بســـــــــــم الله الرحمن الرحيم Graduation Project 2 Presentation New Design of a Multipurpose Building Prepared By : Amjad Zidan Osama Rashad Ashraf.

Slides:



Advertisements
Similar presentations
An-Najah National University Faculty of Engineering
Advertisements

Architectural modifications Structural design Environmental design Internal system design Main tasks.
Abstract This project is a structural analysis and design of a residential building located in JENIEN City, The building is consisted of 7 floors. The.
An Najah National University Building Engineering Department Potential Energy glazing Technologies For Highly Glazed Buildings in Palestine Prepared by.
Outlines:-Outlines:- Environmental Design. Architectural Design Modifications. Structural Design Quantity compare Lighting and Mechanical Design.
Al-Najah National University Building Engineering department Design Of Cancer Center Prepared by:- Asma Atout, Najah Zadah and Rana Johary Supervisor:
An-Najah National University Engineering college Building Engineering Department Health Center Prepared by: Sobhi Ibrahim Islam Ammar Mohammad Odeh Supervisor:
Supervisor: Dr. Mahmoud Dweikat.. Outline: 1. Introduction. 2. Static design 3. dynamic design 4. Conclusion.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
Chapters Project title : Hirbawi Center A building lies in the east side of Tulkarm, this building consists of five stories of ( m 2 ) A building lies.
An- Najah National University 12/29/20131Multisport hall.
7 Mini Mall Design. Connection Quick View Architectural view.
An-Najah National University Faculty of Engineering Civil Engineering Department.
1. Out line  Site description  Architectural Design.  Structural Design  Environmental Design.  Mechanical design  Safety design An-Najah National.
By : Bara Thaher Mohammad Sameer Osama Joma’a Supervisor : Dr Sameh Mona Climate Responsive Design For Administrative Building In different climate zones.
Project ASolar ExposureProject B Solar Exposure
An-Najah National University Faculty of Engineering Building Engineering Department Graduation Project – 2 Integrated Design for Hotel Prepared By: Ahmad.
GRADUATION PROJECT II BUS & TAXI STATION Prepared By: Abeer Hawash Afnan Foqha Haya Awad An-Najah National University Faculty of Engineering and information.
Graduation Project report- II
}السلام عليكم ورحمة الله وبركاته{
An-Najah National University Faculty Of Engineering
Eng. Abdulhakeem Juhari
Prepared By: Dana Heigeh Isra’ Atallah Manar Raddad
Mechanisms. Mechanisms Outline: Architecture design Environmental design Structural design Electrical design Mechanical design Quantity surveying.
Design of an integrated 5-Star Hotel
An-Najah National University
Integrated Design Of Beauty Center & Wedding Hall
Coverage of Hikmat-Almasri Stadium
Prepared by : Reham Asaa’d Supervisor : Arch. Moa’yad Salhab
An-Najah National University Secondary School Design
An-Najah National University Building Engineering Department
Integrated Redesign of Rehabilitation Center for Mentally Disabled
An-Najah Sport Center An-Najah National University
“Nablus Municipality”
An-Najah National University Faculty of Engineering
AQQABA SECONDRY SCHOOL Structural Design.
Towards Green Building
Kindergarten Amani Nasasrah , Enas Awad Shadia Yamin , Sondos Ghanim
Chamber of Commerce & Industry
جامعة النجاح الوطنية كلية الهندسة قسم هندسة البناء
Studying Geothermal Heat Pump in Palestine
Redesign Of Integrated Car showroom
Redesigning of a Primary school
An-Najah National University Building Engineering Department Graduation Project 2: Design Orthopedic Specialist Hospital Prepared By: Mohannad Iyad Al-Shak’a.
Integrated design Of Fuel Station
Eng. Abdelhakeem Al-jawhari
A comprehensive design of Dorms For Nursing College
Moutasem Awwad Supervisor: Eng. Fadi Fatayer
An Integrative Design Of Residential Building
Restaurant Design Graduation Project “2” Prepared by: Isra’ Hasan Ali
An-Najah National University Faculty Of Engineering Building Engineering Department Graduation Project – II People with special needs school Prepared.
Graduation Project 2 Redesigning a Villa
Ahmad Daraghmeh. Asem Mayyaleh. Mustafa Fashafsha Abdassalam Najim.
Integrative Design of a Secondary School
Stock Exchange building design
Mulit functional Building design Graduation Project “2” Prepared by:
What is the best method for constructing schools in Palestine ?
Environmental Friendly Multi purpose–Hall Design
Simulation Analysis for Green Design of Building Envelope
Graduation Project – 2 Mini-Mall
An-Najah National University
Analysis and Redesign of Al – Tatbeqea Faculty
Prepared By : Supervisor : Eng. Abdulhakeem Al- Jawhari Hareth Jepara
Villa Graduation Project 2 Prepared By : Abdalla Naem Dwikat
The sport hall.
Introduction.
An Najah National University
بسم الله الرحمن الرحيم RaRami Abu Baker An- Najah National University
بسم الله الرحمن الرحيم.
Presentation transcript:

بســـــــــــم الله الرحمن الرحيم Graduation Project 2 Presentation New Design of a Multipurpose Building Prepared By : Amjad Zidan Osama Rashad Ashraf Moshref Supervised by : Eng. Mo’ayad Salhab

Project Main Idea

Summary : 1- Architectural Design 2- Environmental Design 3-Structural design 4-Mechanical design 5-Electrical design 6-Safety & Fire Design 7-Quantity Surveying & Specifications

ARCHITECTURAL DESIGN Basic Elements : 1- The Main Entrance 2- The Main Hall 3- Stairs

Site Plan

Main Hall Main Hall

Stairs

Stairs

Ground Floor

Second Floor Offices

Offices

3 rd & 4 th Floors Residential

Residential

Ramps

Ramps Location

Environmental Design 1- Acoustical and Thermal Insulation 2-Natural Day Lighting 3-Shading

Acoustical and Thermal Insulation Acoustical and Thermal Insulation Type of materialThicknessK ( w/m.k)R ( m 2.k/w)STC (db) Outside…………. 0.04………… Stone Rei. Concrete Polyurethane foam Gypsum Board Cement Plaster with lime Rock wool Inside……………………..0.13……….. Total R1.817Total STC U(w/m 2 )0.5563

Acoustical and Thermal Insulation Type of materialThicknessK ( w/m.k)R ( m 2.k/w)STC (db) Outside…………. 0.04………… Cement Plaster with lime Hollow Block Polyurethane foam Gypsum Board Cement Plaster with lime Inside……………………..0.13……….. Total R1.427Total STC U(w/m 2 )

Acoustical and Thermal Insulation Type of materialThicknessK ( w/m.k)R ( m 2.k/w)STC (db) Outside…………. 0.04………… Cement Plaster with lime Hollow Block Gypsum Board Cement Plaster with lime Inside……………………..0.13……….. Total R1.15Total STC U(w/m 2 )0.8745

Natural Day Lighting Shape of building on Ecotect

The Shadow of the Building in summer Building shadow at 8am 15 th of May

The Shadow of the Building in Winter Building shadow at 8AM 21 st of January

The Sun Path in Summer in May

The Sun Path in Winter in January

Daylight levels samples of selected areas in the building Hall in Ground Floor Daylight levels

Shop 9(cafeteria) Daylight levels

Staff Room office 6 daylight levels

Shading For south elevation Cantilever For East/West elevation Vertical shutter

Structural Design The design codes used in the design process in our project : American Concrete Institute ACI The seismic design code UBC97

Loads and Specifications Live Load : In Mall 0.5ton/m2 (500kg/m2) In Residential and Offices 0.3ton/m2 (300kg/m2) Super Imposed Dead Load : 0.35ton/m2 (350kg/m2) ƒ`c : B350 for slabs, beams and footings (ƒ`c = 280 kg/cm²) B400 for columns (ƒ`c = 300 kg/cm²) fy : 4200kg\ cm² Bearing Capacity (BC) : 35ton/m2

Center of Columns

Columns and Reinforcement Details ColbhAs G Ф 14 G Ф 14 G Ф 16 G Ф 14 G Ф 14 G640 8 Ф 16 G Ф 14 Steel bars for each group :

Slabs and Beams Basement Slab

Slabs and Beams Ground and First Floor Slab

Slabs and Beams Second Floor Slab

Slabs and Beams Third and Forth Floor Slab

Section Through Ribs

Slabs Reinforcement Details for Basement Slab

Slabs Reinforcement Details for Ground and First Floor Slab

Slabs Reinforcement Details for Second, Third and forth floor Slab

Beams Long Section in Beam 1 in Basement Slab BeamTop reinforcementBottom reinforcement b16Ø14 b26Ø14 b36Ø14 b46Ø14 b56Ø14 b66Ø14 b76Ø14 b86Ø14

Beams Cross Section 1 in Beam 1 Cross Section 2 in Beam 1

Footings and Tie Beams

Footings Single Footing Footinglength(m)width(m)height(m)As LAs W F Ф 167 Ф 16 F Ф 1610 Ф 16 F Ф 1810 Ф 18 F Ф 14 F Ф 1814 Ф 18

Footings Combined Footing

Stairs Reinforcement Details for Stairs

Joints Reinforcement Details

Seismic Design Seismic Separation

Seismic Design The Seismic Checks using Sap2000 : 1- Compatibility Check 2- Equilibrium Check 3- Check for Internal Forces

Mechanical Design The Mechanical Design Consists of four stages 1-Drainage 2-Water Supply 3-HVAC 4-Elevators

Drainage The Drainage system for third floor

Drainage Floors Number of Drainage Fixture units Ground floor 40 First floor 40 Second floor63 Third floor98 Fourth floor98

Water Supply 2'' for Water meter for each Apartment 2.5forMain Vertical Pipe 2'' for Horizontal Pipe 3/4'' for Horizontal(Branch) inside Pipe

HVAC System 1- Heating 2- Cooling

Heating Loss WE USE# COLUMS(3C) M' # radiators TOTAL LOSS ROOM Zone Zone Zone Zone Zone Zone 6

Heating System

Heating Gain Q total QLQs ROOM equipmentoccupantsventilationequipmentlightingoccupantsventilationQ WIN+ WALL MASTER BEDROOM BEDROOM A BEDROOM B KITCHIN GUEST RROM TOTAL

Cooling System

Elevator Design Average Population : 1300 person %HC : 14% (Center City type) After Calculations N = 5, 3500/lb 400fpm But because there's many stairs in the building and to satisfy symmetry to the building for seismic code requirements and for Architectural considerations, it was more practical to use 4 elevators.

Electrical Design Dialux Sample Sockets Calculations and samples Lighting Calculations Main Distribution Board “MDB” Branch Calculations

Dialux Surfa ce  [%] E avg [lx] E min [lx] E max [lx] u0 Work plane / Floor Ceilin g Walls (7) / Cafeteria Luminaire and Lighting Calculations using Dialux

Socket Calculations Total current total number of sockets number of socketsPlaceNo. of floor 500 Amp100(5A)100General(all shops)Ground Floor 240 Amp16(15A)16Special Loads 20 Amp4(5A)4WC’s 20 Amp4(5A)4Lobby 780 AmpTotal Current in Ground Floor 500 Amp100(5A)100General(all shops)First Floor 20 Amp4(5A)4WC’s 520 Amp Total Current in First Floor 65 Amp13(5A)13 Office 1 Second Floor 70 Amp14(5A)14Office 2 70 Amp14(5A)14Office 3 95 Amp19(5A)19Office Amp20(5A)20Office Amp21(5A)21Office 6 85 Amp17(5A)17Office 7 20 Amp4(5A)4Lobby 610 Amp Total Current in Second Floor 160 Amp32(5A)32 Apartment 1 -West Third Floor 160 Amp32(5A)32Apartment 2 -West 170 Amp34(5A)34Apartment 3 -East 165 Amp33(5A)33Apartment 4 -East 655 Amp Total Current in Third Floor 160 Amp32(5A)32 Apartment 1 -West Fourth Floor 160 Amp32(5A)32Apartment 2 -West 170 Amp34(5A)34Apartment 3 -East 165 Amp33(5A)33Apartment 4 –East 655 Amp Total Current in Fourth Floor 3220 Amp Total Current in the Building Sockets Calculations in the entire Commercial Center

Socket Calculations Socket Calculations Sample and Sockets Distribution for (Apartment 2 F3) Total curre nt total number of sockets number of sockets Place No. of floor 160 Amp 32(5A)32Apartment 2 -West Third Floor

Lighting Calculations Total wattNnWattType of lampplace FluorescentShop FluorescentSecurity FluorescentShop FluorescentShop PL FluorescentShop FluorescentShop FluorescentShop FluorescentShop PL FluorescentShop 9 A sample of the Ground Floor Calculations for Lighting WattTotal Watt in Ground Floor Watt Total Watt in the Building

Lighting Calculations FluorescentOffice PL BEGA T16 Lighting Calculations Sample and Distribution of Luminaires for Office 6

MDB(Main Distribution Board) MDB(Main Distribution Board) MDB Details

MDB(Main Distribution Board) MDB(Main Distribution Board)

Branch Circuit Calculations - Diversity Factor for lighting = Diversity Factor for sockets = Safety Factor =1.5 - Power Factor = Current for lighting = 10 Amp - Current for sockets = 16 Amp

Branch Circuit Calculations Circuit breaker sample for Apartment 2 F3 : Lighting load for Apartment 2 F3 = 930Watt Sockets load for Apartment 2 F3= 160 Amp N for lighting branches= 5 Circuit breaker for lighting N for sockets branches= 32/2 = 16 Circuit breaker for sockets.

Safety and Fire Design Fire System and Details Fire Exits

Fire System Details Fire System details in Offices (1)

Fire System Details Fire System details in Offices (2)

Fire Exits Fire Exits in the Ground and First Floor

Fire Exits Fire Exits in the Second Floor

Fire Exits Fire Exits in the Second Floor

Fire Exits The Western Fire Exit in the Eastern part of the Third and Forth Floor

Quantity Surveying & Specifications Volume of concreteCost Walls271.1 (m 3 )94885 NIS Floor and roof (m 3 ) NIS Columns (m 3 )50974 NIS Footing99.12 (m 3 )34692 NIS Total (m 3 ) NIS Total Concrete

Total Steel Volume of concreteCost Walls271.1 (m 3 )94885 NIS Floor and roof (m 3 ) NIS Columns (m 3 )50974 NIS Footing99.12 (m 3 )34692 NIS Total (m 3 ) NIS

Total Cost Earth work Concrete steel block Stone Labor Total NIS

Thank You For Listing Any Questions ?