An Overview of the Development of a Renewable Energy Project And the 5 Major Milestones to Achieve Financing By Robert Hunter Director of Operations, Green.
Advertisements

The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Microgrid – A Smart Grid Alternative Service Delivery Model? Thomas.
Promoting Renewable Energy Development on Closed MA Landfills Sarah Weinstein, Massachusetts Department of Environmental Protection, AEHS Foundation, UMass.
Solar Power Presented By G2Power Technologies Saint Louis, MO.
Small Wind and Solar Systems Kristi Robinson Steele-Waseca Cooperative Electric.
SolarCurrents TM Rebuild Ypsilanti Julie Londo August 26, 2010.
Section 1603 Payments Guidance for Final Months of Program Solar Wisconsin Fall Conference October 25, 2011 Michael Allen.
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
Interconnection of Distributed Generation and Net-Metering in MA Tim Roughan National Grid.
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
Net Metering and Interconnection A Policy Perspective Brad Klein Staff Attorney Envt’l Law & Policy Center March 28, 2007.
Interconnection of Distributed Generation
BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.
Siting Considerations for Utility Scale Photovoltaic Power Generation Systems. Tim Green, Brookhaven National Laboratory NE FWS Biologists Conference February.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
What - How Does Solar System Work? Grid-connected projects can apply for Net Metering (utility meter spins backwards)
Practical Ways For Towns to Save Money With Clean Energy Projects Paul Michaud Murtha Cullina LLP April 30, 2014.
1 RELIABILITY AFFORDABILITY ENVIRONMENTAL STEWARDSHIP Bringing Solar to the Community Jennifer Szaro, Orlando Utilities Commission.
Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy.
Small Farm Profitability: Is Wind Energy the Answer? 1
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
Genesis Solar Module Brochure ™
NJ Clean Energy Program Noveda Technologies Liberty Science Center By: Joe Fiorella Information from the:
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
Discussion of Feed-in Tariff Pilot Programs September 18, 2013 Presentation to the Regulatory Flexibility Committee of the Indiana General Assembly 1.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Creating A Cleaner Energy Future For the Commonwealth Focusing on Solar PV: Technology, Siting Considerations, Incentives Natalie Andrews Renewable Energy.
Solar Energy Services: Delivering Cost Effective Solar Power March 18, 2004 Claire Broido SunEdison, LLC (443) 226.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Citizens’ Academy Kathy Viehe GRU Interim General Manager November 12, 2014.
GSA National Capital Region Energy Efficiency Exchange Renewable Energy Projects w/ Private Funding Ronald Allard National Capital Region Energy Branch.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Provided by: Training Module: Energy Improvement Loans CDFI Deal Examples This training contains general information only and Deloitte is not, by means.
Small Generation Interconnection Standards - IOU Dennis Reed Westar Energy Topeka, KS September 26, 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
Cost of Going Solar in DC 4 Ways to Save! 1.DC Rebate $3/watt up to 3KW…. 2.Federal Tax Credit 30% of Total 3.Savings on your energy Bill (Net Metering.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
Stormwater Control & Design
Renewable Generation Interconnection Ken Brunkenhoefer Distributed Generation Consultant
1 Distributive Generation Wind Landfill Solar Fuel CellMicro-Turbine.
Lynne Welsh Massachusetts Department of Environmental Protection.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
WFEC and Its Rural Electric Cooperative Members Solar Power October 16, 2015 Fall PR-MR & Marketing Meeting.
Distributed Generation Registration June 30, 2008.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
LPEA BAYFIELD SUBSTATION LA PLATA COUNTY LOCATION & EXTENT REVIEW March 12, 2015.
Town of Bethlehem DG Bethlehem Solar, LLC Zoning Board of Appeals Wednesday, October 1, 2014 David Albrecht, P.E., PV Engineers, D.P.C. Virginia Cook,
Distributed Generation Chau Nguyen, Pricing & Sales Support
Updating the MA DG Interconnection Report DOER analysis of the Utility reporting of DG interconnection projects following the Expedited and Standard Review.
R E N O V U S. S O L A R Town of Catlin Community Solar Farm May 12, 2016 Jon McNamara.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Getting a Grid Connection to Export Power Energy in Agriculture rd August 2016.
Planning and Realisation of Wind Farms
FUEL CELLS.
Distributed Generation Chau Nguyen, Pricing & Sales Support
DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
PEPCO Energy here Used there
The Joint Accounting Conference 2018
FIELD LEVEL CHALLENGES FOR SOLAR PARKS IN INDIA
City Council April 30, 2018 Item 13
CONSTRUCTION REGULATIONS AND CODES
Environmental Sustainability Manager
SOLAR POWER – BOONVILLE WWTP CASE STUDY September 19, 2018 Charles R
Photovoltaic Systems Engineering Application to PV Systems
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Siting Renewable Energy on Contaminated Land MA DEP Clean Energy Workshop Tim Roughan Director of Energy and Environmental Policy November 7, MW Haverhill, MA

2 Agenda  Interconnection Issues  Power Sales Background  Building on MGP Sites  Q&A 1 MW Sutton, MA

3 National Grid’s Solar Projects  Six Sites  Everett: 605 kW - MGP  Haverhill: 1,016 kW - MGP  Revere: 750 kW -MGP  Sutton: 983 kW - rooftop  Waltham: 225 kW - rooftop  Dorchester: 1,250kW – MGP, see below Total PV Capacity: 4,829 kW Total Production to Date: 7,722 MWh Revere Pre-construction

4 Connected Capacity (MW) by Technology by year and total (Jan 2009-September 2012) 4

5 Applications Submitted (MW) by Technology by year and totals (Jan 2009-September 2012) 5

6 Interconnection to the Utility  Generators can connect at various voltage levels based on:  Aggregate rating of generation system  Type of distribution system located nearby and characteristics of the system  Interconnecting customer is responsible for costs of all studies and upgrades to the electric distribution system  Interconnection voltage levels:  Transmission – usually =>69 kV (bulk power)  Distribution – 13 kV, 23kV, 34 kV  Secondary voltages – 120/240 single phase, 120/208 three phase, 277/480 three phase  Early research can help determine the makeup of local transmission or distribution:  Three-phase power nearby?  Voltage level of local distribution? (e.g. 4 kV feeder can limit connection)  Any red flags from the local utility? (e.g. other DG already on line or tail end of feeder, etc.)

7 Interconnection Example  Interconnecting Customer (IC) applies to install 1.5 MW wind turbine and has well designed relay protection system and proposed settings  Initial review determines that an Impact Study is required  IC signs Impact Study Agreement and pays for study  Impact Study is completed and required EPS modifications and costs are communicated to Interconnecting Customer along with any changes needed to protection system  Interconnection Agreement (IA) sent to Interconnecting Customer for signature  Interconnecting Customer pays for EPS modifications  Company builds system modifications, registers asset, etc.  Interconnecting Customer signs IA, builds facility, submits required insurance and relay test report.  Company conducts witness test and authorizes interconnection

8 Rules of Thumb  If aggregate generation on a feeder is over 15% of peak feeder load, there may be special reviews required.  The feeder voltage will impact the size of generator that can be safely interconnected at the distribution level. Currently for PV, a maximum of 3 MWs is allowed on a 13 kV feeder.  If the generator will sell on the market and has to apply through ISO-NE, the process may take longer than the standard time frames.  Generators over 10 KW are most likely going to be three-phase. Make sure that the customer has three-phase service available. If a line extension is required, it is at the customer’s expense.  Some things of note on various things that must happen between the time an application is received and a system can go on line:  During initial analysis and various studies, there is usually an exchange of information which takes time. Customer and contractor’s quick response to any utility questions is vital.  System modifications can take some time, especially if specialty equipment must be ordered. Lead times for substation equipment can be 4-6 months and can only be ordered after detailed design is completed (design can also take a number of months).  ISO-NE Reliability Council review and asset registration for larger units which will export power.

9 Sale of Excess Power in MA  Payment streams  Net-metering up to 2 MWs for solar, wind, farm sited projects, and anaerobic digestion: (~8 to 13¢ per excess kWh)  Virtual net-metering – transfer of credits earned at one customer account to one or more other customer accounts in same load zone  If not eligible for net-metering, treated as a qualifying facility (QF) under PURPA  Utilities pass through hourly clearing price at the ISO-NE (3-4¢ per excess kWh)  Renewable Energy Credits (RECs) (~ 6¢ per generated kWh) and Solar Renewable Energy Credits (SRECs) (~ ¢ per generated kWh) paid for up to 6 MWs per property  Federal and State tax credits

10 Project Financing  PPA (purchase power agreement)  These are provided by developers to finance large projects  Net-metering PPA  Under net-metering, developers have to transfer credits to monetize the value to either private or governmental customers  Customer then pays the developer back either through a flat price per kWh, or a percentage of credit

11 Building on a MGP Site  MGP sites are typically fairly large and dirty compared to the average disposal site in MA and can be located near wetlands  Additional permitting beyond the Wetlands Protection Act may be necessary (e.g., Ch. 91) and can significantly delay the project  Consider existing or planned deed restrictions and how that will affect the layout of the site and/or any construction activities  Understanding the extent and magnitude of contamination prior to design is important as there will be lots of subsurface disturbance with utility trenches, the PV module mounting (a.k.a. racking) system, transformer pads, inverter pads, and other equipment pads  Racking/mounting system is either driven (piles), augured (“fence post”) or ballasted (concrete blocks - precast or poured in place). Each can pose a challenge when dealing with contaminated soil or fill depending upon the site specific conditions  Selection of mounting system can be greatly influenced by presence of contamination on site, the amount of fill on site and the number and location of former building foundations or other subsurface obstructions on site

12  Plan on stockpiling contaminated soil as part of the site lay-down area design  Plan for dust and odor control with detailed documentation  Consider sequencing work such that the majority of contaminated soil handling is done prior to mobilizing “non-40 hr Trained” contractors that are necessary (e.g., electricians)  Establish and enforce site control (exclusion zone, contamination reduction zone and support zone) when necessary  Clearly demark restricted areas for non-trained personnel on site  Provide basic Health and Safety Briefing and Tailgate meetings for all workers on site.  Ensure clean travel ways are present for equipment deliveries (there are lots of trucks bringing racking systems, electrical equipment, confrere, and PV modules to site that need to drive in, unload, turnaround and drive out without tracking mud (clean and dirty) to the streets Building on a MGP Site

13  Storm Water Pollution Prevention Plan (SWPPP) will likely be required, these are excellent reminders for the contractor to control off site migration of mud and dust while controlling erosion  Stockpiles must be taken seriously by all site contractors  Covering them daily is likely required by LSP in Release Abatement Measures (RAM) plan and is a best management practice. Ensuring that happens is difficult and clear lines of responsibility for this task must be established  Plan ahead and stay ahead of disposal so that delays will not be blamed on that huge soil pile you are waiting for analytical on  Daily documentation of site activities, with respect to potential contamination issues, may never be important, but when it is, it’s invaluable  Make sure LSP or representative is included in weekly update meetings and is involved in scheduling and 2 week look ahead Building on a MGP Site

14 Challenges & Lessons Learned Challenges  Permitting process with the cities and towns  Know the interconnection process  Coordinating project work with numerous agencies and special interest groups, e.g. Neighborhood Associations, EPA, Boston Redevelopment Authority, neighboring Fire Departments, etc.  Security - fencing Lessons Learned  Understand the importance of proper preparation and planning necessary to educate and inform municipal authorities and special interest groups  Ensure necessary approvals are received to construct panels on sites with existing company operations  Complete project description and meeting the interconnection requirements are essential.

15 Questions Tim Roughan