Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) 595-7674,

Slides:



Advertisements
Similar presentations
Federal Reserve Bank of Boston Case Study
Advertisements

High Performance Buildings Congressional Caucus Coalition April 11, 2012 Washington, DC Bruce D. Hunn ASHRAE.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
Overview of Collected Integrated Chiller Retrofit Case Studies Dr. Lisa Gartland (510) ,
Make the most of your energy Head Office – Case Study.
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
The Three Tiered Philosophy
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
Energy Efficient Operations: Giving facility operators the tools to optimize building performance The B3 Energy Efficient Operations Manual Garrett Mosiman.
Alabama Department of Economic and Community Affairs.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Franklin County Technical School Performance Contract Project.
Integrated Retrofits for Federal Projects Dr. Lisa Gartland.
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Environmental System Science November 18, 2009 Identifying Energy Conservation Measures. Tailoring Retro-commissioning to meet your needs.
Performance Contracting The Honeywell One Source Solution.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Concept of Energy Efficiency. Buildings, as they are designed and used, contribute to serious environmental problems because of excessive consumption.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
How to reduce your carbon footprint! By Tiffany Bulson Reduce, Reuse & Recycle.
Energy Conservation Western North Carolina Recycler’s Networking Council Black Mountain, North Carolina December 9, 2004 Keyes McGee, E.I. North Carolina.
Hawke’s Bay Refrigeration
Green Building Demonstration Project Adam Saling City of San Diego.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
GREEN FIEND ENERGY & ENVIRONMENT Energy Conservation.
Name of Building(s) or Project Speaker(s) Organization(s)
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
International Newspaper Group 2008 Gannett’s Green Campaign.
Marriott Corporate Headquarters
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
How Facilities Can Help Commitment by facilities director Facilities energy committee Energy officer position Include conservation commitment in: Strategic.
Week 12 Overview of equipment and building envelope as part of the energy audit.
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
Energy Services Harsha Holalu Ramakrishna Energy Extension Specialist Department of Mechanical and Aerospace Engineering.
Week 9 Common Commercial Building energy efficiency measures (Energy Management Opportunities)
Session 14 & 15 Lab Exercises. Assessing and working with data in the model – Instructor’s presentation What are the top five areas of focus for applying.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Lecture Objectives: Analyze several modeling problems –Examples from the final project list Economizer Solar collectors Phase change thermal storage materials.
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
Energy Conservation Building Upgrades Alma School District.
Energy Conservation What are the Society’s Conservation Goals: GOAL #1: 20% Portfolio Energy Reduction by 2020 GOAL #2: 20% Portfolio Water Reduction by.
Robert Greenwald, P.Eng, MBA February 26, 2004
Part 16 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Fort Stanwix National Monument Energy Audit Contract
The Data Center Challenge
Lecture Objectives: Discuss Final Project
Implementing Effective Energy O&M Strategies on a Limited Budget
The ESCO Retrofit Model Financing energy efficient HVAC improvements through ESCOs Stephane le Gentil - November 2017.
United Technologies Sr. Fellow
Trane Care Energy RTHD Adaptive Frequency Drive retrofit.
Energy Saving Concepts and Opportunities in Foundry (A case Study)
2018 Retro-Commissioning (RCx) Program
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Presentation transcript:

Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,

Why an Integrated Chiller & Building Retrofit? Turn the necessity of coping with CFC phaseouts into an opportunity for –Energy & Cost Savings –More Efficient Building Operations –Improved Environmental Sustainability –Increased Comfort and Productivity –Increased Asset Value

What is an Integrated Chiller & Building Retrofit? Combines –building system and load improvements/retrofits –chiller replacement or retrofit for CFC conversion Systems approach for comprehensive building analysis –solves building problems –saves energy and money –finances chiller replacement with other measures –deals with CFC issues –avoids lost opportunities

Steps to an Integrated Approach Find operations & maintenance opportunities Look for building load reductions Use low or no-energy HVAC systems Introduce high-efficiency equipment Improve control systems Properly commission the systems

Operation & Maintenance Opportunities Audit to find efficiency opportunities –Check equipment condition and function –Evaluate operating schedules –Evaluate temperature setpoints –Evaluate problems Typical energy savings due to O&M improvements is 10% or more

Reduce Building Loads Building envelope –insulation, glazing, outside surface reflectivities Lighting loads –high efficiency lighting, daylighting, controls Plug loads –appliances and their use schedules Watch out for load assumptions –measure, don’t assume!

Low or No-Energy HVAC Systems Cooling with economizers Direct & indirect evaporative cooling Heat recovery Natural ventilation Thermal Storage

High Efficiency HVAC Equipment Energy-efficient equipment –Variable Speed Drives –Coils –Motors –Low kW/ton chillers Avoid oversizing equipment!! –especially chillers –saves initial and lifetime costs

Improve Control Systems Must be properly commissioned and used Get training over an extended time period Get manuals specific to your system Periodically re-evaluate use of control systems

Commission the Systems Save time, energy, aggravation, and even litigation over the building lifetime –Pre-functional testing –Functional testing of systems –Training, manuals –Re-commission older systems if needed

Chicago Office Building Example Project Context CFC refrigerants in existing chillers Desire to reduce utility bills Comfort complaints, “not enough air” Perceived need to purchase new 200 ton chiller 203 North LaSalle Street Project Team: Sieben Energy Associates, E-Cube, M&J Wilkow, ComEd

Chicago Office Building Example Project Steps Audit Implementation –low & no-cost measures implemented first Results –Operational –Financial –Non-financial

Chicago Office Building Example Building Load and System Improvements Even without chiller replacement –Air supply problems resolved –Reduced chiller operation –Hot and cold complaints minimized

Chicago Office Building Example Future Opportunities No supplemental chiller needed –Avoided costs of $200,000 by making building load and system improvements Potential to reduce chiller capacity in combination with building retrofits Replacement and/or retrofit of chiller for CFC compliance

Integrated Retrofit Challenges Integrated retrofits take more effort than simple chiller retrofits or replacements Extra time needed –to study existing conditions –to evaluate design options –to construct & coordinate systems Extra financing needed –more up front capital or more project paperwork and contracts

Results of the Integrated Approach Energy and money saved from building system and load improvements Smaller chiller needed New, more efficient chillers add to savings Chiller work can be financed by measures with shorter payback periods Building operation and maintenance improved Building comfort and asset value enhanced