Development Alternatives 1 CDM PROJECT ON ENERGY EFFICIENCY INITIATIVES AT LOTUS SUITES AND THE ORCHID HOTEL, MUMBAI BY MALLIKA ROY DEVELOPMENT ALTERNATIVES.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Technology Transfer in the CDM DUAN Maosheng Tsinghua University Linking Climate Mitigation Policy and Modeling in China Workshop February 18, 2006 Beijing.
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Delivering a real CDM Project The BP PRODEEM Rural Solar Project.
Energy Saving in Hospitals: Hong Kong Initiatives
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Can ICT Beat CO 2 ? Daniel Gagné ITU – Symposium on ICTs, the Environment and Climate Change May 29th 2012.
Structure of DNA and Proposed Sustainable Development Criteria for CDM Projects In Bangladesh CDM Designated National Authority (DNA) Durbar Conference.
Methodological Approaches and Tools to Assess the Sustainability of CDM Projects Christoph Sutter, Indian cell:
Prior activities of FEWE Under the bilateral and multilateral co-operation, several projects to support the rational energy use in different sectors.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
Development Alternatives CDM Opportunities, New Delhi Vertical Shaft Brick Kiln Project: A Case Study Workshop on CDM: Opportunities in Rajasthan Jaipur.
UNFCCC Secretariat SDM programme CDM‘s contribution to global climate action; its sucesses and further contribution Fatima-Zahra Taibi, UNFCCC secretariat.
Environmental Sustainability in the Extractive Industry: The Case for Climate Change Mitigation Dr Uwem E. Ite.
UAE Energy and Water Efficiency and Labeling Programs
ASIA CLEAN ENERGY FORUM “Energy Management Initiatives in Production Facility ” C. M. S. M. Fazvi Certified Energy Manager (Sri Lanka Sustainable.
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
© Clean Energy Finance Corporation Ridley Aqua Feed Australian Prawn and Barramundi Farmers Symposium 2015 Lezel Fouché, Manager – Portfolio Management,
Solar Geysers – a CDM perspective TATA BP Solar case study.
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
Beyond offsetting: Ambitious SBL as a national contribution to combat climate change Malin Ahlberg „Designated Focal Point/Designated National Authority“
Green Building Demonstration Project Adam Saling City of San Diego.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
Sustainability is Good for Business OFFICE STAFF.
CDM implementation in Korea Gyungae Ha Center for Climate Change Mitigation Projects Korea Energy Management Corporation October , AIT, Thailand.
Financing climate-friendly projects in the Balkan region DAC PROJECT CAPACITY BUILDING IN BALKAN COUNTRIES IN ORDER TO DEAL WITH CLIMATE CHANGE Prepared.
GREEN GOWN AWARD 2008 DALHOUSIE BUILDING DEREK MITCHELL ENERGY MANAGER JUNE 2009.
Welcome. The legal framework of CDM - UNFCCC, at Rio de Janeiro Earth Summit, Kyoto protocol, CDM, Parties and Benefits Basic requirements.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Development Alternatives Baselines, Additionality & Monitoring Methodologies For Orientation Workshop on March 25-26, 2004 Udit Mathur Climate Change Centre.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Sustainable Development Impact Evaluation Miriam Hinostroza.
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Pakistan National Operational Strategy for Clean Development Mechanism.
Energy Efficiency in Sustainable Habitats: Roshni & Beyond Seminar on Universalisation of Roshni – A Green Innovation for Sustainable Habitats Rashtrapati.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
Structure of the presentation The origins of CDM What is the CDM? Players of CDM.
Opportunities for Competitive Energy Services IEA DSM Task XVI Experts Meeting, Deventer, Netherland, 8-9 October, 2007 Abhishek Nath Bureau of Energy.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
New Government Policy on Energy Efficiency By Subodh Kumar Scientist Central Road Research Institute New Delhi ,
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
BACKGROUND TO THE CDM By Philip M. Gwage. Structure of Presentation Background  Climate Change Convention  Kyoto Protocol The Clean Development Mechanism.
Clean Energy Project Analysis Course Clean Energy Project Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – 2004.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Environmental Performance Prepared for CFOA, London, 28th January 2010 By Matt Farnsworth: Environment & Sustainability Manager, Nottinghamshire.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Feasibility Study Phase1 Tianjin YUJIAPU Low-Carbon CBD
Energy Saving Guide How much in Energy Savings are you missing out on?
Development of a Solar Water Heater NAMA Concept Belize
Energy Saving Guide How much in Energy Savings are you missing out on?
CDM Activity Cycle under the Marrakech Accords
Presentation transcript:

Development Alternatives 1 CDM PROJECT ON ENERGY EFFICIENCY INITIATIVES AT LOTUS SUITES AND THE ORCHID HOTEL, MUMBAI BY MALLIKA ROY DEVELOPMENT ALTERNATIVES

Development Alternatives 2 Features of a CDM Project A project activity to reduce the GHG emission, additional to any that would occur in the absence of the project, compared to the business as usual scenario (BAU) is called a Clean Development Mechanism (CDM) Project. In such a project, the following are the main criteria that should be taken care of :  Additionality Criteria  Sustainable Development  Baseline Calculation

Development Alternatives 3 Validation Monitoring Design, structure, finance Verification & certification Executive Board National approval National Authority CDM Project Cycle Operational entities Registration Issue CERs Project participants

Development Alternatives 4 Foundation: Mr. V.K. Kamat started the group in 1972, which now runs almost 50 hotels and restaurants around the world. Hotels in the Project The Orchid, Mumbai  Asia’s first 5 star certified as an Ecotel Hotel  Awarded the Green Globe Award by World Travel Mart, London  Was honoured with “Green Hotelier & Restaurateur Award” by IH&RA Kamat Hotels India Ltd. The Lotus Suites, Mumbai  Is a 196 room 4 star hotel designed as an Environmentally Sensitive Hotel  Will be fully operational from the year

Development Alternatives 5  Replacement of Condenser, STL Pumps and Production Pumps by low consumption and high efficiency pumps Energy Saving:4,22,039 KWh/year (27%)  Replacement of incandescent lamps by PL & CFLs Energy Saving: 33,73,016 KWh/year (64%)  Replacement of feet electronic chokes by electronic chokes Energy Saving: 46,814 KWh/year (26%)  Variable Frequency Drive Energy Saving: KWh/year (24%) Technologies Installed

Development Alternatives 6  Installation of Auto Power Factor Control Panel Energy Saving: 2,10,240 KWh/year (8%)  Ozonized Fresh Air: Maintains air quality, thus reducing the fresh air requirement and hence the A/C load Energy Saving: 55,582 KWh/year (11%) Technologies Installed

Development Alternatives 7 Eco Button : Reduces load on A/C plant by automatically increasing temperature by 2OC for each room where the eco-button is switched on. Energy Saving: 3,11,856 KWh/year (1%) Desuperheater: Heat generated during condensation on chiller plant is recovered to preheat the water flowing through Hot Water Generator Energy Saving: KWh/year Total Energy Saving: KWh/Year Technologies Installed

Development Alternatives 8 Savings in both the hotel Orchid & Lotus suites Equipments Installed Savings (kWh/year) Savings (in Rs.) Rs / unit Low consumption & high efficiency pumps 2,89,08012,28,590 Electronic chokes1,06,7924,53,866 Installation of CFL16,22,95768,97,567 Eco-Button3,11,85613,25,388 De-super heater15,23,08764,73,119 APFC Panel2,10,2408,93,520 Ozonised fresh air55,5822,36,223 Installation of VFDs1,25,7065,34,250

Development Alternatives 9

10 Baselines Any project proposal must clearly & transparently describe methodology of determination of baseline. Emission baseline is the agreed methodology to quantify “what would have happened ” in the absence of the project. It is established by using data, simulations & assumptions specific to a particular project.

Development Alternatives 11 Baseline   Emissions before CDM activity Emissions from energy use = Energy Use before equipments installed * Emission Coefficient for the Western Grid = kWh/yr * kg CO2/kWh = kg CO2/ yr Emissions from boiler use = kg CO 2 / yr Total emissions before CDM project activity = = kg CO 2 / yr

Development Alternatives 12   Emissions After CDM project activity Emissions from energy use =Energy use after equipments installed * Emission Coefficient for the Western Grid = kWh/yr * kg CO 2 /kWh = kg CO 2 / yr Emission Reduction = 3959 tonnes CO 2 /yr Baseline

Development Alternatives 13 Additionality Criteria Additionality under the CDM refers to the goal of only awarding CERS for reductions that are beyond what would happen under a BAU scenario. Emission/Environmental Additionality: It has been coined to refer to the requirement that a CDM project must generate emission reductions additional to any BAU scenario. Financial Additionality: The funding for CDM project activity should not lead to diversion of overseas development assistance. The project participants may demonstrate how this is being achieved. Technological Additionality: The CDM project activities should lead to transfer of environmentally safe and sound technologies and know how.

Development Alternatives 14 Project participants shall provide an explanation to show that the project activity would not have occurred anyway due to at least one of the following barriers: Investment barrier: A financially more viable alternative to the project activity would have led to higher emissions; Technological barrier: A less technologically advanced alternative to the project activity involves lower risks and so would have led to higher emissions; Barrier due to prevailing practice: Prevailing practice or existing regulatory or policy requirements would have led to implementation of a technology with higher emissions; Other barriers:  Institutional barriers  Limited information  Competition for capital etc. Additionality Criteria

Development Alternatives 15 Additionality in the Project   Environmental Additionality  Emission Reduction = 3959 tonnes CO2eq/yr   Barriers Overcome  Institutional Barriers   Lack of experience with energy efficiency investments   Low priority towards data collection   Uncertain energy savings  Financial Barriers   Cash constraints   Competition for capital

Development Alternatives 16 Additionality Proposed Activity, Technology or Equipment HotelBusiness as Usual scenario in India Barriers Present Air-conditioning plant with de–super heater The Orchid and Lotus Suites Existing old and inefficient AC Plants are in operation; most new hotels do not install de- super heater Investment Barrier Institutional Barrier Injection of ozone (O3) to space air circulation Lotus Suites Not presentTechnological Barrier Provision of ozone treatment to condenser water Lotus Suites Not presentTechnological Barrier Heat Recovery WheelLotus Suites Prevalent in a few metro 5-star category hotels Institutional Barrier Investment Barrier Variable Frequency Drives Lotus Suites Present in very few hotels. Price Barrier

Development Alternatives 17 Additionality Additionality (Contd….) Proposed Activity, Technology or Equipment HotelPresent state-of-the- art in India Barriers Present Solar PV LightingLotus SuitesSolar PV lighting is present in a few top- range metro hotels; Price Barrier APFC PanelLotus SuitesNot presentTechnology Barrier Price Barrier Replacement of lights by CFLs Lotus SuitesPresent in most hotelsPrice Barrier Double Speed MotorsOrchid HotelNot very common in Indian hotels Price barrier Condenser, STL and Production pumps (with higher efficiency) Orchid Hotel and Lotus Suites Hotels in India do not replace their existing pumps with these Price Barrier Eco-button Orchid Hotel and Lotus Suites Totally new concept. Not present in any other hotels in India Technological Barrier Barrier due to prevailing practice Limited information barrier

Development Alternatives 18 Sustainable Development It is the prerogative of the host Party to confirm whether a clean development mechanism project activity assists it in achieving sustainable development. The CDM should also be oriented towards improving the quality of life of the very poor from the environmental standpoint. Following aspects should be considered while designing CDM project Activity:   Social well being   Economic well being   Environmental well being   Technological well being

Development Alternatives 19 Sustainable Development S.D. FactorsIndicatorsImpacts/Results Economic Well-BeingEmployment Generation30 more jobs created Environmental Soundness CO 2 reduction3959 tonnes per year SO 2 reduction380 tonnes per year NO X reduction11 tonnes per year Ash reduction5.06 tonnes per year SPM reduction111µg/nm 3 RPM reduction86µg/nm 3 Water Management70,000 litres of water recycled everyday. Social wellbeingCommunity Development Contribution to children’s welfare organisation Technological Adaptation ReplicationReplicated in 2 more hotels

Development Alternatives 20