Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.

Slides:



Advertisements
Similar presentations
Tam Valley School Modernization - Phase 1 Summer 2011.
Advertisements

1 Zero Tax Increase Referendum: Community Information Session.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Cathedral of the Immaculate Conception Project Information Session.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
SUNY Canton Facilities Project Update Miscellaneous.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
U-M Construction Forecast; April 2013 U-M Construction Forecast Spring – Fall 2013 As of April 25, 2013 Prepared by AEC Preliminary & Advisory.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
Riverside Community Schools Overview of Summer Maintenance Projects.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Renovating a Foreclosed Property versus Buying Prime Real-estate Jonathan Lee,Jimmy Luong,Vincent Rodriguez, Bryan Vine Team #5.
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Building Plans.
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
Faculty Meeting Monday, April 4, Deferred Maintenance.
NOW, to what we have already achieved… We have a new roof on sanctuary and ground work to prevent prior water issues…..
Sinking Fund Millage Renewal Election- May 7, 2013.
Zero Energy Home’s Features and Appliances Interior and Exterior Features: Roofing Insulation Windows Energy Saving Appliances.
BRVFD & RS Training Facility Proposal 05/07/2009.
GATEWAYS FACILITIES – THE “JOURNEY” 1. Agenda 1.Facilities Presentation and Purpose – Where we’ve been – Progress this year – A recommendation for your.
BEFORE AFTER SHANKLIN – PARAPET RESTORATION FY 15 Before and After SHANKLIN – PARAPET RESTORATION.
The IARC Complex Annual Upkeep Estimated Cost Window cleaningLabor costs for contractor to clean interior and exterior surfaces of glass at the OTE building.
Capital Improvement Program for September 9, 2014.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
Learning, Health, and Safety Capital Project Alternates and Change Order
1. 2 CES, MBE, GLE Replace ACM soffit – CT/CMPL SMS GLE, MBE, CES Replace Stage Rigging and Lighting (ACM wiring) CMPL CHS and SMS Brick masonry improvements.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
South Greenville Recreation Center and Park Master Plan.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Will Rogers Memorial Center Multi-Purpose Building & Public Events Infrastructure Maintenance City Council Presentation January 26, 2010.
Stone Avenue Train Station Renovation Project Board Workshop June 7, 2010.
Entrance/Exit onto West Grand Avenue 1 st Church of the Nazarene is the completed building at the top of the picture.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
TCF Volunteers Conference COL G. Dewey Yeatts, Ed.D. Vice President for Facilities and Engineering 25 February 2012.
St Martin’s Projects “Welcomes you to know Christ and to make Him known” Renovation, Refurbishment & Maintenance Rectory Bathroom and study.
White Pigeon Community Schools
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Presentation Overview
Capital Improvements Presentation
Dr. Joseph Meloche Superintendent of Schools Mrs
Sneed Property th Ave E, Puyallup Exterior of House
Facilities Report to the Buffalo State College Senate May 6, 2016
Progress Report 11/10/11.
The summer of 2018 and all the work that has taken place
Mission Trip 2018 Aransas Pass Texas
Cathedral of the Immaculate Conception
Cathedral of the Immaculate Conception
Capital Outlay Workshop
Community Life at St. Giles
Facility Advisory Committee Meeting
RPC Renovation and Addition
Park Place Wesleyan Gala 2019
Blue Ribbon Committee Summary Report
Proposed Facility Capital Project List
Phase II Committee Forrest Barber Johnny Davis Mike Hannon Brandon Harwood Kelly McKay Jim McCoy Becky Roberts.
The projects in the following pages have been identified by our Building & Grounds Commission made up of local architects, engineers, contractors and finance.
Stoughton Public Library
Community Practice Asset Management.
Presentation transcript:

Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015

West Parking Lot Resurface & Repair Including Concrete $80,000

Sanctuary Chapel Replace & Modify Window unit $25,000

Fellowship Hall Replace & Modify Window unit $25,000

Activity Center Roof Replace Roof $85,000

North Wing & 2 nd Floor Soffit and Fascia Repair and Seal Fascia $32,000

Mower Replacement Mower needs to be replaced $15,000

North Wing – East Windows Windows are In need of Replacement $30,000

Sanctuary Windows Interior and Exterior Windows are in need of repair & Replacement $55,000

Sanctuary Brick Work Replace and reset bricks and address the rust problem on the north end of the Sanctuary $8,000

Windows in Balcony Stairwell Repair or Replace the single-pane windows in the balcony stairwell $5,000

Sanctuary Air Conditioning Air conditioning unit will need to be replaced soon. $50,000

Ceiling Tiles Replace and standardize ceiling tiles throughout entire facility $8,000

Main Parking Lot Reseal and maintain main parking lot $30,000

Student Restrooms Modernize & renovate main level student restrooms $100,000

Activity Center Repair and paint Ceiling and walls $30,000

Activity Center Repair and paint ceiling and walls (continued) $30,000

Activity Center Restrooms Modernize and renovate restrooms and locker rooms $75,000

Activity Center Kitchen Replace dishwasher and stoves $9,000

Trinity Hall Ceiling Replace and standardize ceiling tiles $3,000

Trinity Hall Floor Resurface floor $30,000

Trinity Hall Replace stove, dishwasher, washer and dryer $7,000

South Sidewalk Remove south sidewalk $3,000

Summary Total 5 year Cost: $700,000 Annual Cost: $140,000 Average giving to Building Projects Fund over the past 5 years: $33k / year Estimated Gap of $107,000/ year for the next 5 years

Questions? Comments?