Portfolio selection for energy projects under the Clean Development Mechanism (CDM) Olena Pechak, PhD candidate George Mavrotas, Asst. Professor School.

Slides:



Advertisements
Similar presentations
Latin American Carbon Forum 2011 C ARBON TRADING BEYOND 2012: NEW APPROACHES AND EMERGING MARKET INSTRUMENTS Latin America Carbon Forum San José, Costa.
Advertisements

The GKI Telephone: /2 Website: What is Carbon Finance?
The CDM: a review of its development and status of the carbon markets Dr. Oscar Coto II National CDM Workshop Belize August 2011.
Click to edit Master title style Climate Change and the Carbon Market October 2010 Ciska Terblanche TAPPSA 2010 Conference Durban, South Africa TAPPSA.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
Asset Optimization & Decision Support Services. 1 Overview of Service Program Proprietary service platform that marries 30+ years of Engineering & Subject.
Reflections on Key Messages in Recent Reports
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
UNFCCC Secretariat SDM programme CDM‘s contribution to global climate action; its sucesses and further contribution Fatima-Zahra Taibi, UNFCCC secretariat.
The Politics of Global Climate Change Urs Luterbacher Graduate Institute of International Studies.
SGM P.R. Shukla. Second Generation Model Top-Down Economic Models  Project baseline carbon emissions over time for a country or group of countries 
Discussion (1) Economic forces driving industrial development and environmental degradation (2) Scientific recognition and measurement of pollution (Who.
© 2005 Prentice Hall, Decision Support Systems and Intelligent Systems, 7th Edition, Turban, Aronson, and Liang 4-1 Chapter 4 Modeling and Analysis Turban,
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
UNDP, Bangkok, 1 April 2008 AWG on Further Commitments In-session workshop on means to reach emission reduction targets CDM Experiences and Lessons.
International cooperation Part IV. The UNFCCC and the Kyoto Protocol Session 7.
International cooperation Part IV. The UNFCCC and the Kyoto Protocol Session 7.
Introduction to ModelingMonte Carlo Simulation Expensive Not always practical Time consuming Impossible for all situations Can be complex Cons Pros Experience.
IISD Second Annual Forum of Developing Country Investment Negotiators: 2-4 Nov 2008 Climate Change and International Investment Agreements Riekie Wandrag.
Optimising the Layout of 1000 Turbines Markus Wagner Optimisation and Logistics.
EMPIRE- modelling the future European power system under different climate policies Asgeir Tomasgard, Christian Skar, Gerard Doorman, Bjørn H. Bakken,
1 LEPII-EPE IDDRI – Emissions trading for GHG mitigation 20/01/04 Trade through the Kyoto Protocol flexibility mechanisms : the impact of qualifying participants.
Introduction of technical paper Funding adaptation in developing countries: extending the share of proceeds used to assist in meeting the costs of adaptation;
1V Int. Scientific and Practical Workshop "Ashes from TPPS", April 24/25, 2014, Moscow, Russia Forecast in Power Production and Impact on CCPs in Europe.
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Reducing poverty through sustainable industrial growth Power-Gen PAK rd International Conference.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Advanced Energy Management in Cloud Computing multi data center environments Giuliana Carello, DEI, Politecnico di Milano Danilo.
| Regional Workshop on CDM and NAMAs for Latin America and the Caribbean Roles and Structure of Designated National Authorities (DNAs) Bogota, Colombia.
Page 1 AEM Board Meeting August 2007 Climate Change Calculations And Implications John T. Disharoon Sustainable Development Manager Caterpillar Inc.
Brief Overview of Legal Framework: UNFCCC and Kyoto Protocol M.J.Mace Climate Change and Energy Programme, FIELD LDC Workshop Nairobi, Kenya 2-3 November.
1 DEDICATED TO MAKING A DIFFERENCE Vincent Mages Climate Change Initiatives VP Lafarge Greenhouse gas mitigation in the cement.
Overview of Carbon Markets Voluntary & Compliance Markets: Existing Carbon Reduction Units Vladimir Litvak RBEC Energy and Environment Practice Leader.
Pilot Project on the Use of Flexible Instruments for Climate Policy in Baden-Wuerttemberg: A Manual to Facilitate Companies Participation Fraunhofer Institute.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. State and Trends of the.
GEF and CDM/JI: similarities, differences, linkages, synergies GEF Training Workshop, Almaty, October 6-9, 2004.
International Framework and Kyoto Protocol. UNFCCC Conference of the parties (annual meeting) –Review implementation –Consider new needs –Subgroups Creates.
Regulation Against Global Warming in an Unequal World Sylvestre Gaudin Hultberg.
EU ETS & European Energy Market Dr Bill Kyte OBE Advisor, Sustainable Development, E.ON AG Chairman, UK Emissions Trading Group Ltd Chairman, Eurelectric.
EU Climate Action EU – Central Asia Working Group on
Technology Transfer and Investment Risk in International Emissions Trading (TETRIS) Work Package 3: Permit Supply from the CDM (TETRIS Meeting, Amsterdam,
Associates Fernanda Prazeres : Shared Vision Oscar Barbosa : Mitigation Provi Caraballo : Adaptation Julianne Prokopich : Transfer & Finance.
European Wind Energy Conference February - 2 March 2006, Athens, Greece PROMOTING WIND ENERGY THROUGH THE FLEXIBLE MECHANISMS OF THE KYOTO PROTOCOL.
ENABLING ACTIVITIES FOR THE PREPARATION OF THE KINGDOM OF CAMBODIA’S SECOND NATIONAL COMMUNCIATION TO THE UNFCCC (SNC Project) Presented by Long Rithirak.
ECOPLAN 1 Climate-Policy Induced Technology Exports – Potential and Risk Technology Transfer and Investment Risk in International Emissions Trading Summary.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
Artificial intelligence methods in the CO 2 permission market simulation Jarosław Stańczak *, Piotr Pałka **, Zbigniew Nahorski * * Systems Research Institute,
+ The Clean Development Mechanism in China Jiang Li, Senmiao Sun, Anda Xiong Beijing No.4 High School SPCC 07/07/12.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
EGTEI – Expert Group on Techno-economic Issues Methodology for data collection Presented by Nadine Allemand EGTEI secretariat Workshop to promote ratification.
Newton Paciornik BRAZIL Policy Goals and Common Metrics Implications Bonn, 04 April 2012 Workshop on common metrics to calculate the CO 2 equivalence of.
Markets & Mechanisms Developments inside and outside the UNFCCC negotiations. Building and Urban Methodologies Workshop UNFCCC, Bonn, March 2014.
Final Project By Paul Bouyounes. Clean Development Mechanism O In 1997, under the United Nations Framework Convention on Climate Change (UNFCCC), the.
Clean Development Mechanisms and New Market Developments Presentation at the Regional Conference on Gas Flare Reductions Tashkent, 15 th June 2012.
Environmental Industries Sector Unit CDM Opportunities in South Korea Greg Dunne, Director, ICECAP Ltd. Seoul, 25 th September 2006 EISU Seminar Mission.
Sustainable Development: Cooperation in FEALAC Sustainable Development: Cooperation in FEALAC October ,200 7 Economy and Society WG Delegation of Japan.
Dr. F. Horacio Payá Climate Law in Developing Countries post-2012: North and South Prespectives September 26 – 28, 2008 IUCN Academy of Environmental Law.
Brief Overview of Legal Framework: UNFCCC and Kyoto Protocol M.J.Mace Climate Change and Energy Programme, FIELD LDC Workshop Montreal Canada November.
Climate Change and Forestry —Possible Legal and Policy Instruments to Address Potential Effects of Forest Carbon Offsets Ding Zhi (Department of Law of.
UNFCCC JI workshop 14th February 2007 ENDESA´s Strategy regarding Joint Implementation David Corregidor Sanz Deputy Director of the Environment and Climate.
New Task on DSM and Climate Change Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee Meeting Brugge, Belgium.
ENERGY AND ENVIRONMENTAL POLICY SUSTAINABLE DEVELOPMENT
Cost Efficient Emissions Reduction
Analysis of climate change mitigation tools in Ukraine
KYOTO PROTOCOL.
The Kyoto Protocol Mechanisms
Q&A sessions at UNFCCC SB26
Kyoto Protocol.
WaterWare description
EU plan: Supporting directives • The EU Renewable Energy Directive was adopted at the end of 2008 • EU Renewable Energy Directive.
Presentation transcript:

Portfolio selection for energy projects under the Clean Development Mechanism (CDM) Olena Pechak, PhD candidate George Mavrotas, Asst. Professor School of Chemical Engineering National Technical University of Athens, Greece 1ο ΠΑΝΕΛΛΗΝΙΟ ΦΟΙΤΗΤΙΚΟ ΣΥΝΕΔΡΙΟ ΕΛΛΗΝΙΚΗΣ ΕΤΑΙΡΕΙΑΣ ΕΠΙΧΕΙΡΗΣΙΑΚΩΝ ΕΡΕΥΝΩΝ (Ε.Ε.Ε.Ε.)

E.E.E.E., 25 – 27 Νοεμβρίου Structure of the presentation  Introduction  CDM projects  Project selection problem  Description of the method Two step method  Incorporate uncertainty Monte Carlo simulation in GAMS  Results and conclusions

E.E.E.E., 25 – 27 Νοεμβρίου Introduction Climate change is a complicated problem created by humanity. In order to face it, UNFCCC was adopted. It coordinates activities for mitigation and adaptation to climate change. Kyoto Protocol to the UNFCCC provides three types of flexible mechanisms to reduce GHG emissions:  joint implementation (JI),  clean development mechanism (CDM) and  international emission trading (IET). RES activities within CDM:  65% of all projects in CDM pipeline  46% of emission cuts 858 wind energy projects (17.4% of total in Jan. 2010)  284 of which (with installed capacity GW) are already registered.

E.E.E.E., 25 – 27 Νοεμβρίου Introduction: Main features of CDM  Cooperation between developing and developed countries  The projects activity provides GHG emission reductions compared with BAU scenario,  During the operation of the project achieved reductions are translated into Certified Emission Reductions (CERs), backed by the 1 t CO 2 -eq  CERs may be sold in carbon market. The price for them is variable  Project duration is variable and is chosen before the registration of the project

E.E.E.E., 25 – 27 Νοεμβρίου Introduction: Wind energy Influencing factors on popularity of wind energy:  growing energy demand,  increased concerns for environmental and climate issues,  improvements of technology itself. 3 key regions: Europe, North America, and Asia (with China and India as main players)

E.E.E.E., 25 – 27 Νοεμβρίου Project selection problem Selection of project portfolio with constraints like:  Policy  Budget  Geographical distribution  Technical constraints and MW of installed capacity  Logical constraints In addition we have:  Set of hypothetic projects  Variable CER prices Solving software: GAMS CPLEX 12.2

E.E.E.E., 25 – 27 Νοεμβρίου Project selection problem Input  100 CDM projects across 4 regions (China 50, India 30, Latin America 10, Mediterranean 10)  Budget constraint is 2.8 billion $, the sum of candidates billion $  regional constraints (at least 3 projects from Latin America and Mediterranean, India must have no less than half of China)  MW constraints - not more than 75% of MW in China  logical constraints (mutually exclusive projects)  technology constraints (sum of off shore MW across all countries less than 2 GW)

E.E.E.E., 25 – 27 Νοεμβρίου Project selection problem In calculations we:  maximize total NPV (with discount rate =8%)  consider only the CER price as uncertainty factor  perform Monte Carlo simulation and optimization for normal distribution around 20$ (μ=20, σ=3.3) for uniform distribution in [10, 30] The process of solving the problem is divided into 2 big steps.

E.E.E.E., 25 – 27 Νοεμβρίου Description of the method Step I  An Integer Programming (IP) model is developed with binary decision variables that express the existence of each project in the selected portfolio. objective function - cumulative NPV  constraints: policy, logical and budget  Due to the uncertainty related to the future price of Certified Emission Reductions (CERs) a Monte Carlo simulation-optimization process is designed. Projects from resulting portfolios form subsets: Green set – projects are present in all portfolios Red set – none of projects is selected in any portfolio Grey set – projects, present in some portfolios

E.E.E.E., 25 – 27 Νοεμβρίου Description of the method Step II  Only projects from “grey” set are under consideration  A new IP is formulated only with the “grey” projects and uses the frequency obtained from the Monte Carlo simulation as their objective function coefficients.  The constraints are the same as before appropriately modified to take into account the sure adaptation of the “green” projects. The final output is the set of projects (portfolio) with the best performance under the given uncertainty conditions.

Graphical representation of Monte Carlo simulation and optimization μ CER price(i) Solution of IP i =1…1000 Obj function (z) uniform normal E.E.E.E., 25 – 27 Νοεμβρίου 2010

12 Results The normal and uniform distributions of projects’ NPV during the Step I

E.E.E.E., 25 – 27 Νοεμβρίου Results Results of the Step I in both cases are similar. The differences are observed only in frequencies of the projects from the “Grey” set. Totals:  Green set – 58  Red set – 23  Grey set – 19 GREEN set 1,3,4,6,8,9,10,11,13,14,15,16,17,18,21,23,24,25,26,2 8,30,37,40,42,44,46,47,49,50,52,53,55,56,57,58,61,6 3,65,66,71,72,74,75,77,78,79,81,82,83,86,87,88,90,9 1,92,93,94,97 RED set 2,5,12,19,20,22,27,31,33,35,36,41,45,48,54,59,68,73, 89,95,96,99,100 GREY set 7,29,32,34,38,39,43,51,60,62,64,67,69,70,76,80,84, 85,98

E.E.E.E., 25 – 27 Νοεμβρίου Results Let’ s see the Grey sets more carefully. # Normal Uniform # N U

E.E.E.E., 25 – 27 Νοεμβρίου Results: final selection Results of the Step II. Case of Normal distribution of CER prices: Case of Uniform distribution of CER prices: ProjectsTotalMWBudget 1,3,4,6,8,9,10,11,13,14,15,16,17,18,21,23, 24,25,26,28,29,30,32,34,37,39,40,42,44, 46, 47,49,50,51,52,53,55,56,57,58,60,61,63,64, 65,66,67,69,70,71,72,74,75,76,77,78,79,80, 81,82,83,84,85,86,87,88,90,91,92,93,94,97, Billion $ ProjectsTotalMWBudget 1,3,4,6,8,9,10,11,13,14,15,16,17,18,21,23, 24,25,26,28,29,30,32,34,37,40,42,43,44, 46, 47,49,50,51,52,53,55,56,57,58,60,61,63,64, 65,66,67,69,70,71,72,74,75,76,77,78,79,80, 81,82,83,84,85,86,87,88,90,91,92,93,94,97, Billion $

E.E.E.E., 25 – 27 Νοεμβρίου Conclusions about the method  Integer Programming can be effectively used for a portfolio selection problem  The objective function can be selected in order to reflect the decision making preferences  The combination of Monte Carlo and optimization is used successfully for dealing with uncertainty  The two step approach is a useful decision aid tool that (a) classifies the projects and (b) uses the information from the first step to drive the second optimization and result in the final choice

E.E.E.E., 25 – 27 Νοεμβρίου Conclusions about the problem  The resulting sets of projects from the Monte Carlo simulation are the same for normal and uniform distribution. The difference between uniform and normal distribution is observed in frequencies of “grey” projects. It also influences the ranking of the grey projects between each other.  19 ambiguous projects (grey set) from all kinds  Normal and uniform distribution give almost the same final choice  In final selection there are: China – 33 projects (#39 and #43 are very similar), Latin America – 8 projects, Mediterranean – 8 projects, India – 24 projects.

E.E.E.E., 25 – 27 Νοεμβρίου Future research  Incorporate multiple criteria MCDA and then IP Multiobjective IP  Group decision making IP for optimization Multiple portfolios, one for each DM Same approach (green, red, grey set)  Step1: Green set  the principle of unanimity  Step2: Grey set  the principle of majority

E.E.E.E., 25 – 27 Νοεμβρίου Thank you!