Ben Caya Carl Czajka 5th Update
Ordered and Received Kettle – Ordered Valves – In Thermometers - In
Free and Received Ordered Working on donation
o Gas piping o Bolt on Pumps (bracket already welded in) o Pump wiring Central power Wire switch o Weld on castors o Weld on propane tank holder o Brew Beer
WBSTasks Task Lead StartEnd Duration (Days) % Complete Working Days Days Complete Days Remaining 23 - Jan Jan Feb Feb Feb Feb Mar Mar Mar Mar Apr Initialize Project 1/23/122/15/123100% Partner Assign 1/23/121/24/122100% Choose Project 1/23/121/25/123100%330 2 VOC and Design Requirments 2/16/122/29/ % HBT Design Pole 2/16/122/22/127100% Design Requirments 2/16/122/18/123100% Bi-Weekly Report #1 2/25/122/29/125100% Oral Presentation #1 2/25/122/29/125100%350 3 VOC and Design Requirments 2/16/122/29/ % HBT Design Pole 2/16/122/22/127100% Design Requirments 2/16/122/18/123100% Bi-Weekly Report #2 2/25/122/29/125100% Oral Presentation #2 2/25/122/29/125100%350 4 Design Selection 3/01/123/14/121477% Select Design 3/01/123/04/124100% CAD Models 3/04/123/10/127100% FEA Analysis 3/10/123/14/1250% Bi-Weekly Report #3 3/12/123/14/123100% Oral Presentation #3 3/12/123/14/123100%330 5 Manufacturing Design 3/15/124/04/122136% Parts List 3/15/123/19/12590% Order Parts 3/19/123/21/12330% Steel for Frame 3/19/123/25/127100% Heating 3/19/123/25/1270% Burners 3/19/123/25/1270% Piping 3/19/123/25/1270% Pilot Lighting 3/19/123/25/1270% Pumps (2) 2/27/123/27/123025% Hoses for Pumps 3/19/123/25/1270% Valves 3/19/123/25/127100% Kettles 3/19/123/25/127100% Thermometers 3/19/123/25/127100% Heat Exhanger 3/19/123/25/1270% Castors 3/19/123/25/1270% Frame and Accessory Assembly 4/01/124/04/12430% Bi-Weekly Report #4 4/02/124/04/123100% Oral Presentation #4 4/02/124/04/123100%330