Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.

Slides:



Advertisements
Similar presentations
CALIFORNIA ENVIRONMENTAL REPORTING SYSTEM TRAINING FOR BUSINESSES Contra Costa County Hazardous Materials Programs.
Advertisements

Certification of Compliance By Evita Lagard
Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Chapter F.A.C. Updates F. Thomas Lubozynski, P.E. Waste Program Administrator.
DEQ Waste and Remediation Division Programs Michael McCurdy Ground Water and Remediation Section Manager Boise Regional Office.
Openness and Transparency in Local Governments and Smaller Organizations June 5, 2014.
Landfills Geography 12 Kala Renard
CE 326 Principles of Environmental Engineering Prof. Tim Ellis February 4, 2008 Municipal Solid Wastes
The Process of Siting and Approving a New Landfill in Ontario
Our Vision – Healthier Kansans living in safe and sustainable environments.
1 DEBRIS MANAGEMENT OVERVIEW PRESENTER: GREG KELLER, Disaster Recovery Branch Grants Administrator/Public Assistance Officer (614)
Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013 Ohio’s Composting Program Barry Chapman and Jen Hagar.
Resource Conservation and Recovery Act
C&DD Financial Assurance Cost Estimating An introduction to using the FACE tool May 21, 2012, OEPA, SWDO May 31, 2012, OEPA, CO and SEDO June 4, 2012,
1 UNITED CONSULTING Presentation to
Laschone P. Garrison State of Connecticut, Department of Public Health.
Assessing Your School An Environmental Investigation You have been hired by Eagle Environmental, Inc. to perform an Environmental Assessment of South Hunterdon.
Environmental Health and Safety Radiation Control and Radiological Services.
What is RCRA? The Resource Conservation and Recovery Act (RCRA) was passed in 1976 as an amendment to the Solid Waste Disposal Act. Amendments were added.
Solano County Department of Environmental Management Environmental Health Services Division Hazardous Materials.
Subchapter III: Company Certification Requirements.
1 | Weatherization Assistance Programeere.energy.gov Eric Bell 1 Federal/State Monitoring 2010 Orientation for State WAP Directors and Staff.
January Goals: Streamline permitting process for certain solid waste facilities and activities Expand use of 3 rd party inspectors to allow MassDEP.
NEW DOT SECURITY REGULATIONS Russell S. Hanson Peter C. Ashbrook U of Missouri-Columbia November 13, 2003.
After the Sanitary Survey
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
RCRA 101 Michael Gage New Jersey Department of Environmental Protection County Environmental and Waste Enforcement Special Investigations and Oversight.
Tier II: Module 1C CERCLA 128(a): Tribal Response Program.
Construction and Demolition Inert Processing Operations Compliance First: Evaluation of Solid Waste Facilities’ State Standards Training Provided By: California.
Title VI- Stratospheric Ozone Compliance Training
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
EnE 301: ENVIRONMENTAL ENGINEERING
Waste Management Overview & Land Disposal Restrictions.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Coal Combustion Residuals Final Regulation August 19, 2015 Frank Ney U.S. Environmental Protection Agency – Region 4.
SUMMARY OF INFORMAL COMMENTS Temporary Waiver of Terms Regulations May 2006.
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
David Dippel, P.G. Frank Zeng, P.E. Waste Permits Division Municipal Solid Waste Permits Section 2015 TCEQ Environmental Trade Fair.
Aloe Vera of America: A Quality IASC-Certified Producer of Aloe Vera Presented by Walt Jones.
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
October Mary Louise Hendrickson Solid Waste Section – Technical Lead
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Inspection Directions: An EMS Approach to Inspecting for Section 608 and 609 Compliance.
Regulatory Framework for Uranium Production Facilities in the U.S.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
PowerSouth Energy Cooperative:
NEW PHOSTOXIN LABELING
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
Landfill Odor Action Plan Utilities Department October 6,
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
PRESENTED BY DATE CATEGORY C COVER TRIAL EMP and Monitoring Procedures Stephanie Salinas19 March,
California Integrated Waste Management Board 1 Committee Items C-D (Board Items 2-3) November 5, 2007 Consideration Of: Item C/2: The Scope Of Work For.
Item 21 May 11-12, 2004 CIWMB Meeting Discussion And Request For Rulemaking Direction To Formally Notice Proposed Regulations For RCRA Subtitle D Program.
UnionPay Card Manufacturer Certification Introduction.
NJDOE Testing for Lead in School Drinking Water
Department of Environmental Quality
New Licensing and Renewal Requirements
EPA Options for the Federal Regulation of Coal Combustion Waste Lisa Evans Earthjustice October 22, 2010.
Numfon Eaktasang ,Ph.D Thammasat University
Global Connections Day Building Safety Service Provider
Asbestos NESHAP Inspection and Safety Procedures Course
Changes to Chapter , Florida Administrative Code Underground Storage Tank Systems (USTs) Effective – 1/11/2017.
Solano County Department of Environmental Management Environmental Health Services Division Hazardous Materials.
Van Wert, OH Water and Wastewater Element Training
Municipal Solid Wastes (continued)
Municipal Solid Wastes
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
Closure and Post-Closure
Presentation transcript:

Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality

Required Documentation

All Facilities Site Application Site Application Design Application Design Application Operations Plan Operations Plan Closure Plan Closure Plan Post-Closure Plan Post-Closure Plan Certifications Certifications Monitoring Monitoring Inspections Inspections Special Wastes Special Wastes Deed Notation Deed Notation Variances Variances

Municipal Solid Waste Landfills Site Certification Site Certification FAA notification FAA notification Floodplain demonstration Floodplain demonstration Seismic impact zone demonstration Seismic impact zone demonstration Unstable areas demonstration Unstable areas demonstration State Notifications State Notifications Receipt of unauthorized hazardous wastes Receipt of unauthorized hazardous wastes Explosive gas Explosive gas

Municipal Solid Waste Landfills Explosive Gas Explosive Gas Monitoring Monitoring Exceedances Exceedances Steps taken to protect human heath Steps taken to protect human heath Remediation plan Remediation plan Liquids Exemption - Leachate Placement Liquids Exemption - Leachate Placement

Municipal Solid Waste Landfills Groundwater Monitoring Groundwater Monitoring Well design, installation, development & decommissioning Well design, installation, development & decommissioning Sampling & analysis plans Sampling & analysis plans Statistical method Statistical method Data Data Contaminant exceedances Contaminant exceedances

Municipal Solid Waste Landfills Daily Climatic Conditions Daily Climatic Conditions Waste Receipts & Characterization Waste Receipts & Characterization Random Inspections Random Inspections Financial Assurance Financial Assurance

Financial Assurance Detailed written estimate of cost to hire a third party to close the largest part ever open Detailed written estimate of cost to hire a third party to close the largest part ever open Detailed written estimate of cost to hire a third party to conduct post-closure care Detailed written estimate of cost to hire a third party to conduct post-closure care

Municipal Solid Waste Landfills Closure Plan Closure Plan Notice of intent to close Notice of intent to close Closure certification Closure certification Deed notation Deed notation Post-Closure Plan Post-Closure Plan Small Community Exemption Small Community Exemption

Nonmunicipal Solid Waste Landfills Daily Log Daily Log Unauthorized Waste Plan Unauthorized Waste Plan

Special Wastes Asbestos Asbestos Refrigeration Units Refrigeration Units Diseased Animals Diseased Animals Petroleum Contaminated Soils Petroleum Contaminated Soils

Asbestos NESHAP (40 CFR ) NESHAP (40 CFR ) For all asbestos-containing waste material received, the owner or operator of the active waste disposal site shall: For all asbestos-containing waste material received, the owner or operator of the active waste disposal site shall: Maintain waste shipment records for at least 2 years Maintain waste shipment records for at least 2 years Maintain, until closure, records of the location, depth and area, and quantity in cubic yards of asbestos-containing waste material within the disposal site on a map or diagram of the disposal area Maintain, until closure, records of the location, depth and area, and quantity in cubic yards of asbestos-containing waste material within the disposal site on a map or diagram of the disposal area Notify EPA in writing at least 45 days prior to excavating or otherwise disturbing any asbestos-containing waste material that has been deposited at a waste disposal site and is covered Notify EPA in writing at least 45 days prior to excavating or otherwise disturbing any asbestos-containing waste material that has been deposited at a waste disposal site and is covered Document the location of any temporary storage site and the final disposal site Document the location of any temporary storage site and the final disposal site

Refrigerant CAA Section 608 (40 CFR ) CAA Section 608 (40 CFR ) Certified recovery equipment Certified recovery equipment Verify that the refrigerant has been evacuated from the appliance or shipment of appliances previously, including a signed statement from the person from whom the appliance or shipment of appliances is obtained that all refrigerant that had not leaked previously has been recovered from the appliance. This statement must include the name and address of the person who recovered the refrigerant and the date the refrigerant was recovered or a contract that refrigerant will be removed prior to delivery. Verify that the refrigerant has been evacuated from the appliance or shipment of appliances previously, including a signed statement from the person from whom the appliance or shipment of appliances is obtained that all refrigerant that had not leaked previously has been recovered from the appliance. This statement must include the name and address of the person who recovered the refrigerant and the date the refrigerant was recovered or a contract that refrigerant will be removed prior to delivery.

Recommended Documentation

All Facilities Training Records Training Records Emergency Plan & Contact Information Emergency Plan & Contact Information Expanded Plan of Operations Expanded Plan of Operations

All Facilities Journal Journal Fires Fires Equipment failures, inclement weather, staff shortage Equipment failures, inclement weather, staff shortage Walk-downs, inspections, monitoring events, meetings, training Walk-downs, inspections, monitoring events, meetings, training Collection activities Collection activities Cover application Cover application Vector control Vector control Litter collection Litter collection Unauthorized wastes Unauthorized wastes Any deviation from approved plan of operations Any deviation from approved plan of operations

Questions?