02/09/2010 Access conditions for test of the RB.A23 at 17:30. Splice mapping. Complete machine closed by ~18:00.Problems in getting TI2 ready for injection.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
Beam expected in the afternoon PM: – Establish first-turn – Establish closed orbit – Rough correction of machine parameters Evening: – RF capture Night:
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
● 08h00: Adjust mode for end-of-fill study. Scraping test for determining transverse beam profile (beam 2, vertical). As expected, beam dumped with BLM.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC Fri 6 & Sat 7 Nov :00 End instabilities MD, dump to refresh air at dump TDE cavern 08:00 Access for vacuum team at the TDE starting 10:30 Access.
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
LHC Machine Operational Status and Plans LHCC, 22nd September 2010 Steve Myers (On behalf of the LHC team and international collaborators)
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday 21 March 2012.
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Tuesday TOTEM and transverse loss map (1) OK
Summary week 30 Week 30 R. Bailey & J. Wenninger
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
Friday March 4th 08h32: Access for beam dump system.
Week 35 – Technical Stop and Restart
Friday 14th December - morning
Monday February 28th 8h00: Injection
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Summary for LPC (March 7th, Ralph Assmann)
Plan for 1 m b* J. Uythoven & J. Wenninger
Summary Tuesday h23: Machine closed. Precycle started.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
RAMP FOR COLLIMATOR SETUP
Another Immortal Fill….
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

02/09/2010 Access conditions for test of the RB.A23 at 17:30. Splice mapping. Complete machine closed by ~18:00.Problems in getting TI2 ready for injection (some PC still blocked-out) + ALICE inj. permit 19:30 – 20:00 verification of the beam trajectory in TI2 and TI8 in order to check for any potential effect of magnet replacement in SPS with pilot beam. Only minor (H) corrections applied (Jörg): not yet copied to the other cycles. To be verified once we move to trains. Accesses in points 5 – 6 and 8 to solve problems with QPS and completion of re-commissioning of circuits affected by interventions during the technical stop

02/09/ :30: all circuits tests completed. OK from MP3 to power RB.A23. Machine closed and ready for pre-cycle 04:00 Machine ready for injection for B2 at ~04:00. Issue with interlock coming from TI2 collimators for injection of B1 Corrections for B2 orbit 06:30 Access in point 2 for interlock issue. Problem with a cable connection. 07:30 End of access start pre-cycle

Plan 3FriM8 Ramp/squeeze/collision test with single bunch/beam 1e10 at 2 A/s for qualification of the status of the machine + dump qualification\ 3FriA4 Transverse feedback setting up: noise reduction (450 GeV - single nominal bunch) 3FriA/N8 ramp at 10 A/s with single bunch/beam 1e10 + squeeze: measure - correct - re-measure beta m- K-modulation + dump qualification 4SatM8 Injection / injection protection: bunch trains up to 12 bunches (150 ns spacing) - crossing angles ON 4SatA4 Injection / injection protection: bunch trains up to 12 bunches (150 ns spacing) - crossing angles ON 4SatA4 Check whether 100 murad half-angle OK with 12 nominal bunches 4SatN8ramp at 10 A/s with single bunch/beam 1e10 + squeeze: measure beta m 5SunM8 Transverse feedback setting up: noise reduction (450 GeV - single nominal bunch) - crossing angle ON 5SunA8 Injection / injection protection: bunch trains up to 4x12 bunches (150 ns spacing) - crossing angles ON 5SunN6ramp at 10 A/s with single bunch/beam 1e10 + squeeze and crossing angles ON 6MonM8 Injection / injection protection: bunch trains up to 4x12 bunches (150 ns spacing) - crossing angles ON 6MonA8 Collimation set-up at 450 GeV/c 6MonN8 Transverse feedback setting up: noise reduction (450 GeV - single nominal bunch) - crossing angle ON

02/09/2010 Polarities for ALICE solenoid/spectrometer: + + Polarity for LHCb spectrometer: - External crossing angles: – IR1: -100  rad at inj./ramp/squeeze/collision – IR2: ±170  rad at inj./ramp and ±110  rad squeeze+collision – IR5: +100  rad at inj./ramp/squeeze/collision – IR8: -100  rad at inj./ramp/squeeze/collision – To be finalized crossing angle for injection/ramp: 170  rad at inj./ramp for all IPs?