Ben Caya Carl Czajka 5th Update. Ordered and Received Kettle – Ordered Valves – In Thermometers - In.

Slides:



Advertisements
Similar presentations
HOT & COLD WATER SYSTEMS
Advertisements

Mini 24 Presents the new. Wall-hung boiler Self diagnostic system Electronic thermometer Furnace type: open Output power: 22,66 kW Min. 6,7 kW Stars of.
 1) The front coach lights are controlled by the photo switch.  2) Water heater breaker is labeled.
Welding Vigyan Ashram, Pabal.
Helitorch, Batchmixer and Modular Mix Transfer Components.
Aim of presentation: to teach people how to use a Bunsen burner safely and how to use it properly!
Bellwork TRUE/FALSE concerning Lab Safety: If a student drops an alcohol thermometer, they should stop, drop, and roll.
- Flexible Hoses- Ring Housing - Nitrogen Tank-Collection Cylinder - High Pressure Water Tank- Flow meter - Gas Regulator- Water Filter - Pressure.
1 Brakes - 1 Brakes - 1 Mr. Lombardi. 2 Brakes  Modern automotive brake systems use hydraulic force to create friction  Convert motion to heat energy.
P.R.P.F Pimp Russ’ Portable Foundry Project Advisor: Russ Rosmait Chase Butcher Cody Haddock Mike Verren 5/27/07.
Ben Caya Carl Czajka Milwaukee’s Best Brew Stand.
Harnessing Free Heat. The Energy Harness provides hot water using multiple heat sources, making the best use of low grade heat. It improves the efficiency.
Colby Meyer Dan Smyth Kirsten Kozlovsky Chassis PDR 10.
OIL & GAS FIELD SUPPLIES DIVISION Oil & Gas Field Supplies Division deals in supply of Gate Valves, Ball Valves, Butterfly Valves, Control Valves, Check.
What do the 5 clips have in common? Pneumatics. Pneumatics njuːˈmætɪks Branch in Physics Using the energy of compressed gas (e.g. air) Producing motion.
TEAM 12: Low-Cost, Portable, Off-Grid Biodiesel Production Plant Team Members: James Black Sam Dresser Joey Kilmer Matt Mills Faculty Advisor: Dr. Dave.
1 CXS490 - Pre-Engineered Fire Protection Systems Off-Road Vehicle Systems.
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
…………………………………………………………………………………………………………………………………… Lee Hun Joong Shin Kyoung Seung.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Student Handout Packet – Page A7
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
BUrners TRAining CEntre GAS BURNERS N 120, 200, 400 N 120, 200, 400 series.
Quality Assurance Update. 2014/15 Understanding Standards EventsRound 1 NotificationRound 1 UpliftRound 2 Notification – Visiting VerificationRound.
LCD Wiring Diagram Presentation B / B.
Engine Disassembly manual. Oil plugs/ 10 mm wrench.
Temperature Measurement. List methods of temperature measurement / equipment.
Blichmann Catalog Blichmann sets the standard for quality and innovation in the home brewing industry. All sales are final. Cost includes shipping but.
Unit 13 Oil-Burning Equipment
Front End Test Stand (F.E.T.S.)
SPOUSE LEADERSHIP DEVELOPMENT COURSE (SLDC) CLASS 68
Jan 2016 Solar Lunar Data.
Milwaukee’s Best Brew Stand
Technical Coordination Parallel Session November 2011, FNAL
IT Strategy Roadmap Template
Organization Chart Part II.
Module 3 Domestic Heating/MMA Welding
ScaleBuster Installation Guide
Average Monthly Temperature and Rainfall
New Pumps Improvement of the pump performance Type: Profi.
Measure Hose as 14”, 12.5”, 12.25”, 9” & cut it.

GANTT CHARTS Example Text Text Here Text Here Text Here Text Here
Sarah Shoemaker Structures Group Internal Structures, CAD
Wire Wrap Pipe Base Well Screens. Pipe Based Well Screens.
MAINTENANCE TRAINING SCHEDULE
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Free PPT Diagrams : ALLPPT.com
Electric Potential.
2015 Business Power Point Template.

01 DRAW YOUR TIMELINE HERE JAN. MAR. JAN. MAR. FEB. APR. FEB. APR.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Valve stem “gag” mechanism
Text for section 1 1 Text for section 2 2 Text for section 3 3
Free PPT Diagrams : ALLPPT.com
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Pole Position Student Points Time
A B C D.
Presentation transcript:

Ben Caya Carl Czajka 5th Update

Ordered and Received Kettle – Ordered Valves – In Thermometers - In

Free and Received Ordered Working on donation

o Gas piping o Bolt on Pumps (bracket already welded in) o Pump wiring Central power Wire switch o Weld on castors o Weld on propane tank holder o Brew Beer

WBSTasks Task Lead StartEnd Duration (Days) % Complete Working Days Days Complete Days Remaining 23 - Jan Jan Feb Feb Feb Feb Mar Mar Mar Mar Apr Initialize Project 1/23/122/15/123100% Partner Assign 1/23/121/24/122100% Choose Project 1/23/121/25/123100%330 2 VOC and Design Requirments 2/16/122/29/ % HBT Design Pole 2/16/122/22/127100% Design Requirments 2/16/122/18/123100% Bi-Weekly Report #1 2/25/122/29/125100% Oral Presentation #1 2/25/122/29/125100%350 3 VOC and Design Requirments 2/16/122/29/ % HBT Design Pole 2/16/122/22/127100% Design Requirments 2/16/122/18/123100% Bi-Weekly Report #2 2/25/122/29/125100% Oral Presentation #2 2/25/122/29/125100%350 4 Design Selection 3/01/123/14/121477% Select Design 3/01/123/04/124100% CAD Models 3/04/123/10/127100% FEA Analysis 3/10/123/14/1250% Bi-Weekly Report #3 3/12/123/14/123100% Oral Presentation #3 3/12/123/14/123100%330 5 Manufacturing Design 3/15/124/04/122136% Parts List 3/15/123/19/12590% Order Parts 3/19/123/21/12330% Steel for Frame 3/19/123/25/127100% Heating 3/19/123/25/1270% Burners 3/19/123/25/1270% Piping 3/19/123/25/1270% Pilot Lighting 3/19/123/25/1270% Pumps (2) 2/27/123/27/123025% Hoses for Pumps 3/19/123/25/1270% Valves 3/19/123/25/127100% Kettles 3/19/123/25/127100% Thermometers 3/19/123/25/127100% Heat Exhanger 3/19/123/25/1270% Castors 3/19/123/25/1270% Frame and Accessory Assembly 4/01/124/04/12430% Bi-Weekly Report #4 4/02/124/04/123100% Oral Presentation #4 4/02/124/04/123100%330