Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Test process essentials Riitta Viitamäki,
Chapter 1 Business Driven Technology
Test Automation Success: Choosing the Right People & Process
Information Resources Management January 23, 2001.
Project What is a project A temporary endeavor undertaken to create a unique product, service or result.
INDUSTRIAL & SYSTEMS ENGINEERING
SIM5102 Software Evaluation
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
The Analyst as a Project Manager
Project Management and MS Project. The project management triangle: Time Resources Scope.
©© 2013 SAP AG. All rights reserved. Scenario/Processes Make-to-Stock Scenario Overview Planning Supply Initiating Production Executing Production Processing.
Project Risk Management Risk Mitigation. Risk Management  The prime objective of risk management is to minimize the impact and probability of the occurrence.
The Premier Software Usage Analysis and Reporting Toolset Maximizing Value for Software Users.
HIT241 - COST MANAGEMENT Introduction
Creating Business Impact | Providing Expert Solutions | Delivering Quality Consistently | Building Partnerships Globally Presented by: Vidyalankar Nidamarthy.
System Implementation
Cost Management Week 6-7 Learning Objectives
What is Business Analysis Planning & Monitoring?
CS 4310: Software Engineering
Introduction to Systems Analysis and Design Trisha Cummings.
S/W Project Management
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
IT Project Management Cheng Li, Ph.D. August 2003.
Fleet Performance and Reliability in Generation Utilities
1 SYS366 Week 3 Lecture 1 Introduction to Requirements Gathering: Part 1.
Produced by: Integrated Asset Planning for Nuclear Power Plants Matt Kohal Southern California Edison.
Testing Challenges in an Agile Environment Biraj Nakarja Sogeti UK 28 th October 2009.
Software Estimation and Function Point Analysis Presented by Craig Myers MBA 731 November 12, 2007.
IT Requirements Management Balancing Needs and Expectations.
Testing Workflow In the Unified Process and Agile/Scrum processes.
This chapter is extracted from Sommerville’s slides. Text book chapter
Software Project Management (SPM)
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
SECTION 1 THE PROJECT MANAGEMENT FRAMEWORK
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
UKSMA 2005 Lessons Learnt from introducing IT Measurement Peter Thomas –
© Copyright 2011 John Wiley & Sons, Inc.
Using Franchise Inventory Tracking System (FITS) Better Pipeline Management & Development Forecasting.
Pre-Project Components
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
1 Chapter 3 1.Quality Management, 2.Software Cost Estimation 3.Process Improvement.
Project Portfolio Management Business Priorities Presentation.
Project Management Cross lifecycle Activity
MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.
Industry Goals. Increase Customer Satisfaction  On-Time, On-Budget, Within Scope  Ensure High Quality Delivery Increase Margins  Drive Efficiencies.
Fundamentals of Information Systems, Third Edition1 An Overview of Transaction Processing Systems Every organization has transaction processing systems.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
© Michael Crosby and Charles Sacker, 2001 Systematic Software Reviews Software reviews are a “quality improvement process for written material”.
Introduction to System Analysis and Design MADE BY: SIR NASEEM AHMED KHAN DOW VOCATIONAL & TECHNICAL TRAINING CENTRE.
Session 3: Data: Overview, Analysis, and Presentation Demand Forecasting and Planning in Crisis July, Shanghai Joseph Ogrodowczyk, Ph.D.
What is a software? Computer Software, or just Software, is the collection of computer programs and related data that provide the instructions telling.
by: Er. Manu Bansal Deptt of IT Software Quality Assurance.
Business and Systems Aligned. Business Empowered. TM Global ERP Projects Author:Andrew McCumiskey Presentation for:University of Birmingham Course: Commercial.
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
Chapter 11 Project Management.
Project Cost Management
Make-to-Stock Scenario Overview
Systems Analysis and Design in a Changing World, 4th Edition
Project Integration Management
Make-to-Stock Scenario Overview
Project Management.
Chapter 7: Project Cost Management
Product Development Scenario Overview
Chapter 13 Quality Management
CAD DESK PRIMAVERA PRESENTATION.
Managing Project Work, Scope, Schedules, and Cost
Chapter 7: Project Cost Management
UML Design for an Automated Registration System
Driving Successful Projects
Presentation transcript:

Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation

Hard Dollar Corporate Objectives Slide 2 Leading PCM solution 100% customer success The “Southwest Airlines” of software employers Fast Growing HD CUSTOMERS BY INDUSTRY

“Future Man” Predicts… No offense Future Man but do you have all your marbles?

Uni Planning/ Design Estimating SchedulingProgress Finance 4 Unified Visibility - Control

The Reality…Now Direct Causes of Failure Errors or oversights in the planning and preparation phase Indirect Causes of Technical Failure Inadequate execution of operation and maintenance

Planning/ Design Numerous Take Off Systems Spreadsheet Output Lack of Change Support in Real Time 6 Unified Visibility - Control

Estimate Centralized History Lack of Detail Integration to Schedule “Norms” Data Dependency on Spreadsheet 7 Unified Visibility - Control

Schedule % Complete – Lack of Quantity Information Disconnected from Progress and Estimating Tools CPI not included Scheduled work varies from how the work was estimated 8 Unified Visibility - Control

Progress Disconnect from Finance Level of Detail not Matched with Plan and Reported in Finance Discipline of Collection % Complete Guess vs. Actual Quantities 9 Unified Visibility - Control

Finance Manual Reconciliation to Estimate Origin Level of Detail not Matched with Plan Cash Flow Calculations Resource Ties Accrued Earned Calculations 10 Unified Visibility - Control

Is it possible to manage the unplanned? Use historical data for agile planning? Use ‘What if?’ scenarios on the fly? The Future is…Predictable?

The Future Lies in History Slide 12

Where did the Number come from? 13 Proprietary & Confidential

Common Failures by Stages Setting goals Unclear description of STO goals Planning Procedures not easy to follow or up-to-date Tools are incorrectly specified Improper technical skills requirements Unclear or incomplete work orders

Common Failures by Stages Execution Inadequate failure diagnosis Failures not detected during testing or inspection Bad on-site load measurement Inadequate quality control of executed work Delayed installation of component Installation of wrong or damaged components Ignored maintenance

Common Failures by Stages Reporting Bad cause description Data Analyses Inadequate utilization of company internal data Inadequate exchange of reliability data between operating companies Improvements No improvements suggested at all Insufficient quality on suggestions

Global spending in 2011 on oil & gas STO services will total $13.17bn. Predicting the Present Source: visiongain $676 Million+ at Risk

Audited Spreadsheet Errors Audits done shows that nearly 90% of the spreadsheets contained serious errors The average cell error rates (the ratio of cells with errors to all cells with formulas) is 5.2% Source

This Formula Has Legs Slide 19 E = 1 – (1 – e) n

Dilution in the Culture “Evidence shows that most downstream and midstream operators…leave 3% to 5% of potential cost-reduction savings on the table annually because addressing them requires a change in organizational behavior and business culture.” Source: Alex Buehler, The Marshall-Teichert Group, Minneapolis, Minn. November 2010 edition of OIL & GAS FINANCIAL JOURNAL

Is Software Used to Schedule the Project? Case Study on STO on 44 Projects

Case Study on STO Is Pre-task Planning a Regular Part of Project Planning?

Where do the Workers Come From? Slide 23

Duration of Project Slide 24

Industry Experts Know… An acceptable range of error for a detailed work order scope is of about 10% When work orders are "guesstimated" without any detail, the degree of error is very high. The error range could span from 25% up to 60% and more.

Cascading KPIs “How can we get by with one less water hauling truck this week?” or… Source: Alex Buehler, The Marshall-Teichert Group, Minneapolis, Minn. November 2010 edition of OIL & GAS FINANCIAL JOURNAL …“How can we provide enough information about a maintenance need to ensure the instrumentation technician arrives onsite with the correct parts and tools?””

Characteristics of Credible Cost Planning Clear Identification of Task Broad Participation in Preparation Availability of Valid Data Standardized Structure For Estimate Standardized Structure For Estimate Provision for Program Uncertainties Provision for Program Uncertainties Recognition of Inflation Recognition of Excluded Costs Independent Review Of Estimates Independent Review Of Estimates

Layout project needs with the Cost Breakdown Schedule (CBS) Create task templates, norms, standardized coding, and work packages 1. Plan Slide 28 Plan

Rate Storage Slide 29 Store Re-Usable Updated Rates Store Re-Usable Updated Rates

Assembly Storage Slide 30 Standardize Crew Make Up And other Assembly Like Resources Standardize Crew Make Up And other Assembly Like Resources

Norms Database Storage Slide 31 Build Best Practice History to Draw Durations Build Best Practice History to Draw Durations

Planning Slide 32 Allow for Flexibility in Scope Allow for Flexibility in Scope

Create cost and resource loaded schedules Dynamically link with Oracle’s Primavera (P6) or Microsoft Project 2. Schedule Slide 33 PlanSchedule

Estimating Slide 34

Scheduling Slide 35 What If Scenarios, Changes, Resource- Productivity Consequences What If Scenarios, Changes, Resource- Productivity Consequences

Track the actual data vs. projected data Use actual performance factors to drive accurate forecasts Cost visibility from start to finish Automated change tracking Team collaboration and updates 3. Execute Slide 36 PlanScheduleExecute

Analyze trends and get alerts to successfully resolve issues Access web-based HD Projectfacts for instant reports Save full historical data for future use 4. Complete & Analyze Slide 37 PlanScheduleExecute Complete & Analyze

Spreadsheet Virus Slide 38

A Formula for Bad PI / Pie Slide 39 Audits done shows that nearly 90% of the spreadsheets contained serious errors Even experienced users succeed in only finding 54% on average Results show that 94% of spreadsheets have errors and that the average cell error rates (the ratio of cells with errors to all cells with formulas) is 5.2% Source:

A Small Error Slide 40

A Small Error Slide 41

Scope (History) Schedule (Resources) Cost / Productivity Avoiding Mistakes Slide 42

Produced by: Ron Babich, Vice President Hard Dollar Corporation