H orizontal E -region e X periment… PI:M. Conde. Co-Is:J. Craven, E. Wescott, H. Nielsen, J. Hawkins, D. Lummerzheim, R. Smith, M. Larsen. E/PO PI:J. Hawkins.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

CIP Cyber Security – Security Management Controls
EDD/581 Action Research Proposal
Geospace Electrodynamic Connections (GEC) Mission The GEC mission has been in the formulation phase as part of NASA’s Solar Terrestrial Probe program for.
PREPARE Final reporting period Months February 2013 to 31 July 2014.
Chapter 3 Project Initiation
RockSat-C 2012 CoDR Minnesota Sound Wreckers Conceptual Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
Protection Values for VOR-Defined ATS Routes
International Ice Charting Working Group IICWG V Data, Information & Customer Support Standing Committee Report Co-Chairs Ari Seina & Florence Fetterer.
Multipoint observations of nightside auroral activity: the Cascades2 sounding rocket mission K A Lynch, Dartmouth College 2009 Fall AGU SM53D-05 Dartmouth.
Design of a small instrumented atmospheric descent probe NASA Ames Research Center.
On Site Review Process Office of Field Services.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Sequence of Flight The reconstruction of ATS surveillance system data may bring to light items of importance in the Operations investigation in relation.
Leaders Manage Meetings
The BIM Project Execution Planning Procedure
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Aerosonde User’s Workshop Wallops Aerosonde UAV Facility Mission Proposing And Costing Factors Chuck Williams.
New Mexico Space Grant Consortium Student Launch Program Provide annual access to space for student experiments from Spaceport America.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
Erica Cummings Grant Coordinator 1.  The New Mexico Department of Homeland Security and Emergency Management (DHSEM) is responsible for:  Monitoring.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
NIST Special Publication Revision 1
Chapter 17. Writing Proposals © 2004 by Bedford/St. Martin's1 Classification of Proposals Internal or external Solicited or unsolicited Research Proposals.
NuPAFP Conference October 13-14, 2010 Operational Adjustment Grants.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Critical Design Review- UCF Jeremy Young Anthony Liauppa Erica Terry, Emily Sachs Kristen Brightwell Gillian Smith 1.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
Research & Technology Implementation TxDOT RTI OFFICE.
10/22/20151 NCTCOG Sustainable Development Call for Projects Interlocal Cooperative Agreement Reporting Form Reimbursement Phase 1: PS&E and.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
On Site Review Process Office of Field Services Last Revised 8/15/2011.
NWPP Multiple-Award Technical Support Contract (eff. 08/2005) Unit 8 Unit 8 “Managing the Task Order”
REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: 2519S02 FOR
Enterprise Service Desk (ESD) Enterprise Service Desk for Notification / Knowledge Article Authors.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Judges Score Card Overview Mark Turner NASA Ames Research Center.
2013 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Evaluating Media Service Program Chapter 13 Presented by: Dal Marie Hawkins.
State of Georgia Release Management Training
Dr. Bea Bourne 1. 2 If you have any trouble in seminar, please call Tech Support at: They can assist if you get “bumped” from the seminar.
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Geophysical Institute, University of Alaska Fairbanks 1 Outline We will launch a sounding rocket north from PFRR. The final stage will include an attitude.
Project Management ISE 5101 Karl Smith Project Monitoring & Control I Project Meetings.
Learning today. Transforming tomorrow. REED: Review Existing Evaluation Data 55 slides.
Payload Operations and Integration Center MSFC Daily Summary for PDs.
SPECIAL EVENT& CONFERENCE PLANNING Karen Goodlad, HMGT 1101 F12.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
Preparation of the Self-Study and Documentation
Module 5: Communication Plan and Process for Addressing Barriers
Planetary Lander PDR Team Name
EE Third-Party Solicitation Process Workshop Solicitation Alignment
The Federal programs department September 26, 2017
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner
Space Express Sub-Orbital Mission
Sounding Rocket PDR Team Name
Sounding Rocket CDR Team Name
EDD/581 Action Research Proposal (insert your name)
Team Name Round 2 Flight Readiness Review (this is a bare-bones template – reorder the slides and/or make it fancier if you wish, but be sure to address.
Mars Rover CDR Team Name
United Nations Voluntary Fund on Disability (UNVFD)
EDD/581 Action Research Proposal (insert your name)
Policies, Procedures, and Best Practices IEEE AESS PANELS 2019 Prepared by the Technical Operations Committee Contents: Applying for Panel Approval Forming.
Training for 2018 Funded Program Evaluation form
<Your Team # > Your Team Name Here
<Your Team # > Your Team Name Here
Presentation transcript:

H orizontal E -region e X periment… PI:M. Conde. Co-Is:J. Craven, E. Wescott, H. Nielsen, J. Hawkins, D. Lummerzheim, R. Smith, M. Larsen. E/PO PI:J. Hawkins “HEX” I also considered: Horizontal E-Region Experiment To Investigate Coupling … “HERETIC” 08-Jan-2001

Objectives for today Remind everyone of what we have proposed to do. Identify the major sub-components of the GI’s effort. Agree upon assignment of leaders for each component. Discuss the budget available to support each component. Discuss attendees for meetings at Wallops this year. Discuss preparations needed for the Mission Initiation Conference. Discuss other issues not identified here. Assign action items as needed. Schedule our next team meeting.

Project Summary The proposed sounding rocket experiment will measure: Vertical and horizontal zonal winds near a stable pre-midnight auroral arc lying ~300-km north of Poker Flat, using ground-based images of the drift of an approximately 200-km long, near- horizontal TMA trail deployed at ~160-km altitude. Height-resolved horizontal wind vectors between km altitude using a second rocket, deploying a near-vertical TMA trail. A 2-dimensional (latitude, altitude) cross section of the auroral arc’s nm or nm luminosity distribution using tomographic inversion of a payload photometer’s spin-scans. Relative electron density variations along the horizontal trajectory using a payload plasma probe provided by the student rocket program. Numerous other geophysical observations provided by ground- based instrumentation.

Proposed trajectory This figure shows an example of one possible trajectory for the horizontal rocket payload. The heavy blue line indicates the proposed extent of the TMA trail:

Down-range camera sites This map fragment shows the rocket trajectory’s ground footprint, and the location of the three proposed down- range camera sites. The heavy dark section of the rocket path indicates the proposed extent of the horizontal TMA trail.

Intended outcome… The Figure opposite is a hypothetical depiction of data assimilated from most (but not all) of the rocket-derived observations.

Responsibilities Component Responsible officers Scientific leadershipConde Vehicle and flight operationsNASA mission manager TMA payloadsLarsen Ground-based camerasWescott/Nielsen Payload photometerCraven/Lummerzheim Plasma density probeHawkins Education/Public outreachHawkins

GI sub-projects Component Sub-grant name Scientific leadershipHex-Sci Ground-based camerasHex-DRO Payload photometerHex-Phot Plasma density probeHex-Plas Education/Public outreachHex-EPO The table below identifies the major sub-components of the GI’s role in this mission. I propose that the GI business office should setup corresponding internal sub-grants to fund each of these activities. I have suggested names for each. This structure has worked well in the past. (recently, for example, in the Big Crow project.)

Down-range personnel Establishment and operation of the down-range sites is to be supervised jointly by Wescott and Nielsen. It is important for overall project management that personnel be identified who are willing and able to attend these sites during the launch window. At least the lead person for each site should be identified as early as possible. One suggestion is: Arctic Village – Wescott Old Crow – Nielsen Toolik Lake – Lummerzheim or Desrochers

The Budget! This is a copy of the 3-year budget that we submitted, rendered in the GI’s in-house format. I have color-coded many items according to their GI sub- component. Legend:Red=HEX-Sci, Green=HEX-DRO, Blue=HEX-Phot, Purple=HEX-Plas

Funding by major component ComponentYear 1Year 2Year 3Totals Scientific leadership 1 41,52641,96038,559122,045 Ground-based cameras 1 6,18237,61784,028127,827 Payload photometer 1 77,35062,91615,743156,009 Plasma density probe 1 10,000 30,000 Education/Public outreach 2 10,000 30,000 TMA payloads 3 96,10089,60060,400246,100 GI overhead77,24379,40976,527233,179 Totals318,401331,502295,257945,160 Notes:1. These amounts do not include overhead. 2. E/PO is actually funded separately from the main proposal. 3. These are the total amounts paid to Clemson University each year via subcontract. Presumably, Co-I Larsen will actually be able to use ~2/3 of these amounts after Clemson’s overhead is charged. Warning:This table is for illustration only. The separation by component was done crudely; it does not include all amounts. Exact accounting will be done by the business office at a later date.

Milestones Important to NASA Mission Initiation Conference Requirements Definition Meeting Mission Readiness Review

Meetings at Wallops Meetings held for each mission occur in this order: Mission Initiation Conference (MIC) Requirements Definition Meeting (RDM) Design Review (DR) Mission Readiness Review (MRR) Additional meetings may also be held as follows: Status Reviews Pre-Integration Review (PIR) These meetings represent milestones in the overall project schedule. Each is treated as an important event.

GI attendees for Wallops meetings During 2001, we will likely need to attend two meetings at Wallops. Our budget only includes travel support for four person-trips to Wallops this year. This is less than I would like, but it’s what we have. My suggestion for meeting attendees is: Mission Initiation Conference: Conde, Wescott. Requirements Definition Meeting: Conde, Craven. However, as I have no experience with NASA planning meetings, I would like this issue to be discussed by all project participants. It is very important that the GI performs well at these meetings.

Mission initiation conference The purpose of this meeting is for the customer to present his/her requirements and specify the support necessary for the mission. The customer is contacted by the SRPO to establish a mutually acceptable date for the MIC. Attendees include customer representatives and appropriate WFF and NSROC personnel. The meeting is chaired and documented by the SRPO. Topics include: Project Schedule Mechanical Devices and Structural Elements Flight Performance Instrumentation Attitude Control Data Reduction Testing

Data package for MIC 1. Description of scientific objectives and instrumentation. 2. History of the experiment including number of times the experiment or a similar one has flown, giving flight history and any modifications of previously flown payloads. 3. Outline diagram with station numbers including weights, center of gravity, moment of inertia data, deployable elements, doors, booms, nose cones, etc., if available. 4. Structures and Mechanisms a) Payload Structureb) Payload Housing c) Openingsd) Doors e) Booms - Antennasf) Special Mechanisms 5. Outgassing requirements, magnetic material sensitivity, radio frequency interference susceptibility. 6. Time/Altitudes of all experiment related events. 7. Instrumentation – Telemetry a) Power Requiredb) Channels c) Transmitter(s)d) Antenna e) Commutator(s)f) Squib Circuits g) Monitorsh) Aspect Sensors i) Magnetometersj) Accelerometer k) Radar Beaconl) Power 8. Vehicle a) Performanceb) Minimum Altitude Required c) Coning Angle Acceptabled) Despin e) Special Systemsf) Type Nose Cone g) Pointing Requirements 9. Flight qualification/operational status of experiment's subsystems, new flight items or deviation from previously qualified systems. 10. Restrictions, precautions, special requirements, limitations for environmental testing of integrated payload. 11. Range Support a) Telemetry Ground Station b) Tracking Requirements c) Special Ground Support Equipment 12. Launch Conditions a) Launch Rangeb) Time of Day c) Azimuthd) Launch Angle e) Windowf) Special Conditions - Restraints 13. Unique or special range requirements including special checkout or support equipment. (Long lead time items) 14. Radioactive Sources - Payload/Calibration 15. List the minimum and comprehensive vehicle and payload systems and experiment performance and operational requirements which will be used to determine mission success or failure. 16. List of Contacts, Titles, Address, Telephone Numbers.

Additional issues, etc: Final points for today’s meeting: Feel free to raise any additional issues that feel need to be discussed at this meeting… Remember to note any action items requiring input from you. Please think about suitable times for our next team meeting.