8 May 2002 Abilene Update Session Steve Corbató Director, Backbone Network Infrastructure HENP Working Group Washington DC Steve Corbató Director, Backbone.

Slides:



Advertisements
Similar presentations
STAR TAP meeting: International Transit Network Update Heather Boyles and Steve Corbató
Advertisements

HPIIS Program Review The Internet2 Perspective Doug Van Houweling President and CEO, Internet2 25 October 2000 San Diego, CA.
University of Illinois at Chicago The Future of STAR TAP: Enabling e-Science Research Thomas A. DeFanti Principal Investigator, STAR TAP Director, Electronic.
February 2002 Global Terabit Research Network: Building Global Cyber Infrastructure Michael A. McRobbie Vice President for Information Technology & CIO.
Abilene and Internet2 Engineering Update Guy Almes Terena Networking Conference 2002 Limerick, Ireland Guy Almes Terena Networking Conference 2002 Limerick,
1 Update Jacqueline Brown Pacific Northwest Gigapop Internet2 Member Meeting Indianapolis October 13-16, 2003.
Internet2, Abilene, and GigaPoPs: Una vista de los EE UU Steve Corbató Director, Backbone Network Infrastructure.
14 June 2015 Internet2: Today, Tomorrow and the GTRN Douglas E. Van Houweling President and CEO, Internet2 Douglas E. Van Houweling President.
The Campus as key to Internet2 Engineering Atlanta Guy Almes 30 May 2000.
6 May 2002 Next Generation Abilene and Advanced National & Regional Infrastructure CENIC 2002 San Diego CENIC 2002 San Diego.
May 2001GRNET GRNET2 Designing The Optical Internet of Greece: A case study Magda Chatzaki Dimitrios K. Kalogeras Nassos Papakostas Stelios Sartzetakis.
Abilene Update Joint Techs Summer ’05 Vancouver, CA Steve Cotter Director, Network Services Steve Cotter Director, Network Services.
1 Update Jacqueline Brown University of Washington APAN Meeting Busan, Korea 29 August 2003.
23 September 2015 Pan-Continental Perspective: Key Issues seen by Internet2 Guy Almes Heather Boyles Steve Corbató.
Internet2 and international partners Heather Boyles Director, International Relations Ana Preston Program Manager,
International Task Force Meeting March 7, a.m. to noon Washington, DC.
Next Generation Peering for Next Generation Networks Jacqueline Brown Executive Director International Partnerships Pacific Northwest Gigapop CANS2004,
Sponsored Educational Group Participation in Abilene Laurie Burns Director, Member Activities, Internet2 EDUCAUSE Gathering of State Networks Denver, Colorado.
The Research and Education Network: Platform for Innovation Heather Boyles, Next Generation Network Symposium Malaysia 2007-March-15.
The Singapore Advanced Research & Education Network.
HOPI Update Rick Summerhill Director Network Research, Architecture, and Technologies Jerry Sobieski MAX GigaPoP and TSC Program Manager Mark Johnson MCNC.
14 October 2015 Internet2: Accelerating the Development of Tomorrow’s Internet Heather Boyles Director, International Relations Internet2
Advanced Network Infrastructure Initiatives 1 SURA Advanced Network Infrastructure Initiatives SURA Dr. Donald R. Riley Vice President and CIO University.
 End to End Performance Initiative 1 October 2001 EDUCAUSE October 2000 Internet2 End-to-End Performance Initiative or Fat Pipes Are Not Enough.
Delivering Circuit Services to Researchers: The HOPI Testbed Rick Summerhill Director, Network Research, Architecture, and Technologies, Internet2 Joint.
Copyright 2004 National LambdaRail, Inc N ational L ambda R ail Update 9/28/2004 Debbie Montano Director, Development & Operations
Abilene update and Internet2 Network of the Future Southern Illinois University Internet2 Day Steve Corbató, Director of Backbone Network Infrastructure.
Abilene SEGP Update  Tennessee Statewide Network Planning Meeting  Heather Bruning, Abilene Program Manager May 13, 2003.
Abilene update IBM Internet2 Day July 26, 2001 Steve Corbató Director of Backbone Network Infrastructure.
Sponsored Educational Group Participation in Abilene Laurie Burns Director, Member Activities, Internet2 EDUCAUSE Gathering of State Networks Denver, Colorado.
Florida International UniversityAMPATH AMPATH: Pathway of the Americas Internet2 Member Meeting: International Task Force October 28, 2002 Julio Ibarra.
Indiana University Abilene NOC Abilene ITN Engineering Brent Sweeny Indiana University I2 member meeting, 31 Oct 2000.
Internet2 Network Observatory Update Matt Zekauskas, Measurement SIG 2006 Fall Member Meeting 4-Dec-2006.
STAR TAP, Euro-Link, and StarLight Tom DeFanti April 8, 2003.
9 July 2001 Internet2 and Thai Advanced Networking Initiatives Douglas Van Houweling President and CEO, Internet2.
INDIANAUNIVERSITYINDIANAUNIVERSITY TransPAC Engineering Chris Robb Indiana University
Internet2 Update CCIRN Meeting 8 June 2001 Stockholm.
May Global Terabit Research Network: Building Global Cyber Infrastructure Michael A. McRobbie Vice President for Information Technology & CIO Indiana.
Internet2/Abilene Perspective Guy Almes and Ted Hanss Internet2 Project NASA Ames -- August 10, 1999.
Abilene Overview and Connectivity Options NSF-HPNC Proposal Preparation Workshop Heather Bruning, Abilene Program Manager 12 April 2002.
7 May 2002 Next Generation Abilene Internet2 Member Meeting Washington DC Internet2 Member Meeting Washington DC.
Internet2: Presentation to Astronomy Community at Haystack T. Charles Yun April 2002.
CENIC meeting May 2001 Internet2 international program Heather Boyles
Abilene Update SC'99 :: Portland :: 17-Nov-99. Outline Goals Architecture Current Status NGI Peering International Peering Multicast.
26 October 2001 National Summit On Broadband Deployment Implications From Internet2.
Internet2: an update Heather Boyles Reunión de Otoño CUDI 2000 Monterrey, México 6 y 7 de noviembre.
Abilene: Everything You’ve Always Wanted to Know, but Couldn’t Find on the Web Site Brown Bag Session Heather Bruning, Abilene Program Manager 13 August.
CA*net3 - International High Performance Connectivity 9th Internet2 Member Meeting Mar 9, Washington, DC tel:
Internet2 Members Meeting Washington, DC 1 Advanced Networking Infrastructure and Research (ANIR) Aubrey Bush Division Director, ANIR National Science.
The Internet2 Network and LHC Rick Summerhill Director Network Research, Architecture, and Technologies Internet2 Given by Rich Carlson LHC Meeting 25.
The Internet2 Network and LHC Rick Summerhill Director Network Research, Architecture, and Technologies Internet2 LHC Meeting 23 October 2006 FERMI Lab,
International High Performance Connectivity
The Campus as key to Internet2 Engineering
Campus Focused Workshop on Advanced Networking
Internet2 Network of the Future
Internet2: an update Heather Boyles, Director, International Relations, Internet2 APAN meeting Phuket, Thailand January 22-24, 2002.
Internet2 Abilene Network and Next Generation Optical Networking
Internet2 Network of the Future
Next Generation Abilene
Internet2 Network of the Future
Internet2: an overview Heather Boyles

Internet2 Network of the Future
Infrastructure Update
National R&E networking infrastructure
Steve Corbató Director, Backbone Network Infrastructure Tempe
Internet2 Network of the Future
The Campus as key to Internet2 Engineering
IPv6 in Internet2 This is a general overview presentation about Internet2. Internet2 is a consortium, led by US universities, which is recreating the partnership.
Abilene Update Rick Summerhill
Presentation transcript:

8 May 2002 Abilene Update Session Steve Corbató Director, Backbone Network Infrastructure HENP Working Group Washington DC Steve Corbató Director, Backbone Network Infrastructure HENP Working Group Washington DC

8 May Agenda Network status & events of interest 10-Gbps upgrade plans Optical networking on the regional & national scale

8 May Abilene – May, 2002 IP-over-SONET backbone (OC-48c, 2.5 Gbps) 53 direct connections 4 OC-48c connections 1 Gigabit Ethernet trial 23 will connect via at least OC-12c (622 Mbps) by 1Q02 Number of ATM connections decreasing 215 participants – research universities & labs All 50 states, District of Columbia, & Puerto Rico 15 regional GigaPoPs support ~70% of participants Expanded access 50 sponsored participants –New: Smithsonian Institution, Arecibo Radio Telescope 23 state education networks (SEGPs)

8 May Abilene international connectivity Transoceanic R&E bandwidths growing! GÉANT – 5 Gbps between Europe and New York City now Key international exchange points facilitated by Internet2 membership and the U.S. scientific community STARTAP & STAR LIGHT – Chicago (GigE) AMPATH – Miami (OC-3c  OC-12c) Pacific Wave – Seattle (GigE) MAN LAN - New York City (GigE/10GigE EP soon) CA*NET3/4: Seattle, Chicago, and New York CUDI: CENIC and Univ. of Texas at El Paso International transit service Collaboration with CA*NET3 and STARTAP

Sacramento Los Angeles Washington Abilene International Peering STAR TAP/Star Light APAN/TransPAC, Ca*net3, CERN, CERnet, FASTnet, GEMnet, IUCC, KOREN/KREONET2, NORDUnet, RNP2, SURFnet, SingAREN, TAnet2 NYCM BELNET, CA*net3, GEANT*, HEANET, JANET, NORDUnet Pacific Wave AARNET, APAN/TransPAC, CA*net3, TANET2 SNVA GEMNET, SINET, SingAREN, WIDE LOSA UNINET AMPATH REUNA, RNP2 RETINA, ANSP, (CRNet) OC3-OC12 El Paso (UACJ-UT El Paso) CUDI San Diego (CALREN2) CUDI * ARNES, CARNET, CESnet, DFN, GRNET, RENATER, RESTENA, SWITCH, HUNGARNET, GARR-B, POL-34, RCST, RedIRIS 09 March 2002

8 May Packetized raw High Definition Television (HDTV) Raw HDTV/IP – single UDP flow of 1.5 Gbps Project of USC/ISIe, Tektronix, & U. of Wash (DARPA) 6 Jan 2002: Seattle to Washington DC via Abilene –Single flow utilized 60% of backbone bandwidth 18 hours: no packets lost, 15 resequencing episodes End-to-end network performance (includes P/NW & MAX GigaPoPs) – Loss: <0.8 ppb (90% c.l.) – Reordering: 5 ppb Transcontinental 1-Gbps TCP requires loss of – <30 ppb (1.5 KB frames) – <1 ppm (9KB jumbo)

8 May End-to-End Performance: ‘High bandwidth is not enough’ Bulk TCP flows (transfers > 10 Mbytes) Current median flow rate over Abilene: 1.9 Mbps –95th percentile: 7.0 Mbps

8 May Netflow information sources Weekly summaries Raw data manipulation

8 May Jumbo frames are supported here Default Abilene MTU: 4.5 kB Now we also support 9 kB MTUs on per connector basis Motivation: support for HPC computing Interested connectors? Contact the NOC

8 May Future of Abilene Original UCAID/Qwest agreement amended on October 1, 2001 Extension of MoU for another 5 years – until October, 2006 Originally expired March, 2003 Upgrade of Abilene backbone to optical transport capability - ’s (unprotected) x4 increase in the core backbone bandwidth –OC-48c SONET (2.5 Gbps) to 10-Gbps DWDM

8 May Key aspects of next generation Abilene backbone - I Native IPv6 Motivations –Resolving IPv4 address exhaustion issues –Preservation of the original End-to-End Architecture model p2p collaboration tools, reverse trend to CO-centrism –International collaboration –Router and host OS capabilities Run natively - concurrent with IPv4 Replicate multicast deployment strategy Close collaboration with Internet2 IPv6 Working Group on regional and campus v6 rollout –Addressing architecture

8 May Key aspects of next generation Abilene backbone - II Network resiliency Abilene ’s will not be ring protected like SONET Increasing use of videoconferencing/VoIP impose tighter restoration requirements (<100 ms) Options: –MPLS/TE fast reroute (initially) –IP-based IGP fast convergence (preferable)

8 May Key aspects of next generation Abilene backbone - III New & differentiated measurement capabilities Significant factor in NGA rack design –4 dedicated servers at each nodes –Additional provisions for future servers –Local data collection to capture data at times of network instability Enhance active probing –Now: latency & jitter, loss, reachability (Surveyor) –Regular TCP/UDP throughput tests – ~1 Gbps Separate server for E2E performance beacon Enhance passive measurement –Now: SNMP (NOC) & traffic matrix/type (Netflow) –Routing (BGP & IGP) –Optical splitter taps on backbone links at select location(s)

8 May Abilene Observatories Currently a program outline for better support of computer science research Influenced by discussions with NRLC members 1) Improved & accessible data archive Need coherent database design Unify & correlate 4 separate data types –SNMP, active measurement data, routing, Netflow 2) Provision for direct network measurement and experimentation Resources reserved for two additional servers –Power (DC), rack space (2RU), router uplink ports (GigE) Need process for identifying meritorious projects Need ‘rules of engagement’ (technical & policy)

8 May

8 May Next generation router selection Extensive router specification and test plan developed Team effort: UCAID staff, NOC, NC and Ohio ITECs –Chris Heerman, Matt Davy, Lee Graham, John Moore, Paul Schopis, Matt Zekauskas Discussions with four router vendors Tests focused on next gen advanced services High performance TCP/IP throughput High performance multicast IPv6 functionality & throughput Classification for QoS and measurement 3 routers tested & comm. ISPs referenced  New Juniper T640 platform selected

8 May Two leading national initiatives in the U.S. Next Generation Abilene Advanced Internet backbone –connects entire campus networks of the research universities 10 Gbps nationally TeraGrid Virtual machine room for distributed computing (Grid) Connecting 4 HPC centers initially –Illinois: NCSA, Argonne –California: SDSC, Caltech 4x10 Gbps: Chicago  Los Angeles Ongoing collaboration between both projects

8 May Deployment timing Ongoing – Backbone router procurement Detailed deployment planning July – Rack assembly (Indiana Univ.) Aug/Sep – New rack deployment at all 11 nodes Fall – First Wave ’s commissioned Fall meeting demonstration events iGRID 2002 (Amsterdam) – late Sep. Internet2 Fall Member Meeting (Los Angeles) – late Oct. SC2002 (Baltimore) – mid Nov. Remaining ’s commissioned in 2003 Please let us know now of 2002 upgrade plans

8 May Abilene cost recovery model Connection (per connection)Annual fee OC-3 (155 Mbps)*$110,000 OC-12 (622 Mbps)$270,000 Gigabit Ethernet (1 Gbps)**$325,000 OC-48 (2.5 Gbps)$430,000 OC-192/10 GigE** (10 Gbps)$490,000 Participation (per university)$20,000

8 May Abilene program changes 10-Gbps (OC-192c POS) connections backhaul available wherever needed & possible –Only required now for 1 of 4 OC-48c connections 3-year connectivity commitment required Gigabit and 10-Gigabit Ethernet Available when connector has dark fiber access into Abilene router node Backhaul not available ATM connection & peer support TAC recommended ending ATM support by fall 2003 Two major ATM-based GigaPoPs have migrated 2 of 3 NGIXes still are ATM-based STAR LIGHT is now GigE Urging phased migration for connectors & peers

8 May Conclusions – Abilene future Backbone upgrade project underway Partnership with Qwest extended thru 2006 Juniper T640 routers selected for backbone 10-Gbps backbone deployment starts this fall Advanced service foci Native, high-performance IPv6 Enhanced, differentiated measurement Network resiliency Incremental, non-disruptive transition Complementary to and collaborative with NSF’s TeraGrid

8 May For more information Web: Again please let us know now of 2002 connection upgrade plans

8 May Optical network project differentiation Distance scale (km) ExamplesEquipment Metro< 60 UW(SEA), USC/ISI(LA) Dark fiber & end terminals State/ Regional < 500 (ULH: <2500) I-WIRE (IL), CENIC ONI, I-LIGHT (IN) Add OO amplifiers Extended Regional/ National > 500 PLR, TeraGrid Abilene Add OEO regenerators & O&M $’s

8 May Regional optical networking Regional (state-based) optical networking projects are critical for next generation architecture: Three-level hierarchy: –National backbones, GigaPoPs, Campuses Leading examples of state-based initiatives –CENIC ONI (California), I-WIRE (Illinois), I-LIGHT (Indiana), NC Close collaboration with the Quilt Project Regional Optical Networking effort U.S. carrier DWDM access is now not nearly as widespread as with SONET cities for DWDM vs. ~120 cities for SONET (ca. 1998)

8 May Pacific Light Rail (Source: Greg Scott, CENIC/UCSC)

8 May National optical networking options 1 – Provision incremental wavelengths Obtain 10-Gbps ’s as with SONET Exploit smaller incremental cost of additional ’s –1 st cost is ~10x than subsequent ’s 2 – Build dim fiber facility Partner with a facilities-based provider –Acquire 2 fiber pairs on a national scale –Outsource operation of transmission equipment Needs lower-cost optical transmission equipment –Find ELH/ULH optical kit partner The classic ‘buy vs. build’ decision in Information Technology Option 1 selected for TeraGrid and Next Gen Abilene

8 May National Light Rail Project objectives form lightweight, but highly coordinated, collaboration to provision, acquire, and/or operate optical networking assets and services leverage collective buying power and experience of the consortium (ANL, CENIC, P/NW, UCAID) from the metropolitan to the national scales serve as optical infrastructure substrate for e-science projects proposing to a diverse array of funding agencies facilitate advanced network measurement and academic research Initial collaboration TeraGrid (Argonne), UCAID, CENIC and P/NW GigaPoPs UCSD, UIC

8 May National Light Rail – an evolving view Key Functions brokerage service using established relationships with multiple facilities-based carriers Ongoing evaluation of potential acquisition and operation of national fiber optical network facility in partnership with the corporate sector