Your Distribution System – Cradle to Grave Construction Inspection of Water Distribution Mains – Do it Right or be Sorry Ron Bard, P.E.

Slides:



Advertisements
Similar presentations
Leadership and Worker Involvement
Advertisements

Constructability Review
Roles & Responsibilities in Construction Management
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Template Visual Resume Template Marc Gold & Associates.
Managing and Negotiating Change Orders Presented by Daniel Williams, P.E. May 1, 2008.
1 Excavations Best Practice Excavations. 2 Agenda - Introduction Statistics Excavations - Best Practices Question Period.
1 PRESENTATION FLOWABLE FILL Presented By: Mac McArthur, P.E. Construction Engineering Services Bureau Mike Lynch Materials Bureau Highways and Engineering.
Excavation Safety for Workers Specifically for Type C Soils Submitted by Dr Les LaFountain with Project Navigator, Ltd., June 2008.
General Services Division / Project Administration FINAL INSPECTION AND ACCEPTANCE “It ain’t over till it’s over.” (Yogi Berra)
The Risks and Rewards of Contractor Bids and Proposals.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
ESTIMATING By Laith Jacob.
EM15 – Contractors COST MANAGEMENT
2013 Section Engineer’s Meeting.  Correct Type, Gauge, and Coating (Standard Drawings)  Based on Pipe Diameter, Fill Height & Soil pH  Obtain copy.
Contractor & Owner Roles in Health & Safety. Safety Topics Contractor Role in Health and Safety Owner Role in Health and Safety.
OH 5-1 Hiring and Orienting New Employees Human Resources Management and Supervision 5 OH 5-1.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
Engineers Without Borders H&S Presentation
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
 Journeyman  Management  Specialization  Teaching  Owning a business.
LINER AND COVER CONSTRUCTION BASICS Presented by: Curt Ahrendsen, Principal American Environmental Consulting AEC.
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Leveraging Web Based Collaborative Project Management Applications- the CM’s perspective Michael Warriner, P.E.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Specification & Quantities Estimating Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
Task Analysis Methods IST 331. March 16 th
Holland High School Construction Update June 8, 2011.
Agency Construction Management :CM NOT AT-RISK
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.
Responsibility & Authority Module #2 Prepared by Dr. Randy R. Rapp July 2005.
Training Module 10 Project Management Prepared by RCAP Solutions for the PA Department of Environmental Protection.
Construction Eng 221 Project Management and Administration.
An Inspector’s Primer Larry Johnson Harris County Larry Johnson Harris County.
TRENCHING & EXCAVATION
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.
Resident Engineer Panel Discussion Jack Stone, P.E. District 2 Engineer, Casper Chad Aagard, P.E. District 2 Engineer, Casper Pete Hallsten, P.E. District.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
 Section Where you go if you disagree on either three elements entitlement, impacts or costs  Begins with the contractors notice 5 working days.
Measurement and Payment
DISTRICT CONSTRUCTION ENGINEER PANEL DISCUSSION Contract Management: Claim Avoidance and Handling Keith Compton, P.E. District 5 Construction Engineer.
University of Calgary Continuing Education Construction Contract Law and Documents Week 12 Changes Delays Claims Contract Documentation.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Matthew Johnson Harris County Matthew Johnson Harris County.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
Presented by: Jane Bachynski March 1, 2016 Avoidance and Management of Construction Claims – Fact or Fiction?
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
CLAIMS AND DOCUMENTATION. WHAT IS A CLAIM? A demand or request for something considered one's due.
Template Visual Resume Template Marc Gold & Associates.
Excavation Hazards & Controls.
CONTRACT DOCUMENTS & CONSTRUCTION
Temporary Works Co-ordination
4th Annual Construction Law Summit
DTF implementation Roles and responsibilities
Value Engineering In Design
Construction Considerations
Eric M. Reimschiissel Contractors working with Agencies
Construction Management Services April 16, 2018
Presentation transcript:

Your Distribution System – Cradle to Grave Construction Inspection of Water Distribution Mains – Do it Right or be Sorry Ron Bard, P.E.

Agenda ▼ What to do During Design ▼ What to do Before Construction Starts ▼ The Facts of Life ▼ Starting Out on the Right Foot ▼ Documentation ▼ TESC, Excavation, Shoring, Dewatering, Backfill ▼ Items Easy to Overlook

Levels of CM ▼ Construction Monitoring ▼ Construction Inspection ▼ Construction Management ▼ Understand the Differences and Match Expectations Increasing level of detail and responsibility

During Design ▼ CM to Review Contract Documents ▼ Provide a Formal Constructability Review ▼ Conduct an Operations Review ▼ Do the Specs Reflect How the Job will be Administered? ▼ Consider Asset Management Issues ▼ Decide What the Contractor Does for: l Testing l As-builts l Schedules

Before Construction Starts ▼ Detailed Pre-con Meeting to Set Expectations ▼ Define Role of Engineer vs. CM ▼ Get a Detailed Schedule from Contractor ▼ Get a List of Contractor’s Manpower and Equipment ▼ Prepare a Submittal Log ▼ Discuss the Need to Schedule Submittals/Re-submittals ▼ Take pre-con Photos ▼ Define: l Early Action Submittals l Long Lead Time Materials

The Facts of Life ▼ Low Bidders Win the Work ▼ Some Contractors are Good, Some are Not ▼ Some Contractors will be Adversarial ▼ Contractors Need to Make Money ▼ But, Everyone Wants to Get the Job Done ▼ Contractors are Responsible for Means and Methods ▼ It is Very Hard to Require a Contractor to Stop Work ▼ The CM Can’t Lose Their Cool ▼ The Public is Always Nearby Communication is the Key to Success

Be Prepared and Flexible ▼ Major Differences Between Large and Small Jobs ▼ Major Differences Between Complex and Simple Jobs ▼ Bid Item Jobs versus Lump Sum Jobs ▼ Don’t be Like the Captain of the Titanic l Smooth Sailing Doesn’t Last ▼ Don’t Only Prepare for the Last Hurricane

Start Out on the Right Foot ▼ Strict Adherence to the Contract Docs l Can be More Creative Latter ▼ Ask Questions, Offer Suggestions, Do Not Direct ▼ Be Reasonable, but not a Push-Over ▼ Be On-site Every Day there is Activity ▼ Full-time Inspection of Critical/Underground Items ▼ Take Photos

Documentation ▼ Do the Daily Reports Daily l Assume they will be in Court l Quote the Contractor l Take Photos ▼ Document Everything, Write Serial Letters ▼ Always Adhere to Notification Provisions in the Specs ▼ Keep Track of Force-Account Hours and Equipment ▼ Handle Change Orders ASAP ▼ Ensure the Contractor Keeps Contemporaneous Cost Records for Change Orders and Claims

Safety ▼ Contractor is Responsible for Job Safety l Make Sure they Have a Plan and Follow It ▼ Keep Yourself Safe l Hold Inspector Safety Meetings (large projects) l Fall Protection l Confined Space Entry ▼ Attend the Contractors Tailgate Safety Meetings ▼ Document Actions, Take Photos ▼ Don’t Direct the Contractors Staff on Safety l Notify your Contractor of Concerns

TESC ▼ Can Get Lots of Scrutiny ▼ Walk the Site With Contractor ▼ Protect the Inlets ▼ Sweep the Streets ▼ Inspect the Facilities ▼ Pre-position Materials ▼ Prepare for Storms ▼ Check up On the Weekends if Needed If You Make it Important, They Will

Excavation ▼ Always Saw-Cut ▼ Don’t Over-widen Trenches ▼ Hot-Topics l Shoring l Dewatering l Foundation Material l Check Your Submittals

Shoring ▼ Worker Protection l Needed for > 4-foot Depths l Supervision by a Competent Person l Understand WAC ▼ Trench Boxes l Will Allow Sloughing l Can Impact Utilities

Dewatering ▼ Trench Must be Dry ▼ Dewatering Wells Need Time to Work ▼ Dewatering Wells are Needed 24/7 l Is Noise an Issue? ▼ Anticipate the Need for Baker Tanks

Foundations ▼ Probe the Sub-grade ▼ Get the Engineer on-site if Needed ▼ Use a Geotextile Fabric if Needed ▼ If in Doubt, Over-Ex and Add Foundation Materials

Backfill and Bedding ▼ Native Soil l Sensitive to Moisture Content l Watch for Large Diameter Rocks l Watch for Excessive Organics ▼ Compaction l Verify Density l Right Size/Type Compactor ▼ Avoid End-dumping

PVC Pipe ▼ Brittle in Cold Weather ▼ Bedding l Must Be Mechanically Compacted l Pipe Strength Comes from Bedding Haunches l Bring Up Evenly on Each Side ▼ Testing By Mandrel Is Important ▼ C900/905 is Strong, but Still Need to Be Careful

Easy to Overlook ▼ Dissimilar Materials Need Dielectric Couplings ▼ Notify Public of Service Interruptions ▼ Check out Contractor’s Pressure Testing Equipment ▼ Where to Get Testing Water ▼ Where to Dispose of Testing Water and Declorinate ▼ Thrust Block Must Bear on Undisturbed Soil ▼ Coordinate What Contractor Does and Utility Does

Easy to Overlook ▼ Meters/Boxes on Hand if Utility Provided ▼ Compare Materials Delivered to Shop Drawings ▼ Get O&M Materials ▼ Closure Pieces and Couplings, Especially RJ

Claims Avoidance ▼ Have Good Records ▼ Settle Up as You Go ▼ Issue Unilateral Change Orders if Needed (But be Fair) ▼ Pay for Acceleration if Needed l Do What it Takes to Avoid Extended Overhead ▼ Be Responsive if There is a DSC ▼ Don’t Delay the Contractor, Be Timely and Responsive ▼ Stick to the Contract l Avoids a claim that you “Abandoned the Contract” Oh, and Take Photos

Questions?