue. Increment by one level if document is a revision. Current Rev New document? leave this blank. Revision? Enter current revision level **, *A,*B,*C …

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 20  take note of the naming convention at every slide of the presentation:” Product = Cell, Module, Systems Tool = Vendor name, Machine (e.g MRL Diffusion Furnace) Line = Line applicability (eg. Line2, Line8, Line 12, etc.) Review = EPR, CR, SPC etc.. Level = Level of presentation (eg. SPC6, EPR4, EPR1.5 etc.) Presentation Naming Convention Enter presentation Doc # and revision status (document number from DMS)

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 21  In the “Reason for Change” box, specify the date of review and it’s result.  (Reviews w/ gating AR’s are considered “Not Passing.”) Initiate ECN -DCON will be the only approver of the ECN -Submit the ECN for approval

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 22 Upon release of ECN in the Document Management System (DMS) the originator, normal review committee members, and alternate signers will be notified that a certain review had been released in the DMS. They will also be given an access to the document. Automatic Notification in DMS

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 24 PROCESS FLOW Present Review At the end of presentation, ask for physical signature of the actual attendees (required / alternate approvers) in the Presentation Review Attendance Sheet ( ) Needs Revision? Yes No Yes Download source file from DMS, update presentation, level up revision status, present to the board and ask approval. Presentation is kept in the DMS Create ECN and upload the presentation with signed attendance sheet ( ) add DCON as the only approver of the ECN Release the Review in DMS

Rev *A REVIEW APPROVAL AND RECORDKEEPING PROCEDURE Document # Rev*C Document # Rev*E 25 - END -