Thermal GEM assumptions Erwan Hemery 12 May 2009.

Slides:



Advertisements
Similar presentations
Technical & Economic Assessment Grid, Mini-grid & Off-grid Electrification Technologies Chubu Electric Power Co.,Inc. (CEPCO) Toyo Engineering Co. (TOYO)
Advertisements

Technologies for CCS on Natural Gas Power Systems Satish Reddy April 2104.
Hal T. Interactions between Carbon Regulation & Renewable Energy Policies  Thoughtpiece: The CATF is in a position to consider program.
Steve Moorman Mgr Business Development, Advanced Technologies Babcock & Wilcox CO2 Emission Reduction from Coal Fired Plants FutureGen 2.0 CO2 Capture.
ME 210 Advanced Thermodynamics
Thermodynamics April 27, 2015April 27, 2015April 27, 2015.
E: Track II Project level analyses Robert Lempert, RAND 1.
Lignite Project By Ramic, Haris. GLOBAL OUTLOOK FOR ENERGY World energy consumption is projected to increase at about 1.8%/year between 2000 and 2030(driven.
DRAFT 1 Calculating electricity emission factors for SEIP TAG (Oct 08) Mark Dean MED.
B9 Coal Deploying Fuel Cells to Generate Cheap, Clean Electricity from Fossil Fuels.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
SWOT Analysis of Supercritical & Ultra-Supercritical Power Plants Strengths: High Thermal Efficiency Environment Friendly Significant breakthroughs in.
1 Single-cycle mixed-fluid LNG (PRICO) process Part I: Optimal design Sigurd Skogestad & Jørgen Bauck Jensen Quatar, January 2009.
Diesel / Brayton Cycles
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering AguaRed.
Haroon S. Kheshgi, ExxonMobil Research and Engineering Company Commercialization Process for CCS on Natural Gas Power Systems Economics of Natural Gas.
Hydrogen Fueling Station: St. Louis Kyle Terry Tibben Zerby Tory Carlsen Zack Tomechko 1.
Financing model for power plants with CCS Carbon Capture and Storage: Perspectives for the Southern Africa Region Johannesburg May 31-June 1, 2011 Nataliya.
Week 1 Unit Conversions Mass and Volume Flow Ideal Gas Newtonian Fluids, Reynolds No. Week 2 Pressure Loss in Pipe Flow Pressure Loss Examples Flow Measurement.
Patrick Carragher Coal Supplies and Clean Coal Technology.
20% by 2030 The future of wind energy in New Zealand Eric Pyle, Chief Executive.
Joint OSPE – PEO Chapter Energy Policy Presentation Prepared by OSPE’s Energy Task Force 1.
The Energy Challenge Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego November 7, 2007.
Week 1 Unit Conversions Conservation of Mass Ideal Gas Newtonian Fluids, Reynolds No. Pressure Loss in Pipe Flow Week 2 Pressure Loss Examples Flow Measurement.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Future of Renewables in Victoria Dr Jeff Washusen Marsden Jacob Associates VPELA 30 April 2012.
© Copyright 2013, First Solar, Inc. Arizona’s Energy Future August 21, 2014.
Avoided Costs of Generation
IGCC: Technology to Make Coal Green(er)
ST-589: Climate Change and Carbon Sequestration Final Project Earl Reynolds.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Page 1 May 08 Energy – Fossil Power Generation 700°C Steam Turbine for highest efficiency Energy – Fossil Power Generation 700°C Steam Turbine – Challenges.
Mitigating Coal/Lignite Environmental Impacts: Kosovo C Case Study Charles Feinstein, World Bank.
Carbon Capture and Storage - can it make coal clean? Dr. Shannon Page Department of Environmental Management Lincoln University.
Co-Production of Hydrogen and Electricity (GHG/07/42) Hydrogen may be used in future as an energy carrier In the long term it is expected.
Michigan Air Quality Division Greenhouse Gas BACT Analysis for Wolverine Power Supply Cooperative Inc. Mary Ann Dolehanty Permit Section Chief Air Quality.
CCS The development worldwide Evonik’s view Dr. Alfred Tacke Chairman of the Board of Management Evonik Steag GmbH, Germany.
1 Investment costs in the Virtual Test GRI NW Investment I1- Virtual Test/Business Simulation Bas Barten Gas Transport Services.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Workshop of St Petersburg - 27 th October 2009 Expert sub-group on Emerging Technologies/Techniques EGTEI - Emerging technologies/ techniques for LCPs.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
The role of gas in developing Carbon Capture and Storage (CCS)
 Moving to Advanced Supercritical Plant & Capture-Ready Measures Dr P. Mahi; P. Napier-Moore Mott MacDonald.
The use of heat pumps in district heating systems Joe Grice Energy capital projects manager 24/11/2015.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
U.S. Wind power since 1995 From EIA website Annual Energy Report: % annual growth DATA FIT.
Solar energy at Uniworld Gardens 400kW to provide back up power
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
Consumer Cost Effectiveness of Carbon Mitigation Policies in Restructured Electricity Market Jared Moore and Jay Apt (adviser) CMU Engineering and Public.
High Level Post Processing Cost Estimates MWG SSC Meeting September 26, 2011.
1 Canadian Clean Power Coalition: Delivering Results for Over a Decade 3) Fuel Cell Repowering Results.
1 11. PROFITABILITY EVALUATION OF NEW POWER PLANT ALTERNATIVES Asko Vuorinen.
Science A Physics – P1 Science A Physics – P1 Topic 1: Electricity Generation - 3 Topic 1: Electricity Generation - 3.
Energy System Investment and Risk Management Unit 2: Energy Economics and Markets Connect Seminar, 3 rd March 2016, 18:30GMT.
Stationary Cogeneration Fuel Cell for Structures Group J Carlos Gomez, Kunal Kekre, Heenam Lee, Alex Mraz, Paul Schochat NPRE University of Illinois.
Innovations in low temperature heat to power generation Prof. Jeremy Miller Group Research and Solutions Manager.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
Biomass GEM assumptions Erwan Hemery 12 May 2009.
Viability of Carbon Capture and Sequestration Retrofits for Existing Coal- fired Power Plants under an Emission Trading Scheme CEDM Annual Meeting May.
“Other” Cost Estimates
EXERCISES Two water reservoirs are connected by a pipe 610m of 0.3m diameter, f’=0.038 and the flow produced by the difference in water surface elevations.
Electricity Generation: Coal v/s N-Gas - Basic Economics
Flocculator Extras.
Electricity Generation: coal v/s n-gas - Basic Economics
Flexible Forward Contracts for Renewable Energy Generators
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Security of supply - deriving a winter energy standard using the DOASA model EPOC Winter Workshop September 2018.
Additional clarifications on economic and adequacy running hours
Ciara O’Dwyer Damian Flynn ESRI/UCD conference 17/09/2019
Presentation transcript:

Thermal GEM assumptions Erwan Hemery 12 May 2009

Number of peakers available Before: 15 peakers - 10 diesel and 5 gas, total capacity = 2500 MW Now: 37 peakers - 24 diesel and 13 gas, total capacity = 2960 MW Engine capex and HR The capex decreases with the installed capacity and the capex increases with the efficiency – intercool system 15-20% more expensive Reference: GTW handbook 2009

Peakers details Gas peakers Diesel peakers Assumptions: 80 % of the total cost is exposed to foreign currency e.g. LMS100 US$709/kW at exchange of 0.8 = NZ$886/kW + 20% for local cost = NZ$1063/kW at exchange of 0.5 = NZ$1418/kW + 20% for local cost = NZ$1701/kW Location: Marsden, Otahuhu, Huntly, Port Maunganui, Whirinaki, New Plymouth, Gracefield and Islington. Location: Stratford, Southdown, Otahuhu, and Huntly.

Peakers O&M costs Average is presented above but fixed and variable O&M would differ between engine size and type (decrease vs capacity and more expensive for diesel engine) For the gas engine an extra $2/GJ is added on the top of the gas price to reflect gas flexibility

CCGT Reference: GTW handbook 2009 and GE website

CCGT details Assumptions: 80 % of the total cost is exposed to foreign currency e.g. US$600/kW at exchange of 0.5 = NZ$1200/kW + 20% for local cost = NZ$1440/kW

Coal Assuming exchange rate of 0.6 for the triangles O&M coal should be ~$100/kW instead of $40/kW Adjust Coal/Lignite capex price as the CCGT capex has been changed : roughly 2.33 times more expensive than CCGT (~ $NZ 3300/kW)

Coal and Lignite HR HR values in GEM average at 10,000 GJ/GWh (36 %)…this is true for existing subcritical (180 bar, 540 o C) New subcritical coal plant with conventional environmental controls operate closer to 39% efficiency Supercrital steam-cycle (240 bar, 570 o C) have become the system of choice in Europe and USA and have efficiency in the range of 42% to 45%. IGCC and ultra-supercritical plants could have 50% efficiency Coal HR in GEM: 8600 GJ/GWh (42 %) Lignite HR in GEM: 9300 GJ/GWh (39 %)

CCS Before we had a gain in efficiency but that’s the opposite there is a loss in efficiency caused by the capturing ~ 10% less then a standard Coal CCS cost has been set to twice the price of standard coal (IEA,2006) – cheaper in the future? Calculation shows that CCS break even with Coal at a carbon charge of $110/t (good agreement with IEA). IEA says in the future break even could be at ~$NZ 90/t roughly equivalent to a 10% decrease of capex …in the base case ($75/t) we need to drop the capex by 25% to built CCS instead of Coal or set the carbon charge higher (do we want Coal generation in the TTER base case?) CCS has been set to $US 2800/kW

Pipeline costs Rough calculation to add an extra concost to the gas fired station depending on their location (steady state isothermal gas flow model) Sfd and Hly no gas concost Swn, Ota and hpi required gas concost Set all the potential CCGT and OCGT to max offtake and remove the constraint – get the diameter and the total cost (based on ITL costs estimate) Need to extent the Maui pipeline (750 mm) to Ota. Split the total cost (fraction of the volume used for each power station) for the 1 st 80 km For hpi an extra 40 km of 350 mm pipeline is required and half of the cost goes to 240 MW Rodney 1 and 240 MW Rodney 2. CCCT $m OCGT $m 8-15