Copyright © Praxis Critical Systems Limited 2002 The Way Ahead Session Praxis Critical Systems Tom Anderson – The Commission’s View Discussion The Next.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

EAC HIGHER EDUCATION POLICY
Quality Assurance and Quality Control Skill Sets:
1 Safety Assurance JPDO Perspective Maureen Keegan 11 October, 2012.
TickITplus – what it can do for you Talk to BCS Hants March 2012 Graham Gee Quality & InfoSec Manager.
1 Areas and types of work available Salary & Benefit information People you can count on, products you can trust.
© 2011 Underwriters Laboratories Inc. Product Recall and the Supply Chain: ISO Best Practices Robert Pollock Chair, US Technical Advisory Group for ISO.
22000 Food Safety Management Systems
OHT 4.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Pre-project components Software project life cycle components Infrastructure.
IT Outsourcing Management
Components of software quality assurance system overview
Ch3. CP AND ENVIRONMENTAL MANAGEMENT SYSTEMS Course on Cleaner Production Middle East Technical University Department of Environmental Engineering Ankara.
Introduction ITV Model-based Analysis and Design of Embedded Software Techniques and methods for Critical Software Anders P. Ravn Aalborg University August.
Introducing Open Platform for NFV Please direct any questions or comments to 1.
Rm ppt Application of the Competence Guidelines to Software Engineering DIRC Workshop on Software Quality and the Legal System 13 February 2004 DIRC.
Supply Chain Development A step-change in Supply Chain performance 08/08/2015 OFFICIAL 1 Supply Chain Focus Group – 17 th September 2014 Vic Carlill.
Fraud Prevention and Risk Management
Welcome ISO9001:2000 Foundation Workshop.
The TILP Certified Localisation Professional Programme (CLP) Become a certified localisation professional Acquire the skills to develop your career Hire.
Diana Laurillard Head, e-Learning Strategy Unit Overview of e-learning: aims and priorities.
Software Quality assurance SQA – SWE 333
SQA Architecture Software Quality By: MSMZ.
Business Analysis: A Business Unit Perspective International Institute of Business Analysis January 18, 2012.
21 September 2010Social Dialogue European level1 Situation and current problems of Social Dialogue in the Private Security Sector from the European point.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Development of Sectoral Training Centres in Lithuania Rimantas Dumčius Public Policy and Management Institute
1 UKRAINIAN EXPERIENCE ON LEADING OUT OF DOMESTIC ENTERPRISES TO EUROPEAN RECOGNITION Petro Kalyta, President of Ukrainian Association for Quality, President.
Copyright © 2004 Sherif Kamel Information Systems Planning Sherif Kamel The American University in Cairo.
TickIT Standard1 Advanced Software Engineering COM360 University of Sunderland.
Strategic Management of IS/IT: Organization and Resources
A Project ’ s Tale: Transitioning From SW-CMM to CMMI-SE/SW Warren Scheinin Systems Engineer, NG Mission Systems CMMI Technology Conference & User Group.
Approaches to quality assurance TIPA’s perspectives Fatmir Demneri.
S Q A.
25 November 2002 DeSIRE, Pisa Methods and Tools for Formal Design and Validation Michael Butler University of Southampton
CMS 00_ Copyright 2002 Raytheon Company All Rights Reserved CMMI – What a Difference a Sponsor Makes! Ann Turner Raytheon Company
W. A D V I K. RU Introduction materials. W. A D V I K. RU Lines of activity General contracting; Telecommunication; Engineering; Security; Construction.
Serving the Public. Regulating the Profession.. A Strategic Plan is not an ends… …but rather a means 2.
Dependability in FP 6 Brian Randell Pisa Workshop, November 2002.
Michael deLamare Requirements Management Program Functions R-9.
Introduction Training on Safe Hospitals in Disasters.
ISA Setting the Standard for Automation ™ Automation Standards Compliance Institute ISA Security Compliance Institute (ISCI) Prepared by: Andre Ristaino,
ISPLC 2001 PLC in the IST Programme Thierry Devars DG INFSO/E1
Hungarian Management Consulting Industry in Highlights of European Trends Dr. György Gonda, member of the Board of VTMSZ FEACO Conference, Budapest 9 November.
UNIDO - Energy Efficiency Creating a Standard Framework for Sustainable Industrial Energy Efficiency Lorence Ansermet UNIDO Regional Office in South Africa.
A Global Approach to Protecting the Global Critical Infrastructure Dr. Stephen D. Bryen.
International Atomic Energy Agency M. El-Shanawany IAEA Technical Support & Capacity Building Programme M. El-Shanawany Department of Nuclear Safety &
Jacques Bus Head of Unit, DG INFSO-F5 “Security” European Commission FP7 launch in the New Member States Regional on-line conference 22 January 2007 Objective.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
SE513 Software Quality Assurance Lecture12: Software Reliability and Quality Management Standards.
Multitude of source of errors - various style of source of errors will affect the SQA components * The environment in which software development & maintenance.
Improving performance, reducing risk LRQA Service Summary Name: Lionel Westall, LRQA Company: IOSH Date: April 2016.
Prevention & Protection SAME ENDS DIFFERENT MEANS? THE FUTURE STRUCTURE AND PURPOSE OF CFOA’ s PREVENTION AND PROTECTION ACTIVITIES.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
Reaching for k Nines Miroslaw Malek Humboldt University Berlin, Germany
Components of software quality assurance system overview
Components of software quality assurance system overview
Training Course on Integrated Management System for Regulatory Body
Components of software quality assurance system overview
Identify the Risk of Not Doing BA
Food Production Systems
Overview – Guide to Developing Safety Improvement Plan
Overview – Guide to Developing Safety Improvement Plan
Security/Safety Technical Committee
Technology Adoption Services
By Jeff Burklo, Director
Components of software quality assurance system overview
ISO management systems
The business model defines characteristics
Good practices for risk assessment and control activities
Luca Simoncini PDCC, Pisa and University of Pisa, Pisa, Italy
Presentation transcript:

Copyright © Praxis Critical Systems Limited 2002 The Way Ahead Session Praxis Critical Systems Tom Anderson – The Commission’s View Discussion The Next Steps

Copyright © Praxis Critical Systems Limited 2002 Praxis Critical Systems Limited Alan Hawes

Copyright © Praxis Critical Systems Limited 2002 Founded in 1983 as Praxis plc First to ISO9001 Joined Altran Technologies in autonomous companies operating within Altran Group High technology, Engineering consultancy Annual turnover of 1Bn Euro, 13,000 technical staff Company Facts

Copyright © Praxis Critical Systems Limited 2002 Technical excellence Professional Development Scheme Low staff turnover Active role in industry Staff

Copyright © Praxis Critical Systems Limited 2002 Markets Transport 35% Aerospace/Defence 45% (including ATM) Other 20% Finance Telecoms Media Pharms Research

Copyright © Praxis Critical Systems Limited 2002 Competencies Software and Systems Engineering and Delivery Safety Management and Safety Engineering Requirements Engineering Human Factors Engineering Process Consultancy Independent Verification and Validation Programme Management Risk Management Research SPARK Ada Tools

Copyright © Praxis Critical Systems Limited 2002 Praxis’ Business Focus and Approach High Integrity Critical Systems (Software Intensive) –Safety Critical –Business Critical –Mission Critical –Security Critical Risk-directed Engineering Approach –Application of rigour, formality –Process/tool adoption to principle –Assurance optimisation –Right first time, dependable delivery “Correctness by Construction”

Copyright © Praxis Critical Systems Limited 2002 Praxis’ Research Interests Common Risk Assessment Method Risk Directed Approach Allocating Requirements to Components Defining Dependability Assuring Dependability Complex Problems Embedded Systems Building with Untrusted/Trusted components Secure Web, Open Source

Copyright © Praxis Critical Systems Limited 2002 Alan Hawes Design and development of dependable systems Safety research (ESPRIT) Safety consultancy Infosec research (INFOSEC 93) Infosec consultancy Dependability research (ACTS)

Copyright © Praxis Critical Systems Limited 2002 SafSec Integrated Safety & Security Certification Study Common Concepts from Safety and Security worlds Methodology that satisfies both world’s accreditation/certification needs Methodology that can handle highly flexible and modular systems

Copyright © Praxis Critical Systems Limited 2002 The Way Ahead Session Praxis Critical Systems Tom Anderson – The Commission’s View Discussion The Next Steps

Copyright © Praxis Critical Systems Limited 2002 Discussion

Copyright © Praxis Critical Systems Limited 2002 The Way Ahead Session Praxis Critical Systems Tom Anderson – The Commission’s View Discussion The Next Steps

Copyright © Praxis Critical Systems Limited 2002 The Next Steps Delegates improved view of DeSIRE Opportunity to refine ideas Establish the shape of the IP

One view of DeSIRE Aerospace Fault Forecasting e-Business Healthcare Infrastructure Inter- dependencies Dependability Case Support Intrusion Management Modelling And Simulation Training, Best Practice Application Studies Tools and Components Support Measures || Fault Tolerance Fault Removal Fault Prevention Dependability Policy Support

Copyright © Praxis Critical Systems Limited 2002 DeSIRE Steering Committee AMSD participants establish committee Define IP core structure and membership Committee will work with core to establish primary membership Review will identify any gaps Newcastle/Praxis take responsibility for co-ordination