South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess.

Slides:



Advertisements
Similar presentations
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee July 11, 2007 Meeting.
Advertisements

City of Hubbard Transportation System Plan Update April 25, 2012.
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Fern Valley Interchange Public Hearing November 3, 2010.
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
CEM-512 Value Engineering Highway Project: South Interchange.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
June 18, 2013 WINDSOR PARKWAY – ROSWELL ROAD INTERSECTION RELOCATION FEASIBILITY ANALYSIS.
Module 7 Exercise Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users.
Reston Master Plan Thoughts on transportation. Focus is important Without the proper transportation groundwork other plans will fall through.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
CITY OF TIGARD Respect and Care | Do the Right Thing | Get it Done City of Tigard Economic Opportunities Analysis May 10, 2011City Council Public Hearing.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
Proposed CBS Municipal Plan and Development Regulations Amendments for Backlot Development Municipal Plan Amendment No. 9, 2015 Development Regulations.
Mario Fiorillo – Transportation – Civil Mario Fiorillo Present work experience Florida If you have any questions please me at
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Land Use Study for the Community of Winchester July 9, 2012.
Welcome. Challenges  Overcoming perceptions, some real, that  Gardner is not open for business  We aren’t consistent in the application of our codes.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
City of Palm Coast EAR Public Input Process Update Prepared for the Palm Coast City Council By The FCRC Consensus Center November 24, 2009 Update Prepared.
Astoria Riverfront Vision Code Assistance The City of Astoria, Oregon Town Hall Meeting August 20, 2015.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Ordinance No XX Application LU-MIN Small-Scale Future Land Use Map Amendment Twenty Fingers Property June 5, 2007 City Council Meeting.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
Fehr & Peers | March 13 th, 2012 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
 May 1, 2012 City Council approved lease of premises at MLK to the Lycée Français La Pérouse (the “Lycée Français”)  Under section 16.5, Traffic and.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
RIVERSTONE CONNECTION STUDY Task Force Meeting #4 June 19, 2013.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
Transportation System Comments Santolina Level ‘A’ Master Plan.
Excerpts from North Loop Neighborhood Plan. The intersection of Airport Boulevard and 51st Street is seen as one of the most important in the neighborhood.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
POM & I-84/US 730 IAMPs Morrow County Planning Commission Hearing December 20, 2011.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
CFT Gateway Center ( E. Foothill Blvd
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
Technical and Public Advisory Committee Meeting #3
Draft Transportation Element September 6, 2017
River to Sea TPO Meeting US 92/International Speedway Boulevard
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
OR 99E Corridor Segment Plan
Stockton City Council December 6, 2007 Land Use Diagram Changes
Joint City Council / Planning Commission
115-Unit Mixed-Use Project (711 E
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess alternatives F Next steps

Goals of S. Pkwy Refinement Plan F Eliminate the last three signals on the South Parkway (Powers Road; Pinebrook Boulevard; South Third Street) F Ensure east-west connectivity across the Parkway for vehicles, bicyclists, and pedestrians

South Parkway Plan Major Issues F Access to Parkway vs. mobility on Parkway F Potential location of local grid streets F Impacts to residential neighborhoods F Impacts to commercial lots by Third F Fate of split-zoned lots to west of Parkway F Timing, funding of identified improvements

S. Pkwy: General Location Study Area

South Parkway Traffic GoaIs F Accommodate free-flow movements from Third Street to Parkway F Utilize local streets to link neighborhoods west of Parkway to businesses along Third Street and points east F Develop a network of frontage roads and city grid streets to let local traffic circulate through the area without using Parkway

Traffic GoaIs (con’t) F Resolve access issues to vacant properties south of Murphy and west of Parkway F Determine whether to continue to allow all crossing and/or turning movements at intersection of 97 and China Hat-Ponderosa

South Parkway Land Use Goals F Minimize disruption to neighborhoods by utilizing existing streets, “stubbed out” streets, or rights of way F Look at possibility of mixed-use zoning for large vacant parcels F Ensure development is consistent with Oregon Highway Plan F Maintain compatibility with zoning

Items Common to All Alternatives u Grade-separated Powers u Badger Road disconnected from Pkwy u Pinebrook disconnected from Pkwy on west u Murphy Road realigned to south u Murphy Road crosses over Parkway u Murphy Road extended to Brookswood

Items Common to All (con’t.) u Frontage road from Blakely going south to Ponderosa on west side of Parkway u Romaine Village Way disconnected from 97 u Northbound slip lane from 97 to Third Street u Ponderosa-China Hat/97 either a right-in, right-out or an overcrossing

South Parkway: Alternative A F Loop ramps to/from Parkway F Allows all movements to/from Parkway & Third St. F Emphasizes local access

South Parkway: Alternative A F Murphy/Third has a V/C of 1.24 F Southbound free-right gets V/C to 0.67, but disadvantages pedestrians F Queueing at Pinebrook/Third for 15-35% of peak hour

South Parkway: Alternative H F Flyover ramp from S/B Third to S/B 97 F Accommodates fewest range of movements F Emphasizes mobility of through traffic

South Parkway: Alternative H F Murphy/Third has V/C of 0.65 F Southbound queueing problems 20-35% of Third/Powers in peak hour F Model shows local traffic shifts from Parkway to Powers

S. Pkwy: Alternative H-Modified F Flyover ramp from S/B Third to S/B 97 F S/B only off ramp from Parkway to frontage road F Balances local and through traffic

S. Pkwy: Alternative H-Modified F Murphy Road/Third Street has V/C of 0.65 F Least queueing problems of all alternatives F Model shows slightly better distribution of traffic compared to others

Consistent with Goals, Policies u City rankings for Comp Plan, TSP goals: ¶ Alternative A · Alternative H Modified ¸ Alternative H u ODOT rankings for Oregon Hwy Plan: ¶ Alternative H · Alternative H Modified ¸ Alternative A

ODOT, City Continue to Discuss Alternatives A, H, H-Modified u Access to Parkway u Mobility on Parkway u Location of frontage roads, city streets u Consistency with policies in City’s comprehensive plan, Oregon Highway Plan u Public comments relate to proximity to suggested alternative(s)

South Parkway Next Steps F Informational presentation to Bend City Council F Based on today’s OTC briefing and Bend City Council input, select final preferred alternative F Formal adoption of preferred alternative by OTC F Amend City of Bend’s TSP