CEOS Disaster Risk Management Implementation Phase Status Ivan Petiteville (ESA) on behalf of CEOS DRM Team CEOS SIT-28 Meeting Hampton, Virginia, USA.

Slides:



Advertisements
Similar presentations
Chapter 8: Capacity Building Presented by Co Chair Mr. John Briceño CCAD Central American Countries 11/29/2003.
Advertisements

1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
DS-01 Disaster Risk Reduction and Early Warning Definition
Slide: 1 Guy Seguin (CSA) CEOS Disaster SBA Team Coordinator Priority Actions GEO Disaster WP
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
LAO PDR Summary Findings from NOSPA Mission and Possible Next Steps.
FP7 Preparations ISTC meeting 31 March Content FP7 preparation approach and timetable Context for FP7 and for ICT in FP7 Research in New Financial.
Agencies’ response to DRM pilot EO data requirements Ivan Petiteville (ESA, Chair WGDisasters) Stéphane Chalifoux (CSA, Vice-Chair WGDisasters) Andrew.
GEO SB-01 Oceans and Society: Blue Planet An Integrating Oceans Task of GEO GEO-IX Plenary November 2012 Foz do Iguaçu, Brazil on behalf of the Blue.
Summary of Supersites discussion at FRINGE 2011 meeting Frascati 21 Sept splinter meeting Chair: Falk Amelung (GEO task leader) Craig Dobson, represented.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 Report on Report on CEOS Plenary (Nov. 2005) Ivan PETITEVILLE.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
CEOS Contribution to Disaster Risk Management Ivan Petiteville, ESA on behalf of the Ad Hoc CEOS DRM Team 26th CEOS Plenary – Bengaluru, India
Stefano Salvi Chair of the Supersites Advisory Committee Third UN World Conference on Disaster Risk Reduction, Sendai, March 2015.
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
CEOS Response to the GEO Disasters Task Guy Seguin CSA CEOS SIT-28 Meeting Hampton, Virginia, USA Date.
CEOS SIT-28 Introduction of the Agenda, Overall Objectives, and Essential Business Topics Hampton, Virginia, USA March 12-14, 2013.
Space Technology for Emergency Response and Risk Reduction European Conference - GEO Welcomes FP7 Constanta, Romania 15 September 2006 United Nations platform.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
GEO-DARMA. 2 Sendai demonstrated a growing awareness of decision makers and key stakeholders on the need to use all data sources (e.g. in-situ, space,
CEOS EO Handbook & MIM Database Pascal Lecomte, ESA SIT Workshop Agenda Item #18 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th – 18 th.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 WGISS Contribution to GEO WGISS Contribution to GEO Ivan Petiteville.
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
Capacity Building Committee Architecture and Data Committee Meeting Seattle – July 2006.
Overview of CEOS Actions in Support of GEO Work Plan Ivan Petiteville CEO ESA 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November2009.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
Process and mechanics of HFA progress monitoring and Review Sujit Mohanty, UNISDR Meeting of the ISDR Asia Partnership 24 – 26 March 2010 Bangkok.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
Committee on Earth Observation Satellites Ivan Petiteville, ESA Plenary Agenda Item #29 29 th CEOS Plenary Kyoto International Conference Center Kyoto,
Committee on Earth Observation Satellites Ivan Petiteville, ESA Plenary Agenda Item # th CEOS Plenary Kyoto International Conference Center Kyoto,
HYOGO FRAMEWORK FOR ACTION A plan to make the world safer from hazards Endorsed by the UN General Assembly in 2005 during the World Disaster Reduction.
Committee on Earth Observation Satellites CEO Team Plenary Agenda Item #14b 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6.
Task XX-0X Task ID-01 GEO Work Plan Symposium April 2014 Task ID-01 “ Advancing GEOSS Data Sharing Principles” Experiences related to data sharing.
Page 1 WGISS Response to GEO/CEOS-SIT WGISS-22 Updates Ken McDonald WGISS/Vice-Chair.
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
Land Surface Imaging VC: Terms of Reference Julio Dalge, P.G. Diwakar, John Faundeen INPE ISRO USGS CEOS SIT-28 Meeting Hampton, Virginia, USA March 12,
WGCapD, CEOS and the UN Sustainable Development Goals (SDGs) Committee on Earth Observation Satellites Deputy CEOS Executive Officer / CSA Marie-Josée.
GEO Disaster Resilience Breakout Group Summary GEO Work Programme Symposium 2016 Kerry Ann Sawyer CEOS/NOAA 4 May 2016 Geneva, Switzerland.
Breakout session 11.7 Sustainable Urban Development Outputs Wenbo Chu GEO Secretariat.
UN WCDRR Disaster Risk Reduction Organization ESA SIT-31 Agenda Item # 7 CEOS Strategic Implementation Team ESA/ESRIN, Frascati, Italy 19 th -20 th April.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Assessments ASSESSMENTS. Assessments The Rationale and Purpose for Assessments.
Incoming Themes for 2017 Frank Kelly, USGS
CEOS Response to the Sendai Framework
Committee on Earth Observation Satellites
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
RA-II/Doc Implementation of the WMO DRR Roadmap in RA II including major activities on DRR Services Alasdair Hainsworth, Chief Disaster Risk Reduction.
GFOI Status & Issues CEOS Lead & SDCG EXEC SIT-31 Agenda Item 5
Title Goes Here Name (s), Organization, CEOS Affiliation CEOS SIT-33
Committee on Earth Observation Satellites
CEOS Missions, Instruments and Measurements Database
Oceans and Society: Blue Planet
Title Goes Here Name (s), Organization, CEOS Affiliation CEOS SIT-33
CEOS Contribution to Disaster Risk Management Way Forward
Thomas Cecere & Jonathon Ross USGS and Geoscience Australia
Review of Chair Priorities
SESSION 2: GLOBAL DATA FLOWS STUDY
WGCapD Perspectives of Work Plan –
LSI-VC User Requirements
WG Capacity Building & Data Democracy (WGCapD)
WGCapD: Working Group on Capacity Building and Data Democracy
WG Disasters Observation for Disasters
VC Title Goes Here Name (s), Organization, CEOS Affiliation
WG Title Goes Here Name (s), Organization, CEOS Affiliation
WG Capacity Building & Data Democracy (WGCapD)
CEOS strategy for GFOI Phase 2
CEOS Analysis Ready Data Strategy
Presentation transcript:

CEOS Disaster Risk Management Implementation Phase Status Ivan Petiteville (ESA) on behalf of CEOS DRM Team CEOS SIT-28 Meeting Hampton, Virginia, USA 14 March 2013

SIT-28 Meeting Hampton, Virginia, USA March 2013 CEOS Vision for DRM If successful, demonstration of space agencies’ capacity to provide the right EO data that can be transformed into high-value information Facilitate the positioning of EO from Space in the 2015 post-Hyogo framework of actions … Top Objectives: 1.Increase and strengthen the contribution of EO satellite to the various DRM phases through a series of coordinated enlarged actions 2.Raise the awareness of politicians, decision-makers and major stakeholders on the benefits of using satellite EO in all phases of DRM. How ? … Improve the coordination between EO satellites observations and take appropriate actions aiming at better distributing EO satellite data and fostering its use by the DRM users…

SIT-28 Meeting Hampton, Virginia, USA March 2013 CEOS Vision for DRM: Actions 5 Major Actions: 1.Define a Global Satellite Observation Strategy for DRM Detailed assessment of needs, gaps and definition of observation requirements in terms of EO data (similar to FCT and JECAM) Definition of strategy in response to observation requirements; 2.Implement the Global Satellite Observation Strategy for DRM each CEOS agency to acquire, process and archive the EO satellite data and products (e.g. L0 to L2) 3.Set up a virtual repository for DRM-relevant data / products / information from both space agencies and DRM-Users and make the repository content accessible to all DRM users provide DRM user community with a series of tools to discover & access EO data through DRM-dedicated web portal (one stop shop); includes access to DRM Baseline Dataset 4.Set up DRM Data Processing Platform: a capacity to enable access to EO based Value Added products, tools & on demand processing - support science & services exploitation of Satellite EO (requires infrastructure for science data) – enable EO based content generation & hosting user generated content 5.Ensure the positioning of EO from Space in the 2015 post-Hyogo Framework of Actions 2015 post-Hyogo FA Plan ( ) to be adopted at 2015 World Conference on Disaster Risk Reduction and UN Nations Assembly Close dialog with the major stakeholders in charge of defining the 2015 post-Hyogo FA 3 Supporting Actions: 6. DRM Outreach & Evaluation of CEOS DRM Actions 7. EO Capacity Building for DRM, 8. Satellite EO DRM Projects Database

SIT-28 Meeting Hampton, Virginia, USA March Overview Following approval of 2012 CEOS Plenary, team work focused on: Development of Implementation Plan CEOS Observation Strategy Positioning of EO space agencies in 2015 World Conference of Disaster Risk Reduction (incl. post-Hyogo Framework for Action) Supporting actions: Outreach, Capacity Building, Satellite EO DRM Projects Database Implementation Plan available at SIT-28. Cover period with initial focus on Will be updated annually e.g. addition of follow-on actions after endorsement of CEOS Observation Strategy CEOS Observation Strategy Will be delivered at 2013 CEOS Plenary

SIT-28 Meeting Hampton, Virginia, USA March CEOS Observation Strategy Staged approach: initial focus on 3 types of hazards: flood, seismic risks and volcanoes only 3 thematic priorities to focus efforts across a limited number of demonstrators and geographic areas, over the coming 3 years. 3 Thematic Teams created. 3 Pilots to demonstrate the added value of both EO satellite data and CEOS coordination to a set of activities of different nature: various user communities, various stakeholders, various DRM phases, … Interface to User Communities/ Stakeholders to get real User Needs in relation to the 3 Pilots assess & prioritize user needs  gap analysis w.r.t. current CEOS Agencies assets  derive EO requirements to address subset of gaps that can be realistically addressed by CEOS with resources available  CEOS Observation Strategy in response to EO requirements

SIT-28 Meeting Hampton, Virginia, USA March Thematic Teams 2 co-Leads for each thematic area and thematic Experts nominated to assist in the development of pilots and acquisition strategies for each thematic priority area; 3 Thematic Teams co-leads: oFlooding: NASA and CSA oSeismic hazards: ESA and DLR oVolcanoes: USGS and ASI 11 Experts have joined the 3 thematic Teams in the last 6 weeks. On- going discussion with potential additional Experts. VERY ENCOURAGING !!! Call to CEOS agencies to reinforce the 3 Thematic Teams with Experts

SIT-28 Meeting Hampton, Virginia, USA March 2013 Ad hoc team (Co- chairs Petiteville/ESA & Seguin/CSA) Floods (Lindsay/NASA & Seguin/CSA) Experts, Users*, Stakeholders* Seismic (Bally/ESA & Hoffmann/DLR) Experts, Users*, Stakeholders* Volcanoes (CL Poland/USGS & Zoffoli/ASI) Experts, Users*, Stakeholders* Observation Strategy Development Work Structure : external to the Ad Hoc Team New thematic team members DRM Team Thematic Teams

SIT-28 Meeting Hampton, Virginia, USA March 2013 Guidelines produced to help Thematic Teams define pilots from existing projects or based on new activities 3 Thematic Pilots to: Demonstrate that proper coordination of CEOS Agencies efforts can improve on-going DRM-related projects. Demonstrate that some global / worldwide activities can be achieved through appropriate collaboration of CEOS space agencies. Reinforce existing and create new links with the major DRM stakeholders. Ensure a greater role for EO space data providers in the next post-Hyogo Framework for Action. 8 3 Thematic Pilots (1/2)

SIT-28 Meeting Hampton, Virginia, USA March 2013 Three 3-year thematic coordinated pilots, in partnership with user communities: Similarly to FCT / GFOI, in a staged approach towards a global strategy, initial regional focus to make more rapidly a visible and concrete CEOS’ contribution to the 2015 review of the “post Hyogo Framework for Action”. Strong user involvement to be successful; bring providers and users of EO together Demonstrate added value of EO to DRM Users; Present EO in a non-satellite centric, ‘integrated’ solution that shows how satellite EO can be an enabler, bringing innovative solutions to traditional DRM challenges. 9 3 Thematic Pilots (2/2)

SIT-28 Meeting Hampton, Virginia, USA March Implementation Plan Describes how the DRM activities will be executed during Initial focus on Plan will be updated end of 2013 to include the follow-on actions related to CEOS Observation Strategy Pilots aim at improving on-going disaster-related activities from space agencies and CEOS (e.g. CEOS Disaster SBA team activities on Flood Monitoring) Schedule is tight, constrained by the 2015 milestone (World Conference on Disaster Risk Reduction): Pilot templates completed (draft 1): end of March Proposed pilot descriptions (draft 2): end of April Refined pilots (draft 3): mid-June EO data requirements for each pilot: end of July Final proposed pilots: early September Presentation of pilots to SIT Workshop: September Presentation of both CEOS Observation Strategy and set of follow-on recommended actions for 2014 onwards to CEOS Plenary

SIT-28 Meeting Hampton, Virginia, USA March Meetings In addition to monthly telecons, 2 meetings planned: 1.DRM Team & Thematic Teams meeting (NASA Goddard, USA – May 13-14, 2013) 2.(still TBC): DRM Team & Thematic Teams meeting (location TBD: side meeting to Living Planet symposium (Edinburgh, Sept. 2013) ? )

SIT-28 Meeting Hampton, Virginia, USA March 2013 THANK YOU !!!! Pictures from THANK YOU …