1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View.

Slides:



Advertisements
Similar presentations
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Advertisements

This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec , 2004 RICOTTI,
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
1 A PC/Linux-based Control System with EPICS for RFGTB S. Araki, K. Hirano, J. Odagiri, T.T. Nakamura and N. Terunuma High Energy Research Accelerator.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
18. June 2003EPICS WS Control of Digital Power Supplies Andreas Lüdeke Swiss Light Source / PSI 20 May 2003 EPICS Collaboration Meeting.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Single Board Computers and Industrial PC Hardware at the CLS
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing October 18, 2007.
ORNL/SNS Spallation Neutron Source Low-Level RF Control System Kay-Uwe Kasemir, Mark Champion April 2005 EPICS Meeting 2005, SLAC.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
EPICS at APS in June.2006, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members * Try to enhance updates in the last 1 year.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
Control Group April 26, 2006 Progress of Control System Presented by C.H. Wang Control Group Accelerator Center of IHEP IMAC, April
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
September 19-20, 2007 A.Zaltsman EBIS RF Systems RF System Overview Alex Zaltsman September 19-20, 2007 DOE Annual Review.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Anders Sunesson RF Group ESS Accelerator Division
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
Status of Activities Related to EPICS and Accelerator Control in China Presented by Guobao Shen KEKB Control Group EPICS Collaboration RICOTTI Tokai, 8.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing ICALEPCS2007 October 18, 2007.
Present Status of EPICS Development at the 3GeV Proton Beam Transport Facility Control System in J-PARC JAERI Motoki OiTetuya KaiSinichiro Meigo Sinichi.
PSI Power Supply Controls MedAustron Controls Workshop 1 PR a-FMO-PSI_Power_Supply_Controls.pptx F. Moser - PSI Power Supply Controls 1.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
The recent history and current state of the linac control system Tom Himel Dec 1,
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
Magnet Low Current PS Upgrade Kristi Luchini,Sandeep Babel, Till Straumann, Mitch D’Ewart, Briant Lam, Dave MacNair May 19, 2016 VME to Emedded Industrial.
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
RF Control Electronics for Linacs Overview of activities at Electronics Division, BARC RF control electronics for: 1.Super-conducting Heavy Ion Linacs.
Experience of Developing BEPCII Control System
SNS Status Report Karen S. White 10/15/08.
ATF/ATF2 Control System
352MHz Klystron Control for the 3MeV Linac test stand
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
LLRF and Beam-based Longitudinal Feedback Readiness
Fill-pattern Control System for KEKB
Low Level RF Status Outline LLRF controls system overview
Low Level RF Status Outline LLRF controls system overview
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Power Supply Control for BEPCII
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View of the Site

2 I.PEFP  Goal  Plan, Schedule  Status of Accelerator Development  Project progress II. 20Mev Control System  History  Development Status of Sub Control System.Vacuum,RF,Event,Beam Monitor, PS,Utility EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Outline

3 Pohang Accelerator Laboratory POSTECH Proton Engineering Frontier Project PAL, Pohang KAERI,Deajeon KAERI – Korea Atomic Energy Research Institute KAPRA – Korea Accelerator & Plasma Research Association KIGAM – Korea Institute of Geoscience & Mineral Resources KAIST – Korea Advanced Institute Science and Technolgy Under construction for 20Mev Commissioning in KAERI-Deajeon Collaboration with KAERI, PAL,KAPRA,KIGAM,KAIST. Final Site will be selected by end of this year.

4 Project Goal Refer to Slide materials(Page 3~8)presented at ICFA-HB 2004 October , Beansheim,Germany “Status and progress of the PEFP Project” By Byung-Ho Choi & PEFP Team

5 Plan of PEFP(100MeV Linac & Utilization)

6 Project Schedule

7 Basic Accelerator Parameters

8 Status of Acceleraor Development(Nov. 2002)

9 Project Progress

10 Control System for 20MeV Commissioning Pohang Accelerator Laboratory POSTECH  First Phase Development(2002.7~2003.6). Control System Architecture. Control ToolKit Chioce(EPICS).Vacuum Control System  Second Phase Development(2003.7~2004.6). RF Control System. Event System for Timing Control  Third Phase Development (2004.7~2005.6).Beam Monitor Control.Power Supply Control.Cooling Water Monitoring.Intergration and Commissioning EPICS Collaboration Meeting December 8~10,2004 RICOTTI, Tokai JAPAN Scheduled to 20 MeV commissioning in April 2005 at KAERI,Deajeon Development of Control System to satisfy this mission has been executed at PAL in 3Phases for last 3 years.

11 Ralph Langer BESSY,Berin,Germany July 28~August 5,2004 EPICS Lab. At PAL Pohang Accelerator Laboratory POSTECH EPICS Expert Invitation for Review Bob Dalesio LANL,USA May 27 ~31,2003 Seminar room at PAL EPICS Collaboration Meeting December 8~10,2004 RICOTTI, Tokai JAPAN

12 Pohang Accelerator Laboratory POSTECH Vacuum Control System EPICS Collaboration Meeting December 8~10,2004 RICOTTI, Tokai JAPAN Windows based PC RS422 Interface(63 Ports) EPICS base MEDM Installed and Working at KAERI site

13 Pohang Accelerator Laboratory POSTECH RF Control System EPICS Collaboration Meeting December 8~10,2004 RICOTTI, Tokai JAPAN 10MHz, Sine x x x x 1 5 E e 2 x RF & CLOCK GENERATOR FIELD/RESONANCE CONTROLLER LOW LEVEL CONTROLLER (StrongARM CPU & FPGA) KLYSTRON AMPLIFIER KLYSTRON POWER SUPPLIES PROGRAMMABLE LOGIC CONTROLLER ETHER-NET HUB TIMING, RTDL(?) T0, RF GATE SOLID STATE AMPLIFIER RF_PAL PEFP VOLTGE CONTROLLER (8CHs) DISPLAY, MONITOR & CONTROL(FP) Low Level RF PULSE MODULATOR RFQ A B 1xx x x 1 x7x 1x t h A 1x 6 x x 1x 4x 11x x 7x 1x C LLRF(4U SUBRACK) ETHER-NET LINE RS232 or 485 Multi-Connected directly Wire Connected Down Conversion & Distribution Coupled RF (Fwd, Ref. Cavit, etc.) RF (350MHz) LO (340MHz) Clock SBC MFS VME based IOC MVME5100 SUN workstations Ethernet EPICS IOC(Developed) CPU : MVME5100 VME I/O: MFL32A EPICS Base

14 VMEbus MFL32A 500W(+5V,-12V,+12V).12 slots, VME64x with P0 Remote Control(RS422,LAN) VME Bus Subrack Pohang Accelerator Laboratory POSTECH Human CC,INC VME Tech,INC Domestic Products EPICS Collaboration Meeting December 8~10,2004 RICOTTI, Tokai JAPAN 16bits ADC,0~+10V :8Ch 16bits DAC,0~+10V:2Ch DIO:32Ch 10/100Base T Ethernet RS232C,32bit CPU

15 -Development Progress. Detailed Specification. System Configuration Layout. Hardware Setup and Software module Test. Lab Test Pohang Accelerator Laboratory POSTECH Timing Control EPICS Collaboration Meeting December 8~10,2004 RICOTTI, Tokai JAPAN Event system for timing control has been selected. TIMO from SLS made contribution.

16 Tank 1 DT : 51 L=444.5cm E=7.2MeV CT BPPM Tank 2 DT : 39 L=465.5cm E=11.5MeV Tank 3 DT : 33 L=475.8cm E=15.8MeV Tank 4 DT : 29 L=444.5cm E=20.0MeV CT BPPM Beam Stop BPPM #3BPPM #4 RFQ DCCT #1 DCCT #2 CTBPPM Button Signals EPICS VME IOC crate BPPM Low-level Electronics crate#2 BPPM #1 BPPM #2 BPPM Low-level Electronics crate#1 CPUADC#1 ADC#2 Ethernet EPICS IOC(Developing) CPU : MVME5100 ADC#1 : VTR812/10 ADC#2 : AVME EPICS Base Pohang Accelerator Laboratory POSTECH BPM/DCCT Control System(Third Phase) EPICS Collaboration Meeting December 8~10,2004 RICOTTI, Tokai JAPAN Low Level Electronics(Working) -Bergoz Customized Hardware module

17 Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting December 8~10,2004 RICOTTI, Tokai JAPAN Power Supply Control System for DTL_Q #1 PS EPICS VME IOC CPU IP Carrier IP TM IP #2 PS #35 PS #42 PS (5Ea) Fiber Optic IP:Industry Pack TM:Transition Module DSP:Digital Signal Processing ADC:Analog Digital Converter PS:Power Supply Pack Simulation Board With Power Supply Intf. With Controller Control Team PEFP CPU : MVME5100 (Digital Power Supply) Selected the SLS Power Supply Type. H/W Modules are delivered & setting them up

18 Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting December 8~10,2004 RICOTTI, Tokai JAPAN Still gathering information for Utility Utility Control(Cooling Water)

19 Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting December 8~10,2004 RICOTTI, Tokai JAPAN Main Control Screen for PEFP

20  PEFP  Final Site will be selected by end of this year.  20Mev Control System for PEFP IOC Level  RF (Developed)  Vacuum (Developed)  Event System for Timing Control (Developed)  Beam Monitor (Developing)  Power Supply(Developing)  Utility(Still gathering control requirement) OPI  MEDM Switch to EDM  Channel Archiver(From Kay)  More things..  EPICS Training to PEFP Physicist, Engineer Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting December 8~10,2004 RICOTTI, Tokai JAPAN Summary & Plan