PROPERTY MANAGEMENT RAZE & REMOVAL. PROPERTY OWNER HAS FIRST RIGHT OF REFUSAL n The property owner has first right of refusal to retain and move their.

Slides:



Advertisements
Similar presentations
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Advertisements

Special Recognition Cheryl Wilson, State Auditor and Inspectors Office Presented by Ann Embree and Sherri Schieffer County Training Program and Oklahoma.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
1 FALL 2010 ASBO CONFERENCE
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
U.S. General Services Administration GSA Auctions ®: A Federal Asset Sales Sales Center Federal Acquisition Services Candice Waddles GSA Sales Ph:
District 3: Patty Bartlett (Logan), Bob Sagel (Morgan), Linda Statz (Phillips), Wanda Lowery (Sedgwick)
Neighborhood Stabilization Program (NSP) Orange County, Florida.
Snow and Ice Maintenance Tenders and Contract Interpretation Robert Kennaley McLauchlin & Associates.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
March Board Meeting March 27, Background 106 & 108 Como Ave Zoned as small business in residential area Put up for sale in 2008 for $100,000 and.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
Marcy Mealy Procurement Specialist CDBG Program
Navigating your entitlement to buy and/or sell a residence under Permanent Change of Station orders.
The Housing Alliance of Pennsylvania. Addressing blight is a local concern But solutions are largely governed by State law PA General Assembly has modernized.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Condemning Unsafe Nonresidential Structures Richard Ducker School of Government UNC – Chapel Hill March 23, 2007.
Understanding Right of Way Process Dawn Haecker - Training & Technical Support Supervisor INDOT Trent Newport - VP, CrossRoad Engineers.
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
HOLMES BEACH PROPERTY MANAGEMENT, LLC MANAGEMENT PLAN INDEX I. Administration of the Association A. Officers and Responsibilities B. Meeting Schedules.
David M. Harrison, Ph.D. Real Estate Finance Texas Tech University Common Covenants and Clauses Promise to Pay - Specifies principal, interest, penalties,
2011 Raze & Removal Pilot The WisDOT Northeast Region embarked on a new raze and removal process on a project in Sheboygan & Fond du Lac. It’s purpose.
Subchapter III: Company Certification Requirements.
PROCUREMENT PROCESSING Tammy Froscher, Procurement Property Technician U.S. Fish and Wildlife Service, LSRCP Program Office March 17, 2011.
Lead Paint Hazards: Rules and Resources Beth Chase, Office of Communications and Outreach MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION Protecting Maine’s.
Federal Acquisition Service U.S. General Services Administration David Robbins, CPPM Director Office of Personal Property Management July 25, 2011 GSA.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
How I Will Help You SELL Your Home. The Four P’s Critical Elements for a Successful Sale PROPERTY PRICE PROMOTION PREPARATION FOR CLOSING.
Neighborhood Stabilization Program (NSP) Orange County, Florida.
Tax Collection & Enforcement 2010 SUMA Convention Education Session E6 January 31, 2010.
Neighborhood Stabilization Program (NSP) Update February 16, 2010.
U.S. General Services Administration Term Contracts Drand Dixon Sales Contracting Officer Federal Acquisition Services Drand Dixon Sales Contracting Officer.
REASSESSMENT WHY BOTHER SINCE IT COSTS SO MUCH TO DO THE REASSESSMENTS?
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
Understanding Right of Way Process Dawn Haecker, Training & Technical Support Supervisor, INDOT Trent Newport, VP, CrossRoad Engineers.
Update on FCPS Construction/Renovation Projects March 2009.
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
Guidance Update DOE FIMS/RE Annual Training Real Estate Session May 5, 2015.
Highway Utility Engineer, INDOT
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
Federal Acquisition Service U.S. General Services Administration David Robbins, CPPM Director Office of Personal Property Management June 14, 2010 GSA.
Demolition Management and Monitoring Contract Update December 13,
Move It Likened to Another By the Numbers One Man’s Opinion Defined By
February 17, 2009 Orange County Neighborhood Stabilization Program Update.
Tax Foreclosed Properties Housing Committee September 21, 2015.
Mark Krause and Kassandra Walbrun WisDOT-BTS Session C.
Dawn Van Oudenhoven – WisDOT NE Region Jacob Hoagland – Asset Equipment Appraisals September 30, 2015 Chula Vista Resort, Wisconsin Dells.
Oracle Services Procurement
ANNEXATION. WHY ANNEXATION CITIES PAY FOR A WIDE ARRAY OF SERVICES AND FACILITIES THAT BENEFIT ENTIRE REGIONS AND THE ENTIRE STATE. MOST STATES RECOGNIZE.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Presented by: Francine Fast Horse Supply Management Officer.
Office of Procurement Services.  Vendor Application Website: 
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Louisiana State University. IT GOVERNANCE LOUISIANA CONSTITUTION (allows us to purchase with state funds) LA REVISED STATUTES (provides the laws that.
It Starts with Being Proactive Regarding Lien/Bond Rights   Preserving lien / bond rights allows YOU to secure (collateralize) potential nonpayment against.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Discussion of the Differences Public Works Law and Bid Law
City of Dayton Department of Planning & Community Development
R/W LAP PROJECTS Presented by Ron Crew.
What is Tax Increment Financing?
Construction Oversight
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Contract Review and Processing
Awarded Vendors Bid No MS Preventative Maintenance & Repair Service for Kitchen Equipment Contract Term ends 6/30/2023 (6 years) Board Approved.
Selling Your Home for All It’s Worth
Condemning Unsafe Nonresidential Structures
Understanding the Right-of-Way Process
Department Of Energy Review Linac Coherent Light Source Project
Weichert Realtors, Dunphy Sells
Presentation transcript:

PROPERTY MANAGEMENT RAZE & REMOVAL

PROPERTY OWNER HAS FIRST RIGHT OF REFUSAL n The property owner has first right of refusal to retain and move their structures n This may be used as a negotiation tool. n 10% of appraised value is sometimes used as a guideline for salvage value n Structures should be itemized and disposition of the structure listed in READS or on the form PROPERTY IMPROVEMENTS/REMNANT REPORT

form PROPERTY IMPROVEMENTS/REMNANT REPORT

Asbestos Inspection n Order inspection after parcel is vacated. n Review inspection report. –Determine if abatement is needed prior to moving the structure. –If asbestos will not be disturbed, it may remain in place. n Enter inspection information and attach report in READS.

Prepare Structure for Removal n Disconnect utilities. n Confirm structure is secured. –Board up to prevent vandalism, if needed. –Alert local authorities building is vacant and to notify the Department of any suspicious activity. n Schedule lawn maintenance or snow removal, if needed

MOVABLE STRUCTURES PUBLIC BID PROCESS n 1)Ad placed in local newspapers, DOT website, and other internet sites n 2)Open house held n 3) Public Bid Opening n 4)Enter sale information into READS.

MOVABLE STRUCTURES FORMS INVOLVED n 1) Sealed Bid form n 2) Purchase/Sale Agreement n 3)Hold Harmless & Indemnification

NON-MOVABLE STRUCTURES (OR TIME DOES NOT ALLOW FOR MOVE) n DEMOLITION CONTRACT –Real Estate lead n CONSTRUCTION CONTRACT –Project Development lead Region will determine which contract to use per project.

Prepare Demolition Contract n Estimate cost to clear site including asbestos abatement. n Set surety bond and bid opening date. n Enter parcel specific information into special provisions n Send information to central office to create bid packet.

Region Responsibility n Send out bid packets to prospective contractors. n Conduct sealed bid opening. n Send all bids to central office to be approved and awarded. n Send contractor notice to start. n Oversee contractor’s work.