The Vision for Space Exploration Old Lessons Apply in the New World C. Herbert Shivers, PhD, PE, CSP Deputy Director Safety and Mission Assurance Directorate.

Slides:



Advertisements
Similar presentations
ABC Change Orders College of Environmental Design
Advertisements

Developed by Reneta Barneva, SUNY Fredonia
Engineering Leadership
What is System Safety? System Safety is an effort to make things as safe as practical by systematically using engineering and management tools to identify,
SAFETY Is Everyone’s Responsibility
INFORMATION SYSTEMS SECURITY ENGINEERING: A CRITICAL COMPONENT OF THE SYSTEMS ENGINEERING LIFECYCLE Kevin Behr SE 516 – Technical Article Presentation.
Chapter Fourteen Organization Culture.
(Clockwise starting in left back row)  Ellison S. Onizuka, Mission Specialist  Sharon Christa Mc Auliffe, Teacher  Greg Jarvis, Payload Specialist.
Bridging Industry Best Practices in Project Management and Safety Assurance to Academic Propulsion Research Ahsan Choudhuri, PhD Professor and Chair, Department.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety The Future Role.
Brownfields 2013 Ron Snyder, HMTRI/CCCHST Adapted from: Todd Conklin PhD Los Alamos National Laboratory.
Learning and Culture: Bringing Together the Sharp End and the Blunt End John S. Carroll MIT Sloan School of Management Presented at The Quality Colloquium,
DoD Software Systems.  Characteristics of DoD S/W Development  Evolution of DoD S/W Development  Learning from the Commercial World  Additional Technologies.
Mission Success Starts With Safety Shuttle Service Life Extension (1) Michoud Assembly Facility, La. 19, 20 March ‘03 Bryan O’Connor NASA Safety Officer.
SOFTWARE QUALITY ASSURANCE Maltepe University Faculty of Engineering SE 410.
Why do accidents happen?  Accidents happen for one or both of the following Unsafe acts & Unsafe conditions.
Chapter 7: Risk, Safety and Liability in Engineering
ACCIDENTS DON’T HAVE TO HAPPEN Three elements of a successful safety process: Hazard analysis Pro-active planning Employee participation.
Presentation R. R. Lutz. Analyzing Software Requirements Errors in Safety-Critical Embedded Systems. In Proceedings of the IEEE International Symposium.
APPLICATION OF A RISK-BASED DECISION SUPPORT TOOL FOR EVALUATING AVIATION TECHNOLOGY INTEGRATION TO A CONTROLLED-FLIGHT-INTO-TERRAIN ACCIDENT by Denise.
CS 282 Simulation Physics Lecture 1: Introduction to Rigid-Body Simulation 1 September 2011 Instructor: Kostas Bekris Computer Science & Engineering, University.
Applied Software Project Management 1 Introduction Dr. Mengxia Zhu Computer Science Department Southern Illinois University Carbondale.
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
Accident Prevention.
CARLOS CEDEÑO DSES /04/2008 Reliability of the Three Main Engines of Space Shuttle.
Proactive Risk and Problem Management March 14 – 15, 2011 John E. Tinsley Director, Air & Missile Defense Systems Mission Assurance 19 th Annual Conference.
JOB HAZARD ANALYSIS Example Guide.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Mental resilience – Lesson 2 27/01/15
Systems Engineering for Space Vehicles Bryan Palaszewski with the Digital Learning Network NASA Glenn Research Center Cleveland, OH.
ACA 2014 Applications of Computer Algebra Session: Computer Algebra in Education Fordham University New York, NY, USA, July 9-12.
May 2010Approval of Experimental Aircraft for Instrument Flight APPROVAL OF EXPERIMENTAL AIRCRAFT FOR INSTRUMENT FLIGHT Richard L (Dick) Newman (M) and.
SOFTWARE ENGINEERING1 Introduction. Software Software (IEEE): collection of programs, procedures, rules, and associated documentation and data SOFTWARE.
Lesson 5. International standard on auditing 315, states that the auditor should:  “…obtain an understanding of the entity and its environment sufficient.
2.2 Software Myths 2.2 Software Myths Myth 1. The cost of computers is lower than that of analog or electromechanical devices. –Hardware is cheap compared.
Paul E. Chiodo Deployment Director, Lean Six Sigma Certified Lean Six Sigma Master Black Belt US Army Armament Research, Development & Engineering Center.
1 CAA Offshore Helicopter Review Mark Swan Group Director, Safety and Airspace Regulation.
Accident Investigation Board (AIB) for the Test Site 9920 Event 1 SAND P.
Slide 1V&V 10/2002 Software Quality Assurance Dr. Linda H. Rosenberg Assistant Director For Information Sciences Goddard Space Flight Center, NASA
National Aeronautics and Space Administration From Determinism to “Probabilism” Changing our mindsets, or why PTC isn’t an easy sell - yet.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
Ethics of Software Testing Thomas LaToza CS 210 Final Presentation 12 / 2 / 2002.
From Quality Control to Quality Assurance…and Beyond Alan Page Microsoft.
Lecture 4. Software Engineering Body of Knowledge SWEBOK  Articulating a body of knowledge is an essential step toward developing a profession because.
Safety on Call ACCIDENT PREVENTION. Safety on Call WHY DO ACCIDENTS HAPPEN? Accidents happen for one or both of the following: – Unsafe acts – Unsafe.
Presented to: COMSTAC RLV Working Group By: Ken Wong, Licensing and Safety Division Deputy Manager Date: October 10, 2007 Federal Aviation Administration.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
Probabilistic Technology Initiative for NASA Pam Caruso Technical Assistant to the Director, Engineering NASA/Marshall Space Flight Center Presented to.
Design Space Exploration/Identification In Elegant System Design and Operation Michael D. Watson NASA Marshall Space Flight Center Michael D. Griffin Chief.
SPACE Act of 2015 Dr. Sarah J. Nilsson, Esq. A 3 ir Conference January 2016.
Safety and Mission Assurance Directorate, Goddard Space Flight Center Supply Chain Management Panel Session: NASA Supplier Assessments: Processes, Results.
1 The Requirements Problem Chapter 1. 2 Standish Group Research Research paper at:  php (1994)
GSFC Safety & Mission Assurance (SMA) Briefing for Goddard Contractor Association 7/2/15.
Safety & Health Considerations in Accommodating Commercial Activties David Loyd, JSC Safety & Test Operations 2013 NASA Safety Directors & Occupational.
NCSX Hutch Neilson NCSX Project Manager NCSX Team Meeting January 20, 2005 Meeting Our Safety Management Responsibilities.
Human Factors in Accident Investigation
Usability Engineering Dr. Dania Bilal IS 582 Spring 2007.
Practical Scheduling – PMICOS in Australia Presented by: Ed Blow (MTC Australasia Pty Ltd) 2 November 2005 PMI-College of Scheduling.
LIVE INTERACTIVE YOUR DESKTOP March 2, 2011 NES: Engineering Design Challenge: Spacecraft Structures Presented by: Kristy Hill.
CHALLENGER DISASTER : CASE STUDY – TO BE
Introduction.
ايمني بيمار evaluation PATIENT SAFETY
چرخه توسعه نرم‌افزار در ناسا
Software Engineering for Safety: a Roadmap
Strategic Shift For Enterprise X
Computer in Safety-Critical Systems
Lisa Whittaker College of Aviation Western Michigan University
Visual Agenda for Elbit Systems of America
Division Chief, Spaceport Management & Integration
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

The Vision for Space Exploration Old Lessons Apply in the New World C. Herbert Shivers, PhD, PE, CSP Deputy Director Safety and Mission Assurance Directorate NASA/Marshall Space Flight Center Presented to the Conference on Quality in the Space and Defense Industries 2007 Cape Canaveral, Florida March, 2007

Part One - Panel Introduction – Apollo Lessons

NASA Evolved from Saturn to Shuttle to Ares

Safe Exploration is Still the Goal

Dr. Eberhard Rees –Dr. Rees succeeded Dr. Von Braun as Director of Marshall Space Flight Center (March 1, Jan. 19, 1973 ) –Dr. Rees spoke to The World Management Congress in Munich in 1972 –Dr. Rees spoke words that are as true today as they were then –We do well to remember

Planning To Assure effective program execution: “A superior planning effort without diligent planning – especially systems planning – right from the start, any project is doomed sooner or later to run into most serious difficulties.” Dr. Eberhard Rees

Significance of Planning “We had great difficulties in finding technical experts who understood the value of planning. For the military, strategic planning is a matter of course. The same is true for any commercial undertaking where to neglect planning is to court bankruptcy. Why it is so hard to introduce proper planning into project and system management of projects of a more scientific nature is perplexing to me.” Dr. Eberhard Rees

Cost of Quality “The program management permits faulty components to enter the system – due to lack of quality control and testing – the components would only be detected in overall checkouts. And finally, unrealistically short time schedules endanger the quality of the product and cost control, whereas long, drawn-out time plans increase total project cost.” Dr. Eberhard Rees The Trade:

Risk Balance There has to be an optimum balance among technical performance, time schedule and cost. In the Apollo Program, this balance was deliberately shifted toward technical performance and time schedule. “There has to be an optimum balance among technical performance, time schedule and cost. In the Apollo Program, this balance was deliberately shifted toward technical performance and time schedule.” Dr. Eberhard Rees

Vigilance –“If eternal vigilance is the price of liberty, then chronic unease is the price of safety.” Professor James Reason (2005, p 37) –One might just as well say, “quality”

SSE and Quality Engineering Pre-design System Safety, “Are the requirements inclusive, correct and being correctly implemented?” System focused perspective Quality, “Are the requirements inclusive, correct and being correctly implemented?” System focused perspective

SSE and Quality Engineering Post-design System Safety, “Was the specification correct and what happens if the system meets or doesn’t meet the specification?” All failures don’t create hazards, all hazards aren’t failure based, analyze interactions instead of single components Quality, “Does the system as built meet its specification?” Component failure focused

Accident Causation –The focus of accident causation has broadened over the years: – Hardware and software failures (1950’s to present) –Unsafe acts, errors and violations (1970’s to present) –System and cultural issues (1980’s to present) (James Reason, 2006) Quality and System Safety both are instrumental in the prevention process