Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California.

Slides:



Advertisements
Similar presentations
Session 3: Advances in Our Understanding of Mars Searching for Evidence of Past or Present Life on Mars David J. Des Marais NASA, Ames Research Center.
Advertisements

Moon to Mars C. P. McKay NASA Ames Research Center
IMPLEMENTATION OF PLANETARY PROTECTION REQUIREMENTS FOR THE RPWI EXPERIMENT ONBOARD THE JUICE SPACECRAFT I. Kolmasova 1, O. Santolik 1,2, J. Soucek 1,
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
Lunar Advanced Science and Exploration Research: Partnership in Science and Exploration Michael J. Wargo, Sc.D. Chief Lunar Scientist for Exploration Systems.
Developing a Records & Information Retention & Disposition Program:
Australian Centre for Space Photonics Andrew McGrath Anglo-Australian Observatory.
Mars Exploration By Jacob Stinar. Water on Mars.
PLANETARY PROTECTION GUIDELINES POLICY & REQUIREMENTS FOR CUBESATS Dr. Cassie Conley, James E. Johnson, January 8, 2015.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Jet Propulsion Laboratory California Institute of Technology National Aeronautics and Space Administration National Aeronautics and Space Administration.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
1 Head of Russian Federal Space Agency ISS Program International Cooperation Paris, June 17, 2009.
1 Working Group on Archives and Records Management WGARM.
JAXA’s Space Exploration Scenario for the Next Twenty Years - Science Strategy - Masato Nakamura Steering Committee of Space Science Institute of Space.
Filling Mars Human Exploration Strategic Knowledge Gaps with Next Generation Meteorological Instrumentation. S. Rafkin, Southwest Research Institute
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Methods of Astrobiology By Michael Timmons Analytical/Radio/Nuclear (ARN) Seminar Spring 2006.
UN/CS/RAI/USAA/DB01/ Development of a Strategic Plan for a Digital Archives Programme Common Services Working Group on Archives and Records.
Planetary Protection Planetary Protection at NASA: Overview and Status Catharine A. Conley, NASA Planetary Protection Officer 4 August, 2010.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
John D. Rummel East Carolina University and the McGill University Institute of Air and Space Law “Due Regard” in Space Activities: Avoiding Harmful Contamination.
Mars Rovers By Taylor Sokolovic.
IMARS History and Phase II Overview Presented to MEPAG 13 May 2014 L. May, NASA HQ NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted.
System Integration Testing Requirements Mars Polar Lander Steven Ford SYSM /11/12.
Environmental Management System Definitions
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
1 STSC/IAEA Safety Framework for Space NPS Applications, Vienna, 2 April 2011 ESA UNCLASSIFIED – For Official Use L. Summerer / U. Bohlmann The STSC/IAEA.
Planetary Protection 1 Planetary Protection Considerations for Mars Sample Return C. Conley, NASA PPO G. Kminek, ESA PPO 4 August, 2010.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California Michelle Viotti, Manager,
Exploration of Mars By: Micah Cluey. Facts ● The exploration of mars has taken place over hundreds of years, beginning in earnest with the invention and.
IAF Conference, Houston, TX, USA, October 2002 By the students of ISU SSP 2002 Alone? A Discovery Sourcebook for Astrobiology.
PROPOSED 2018 Joint Rover Mission Plans for Proposed 2018 NASA & ESA Joint Rover Mission Landing Site Selection Matt Golombek Mars Exploration Program.
Human Exploration of Mars Design Reference Architecture 5
SWEA Planetary Protection SWEA Peer Review March 28-29, 2010 IRAP, Toulouse.
Goals for this Meeting: Day 1 Day 2 Update the community on progress in the exploration of Mars, including NASA and the European Space Agency (missions.
And scattered about... were the Martians–dead! –slain by the putrefactive and disease bacteria against which their systems were unpre- pared; slain as.
1 Science Definition Team Meeting National Aerospace Institute Hampton, VA Dec 1-3, 2015.
National Aeronautics and Space Administration February 27, 2013 Defining Potential HEOMD Instruments for Mars 2020 A Work in Progress... NOTE ADDED BY.
Robotics and Autonomy Test Facility - Hardware Verification needs Elie Allouis HRAF Workshop – 28/02/2012.
MEPAG: Action Items, Forward Planning Jack Mustard, MEPAG Chair MRO HiRISE / U. Arizona / JPL / NASA NOTE ADDED BY JPL WEBMASTER: This document was prepared.
National Aeronautics and Space Administration Astromaterials Research and Exploration Science 1 NASA—Johnson Space Center Astromaterials Research and Exploration.
Pre-decisional – for Planning and Discussion Purposes Only 1 Technology Planning for Future Mars Missions Samad Hayati Manager, Mars Technology Program.
ESA UNCLASSIFIED – For Official Use FISO COLLOQUIUM, 18 June 2014 B. HUFENBACH ESA’S SPACE EXPLORATION STRATEGY.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Introduction Planetary Protection (PP) is a scientific discipline that aims to protect other celestial bodies from microorganisms found on Earth by preventing.
Brian T. Malec, Ph.D. Professor of Health Administration Department of Health Sciences California State University, Northridge Northridge, CA
The Year in Review 2016 Humans to Mars Report. Mars Science Paving the Way Notable Discoveries – The Past 5 Years Mars was once a habitable environment.
MAVEN Planetary Protection Lead Bob Bartlett Mars Atmosphere and Volatile EvolutioN (MAVEN) Overall Approach to Planetary Protection Wednesday, October.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
National Goals and Objectives
Mars Rover By Benn Davis.
Return to The Moon: An International Perspective
Planetary Protection at NASA
Planetary Protection at ESA
Planetary Protection of Outer Solar System bodies - PPOSS -
Planetary Protection of Outer Solar System bodies - PPOSS -
Planetary Protection Management at JAXA
Planetary Protection Category II
Planetary Protection Category V Restricted Earth Return
COSPAR Panel on Planetary Protection
Managerial Lessons Learned Do’s and Don’ts in Planetary Protection
COSPAR Panel on Planetary Protection
Curious about Curiosity?
Strategic Environmental Assessment (SEA)
United Nations Voluntary Fund on Disability (UNVFD)
REQUIREMENTS FOR MISSIONS towards europa
REGULATORY AND POLICY COMMITTEE Recommendations to the NASA Advisory Council NASA HQ September 5, 2019.
Presentation transcript:

Planetary Protection: Background and Planning for PP Compliance Karen Buxbaum Mars Program Planetary Protection Manager Jet Propulsion Laboratory, California Institute of Technology Presentation to MAVEN Instrument Tutorial October 20, 2010 Berkeley, California

So, what is planetary protection? An international agreement A NASA Policy Directive (NPD ) A set of requirements (found in NPR ) that robotic planetary flight missions must meet in order to be in compliance with NASA policy A “way of life” in solar system exploration—integral to the endeavor, not an add-on or afterthought 10/20/102 AA for Space Science, or designee, is responsible for overall administration. Planetary Protection Officer is designee for managing and implementing.

Planetary Protection Goals Avoid inadvertently taking Earth organisms to another Solar System body (forward contamination) – Necessary to preserve planetary conditions for future biological and organic constituent exploration Avoid introduction of alien microbes into Earth’s biosphere (back or backward contamination) – Necessary step to protect Earth and its biosphere from potential extraterrestrial sources of biological contamination 10/20/103 Complies with Article IX of the Outer Space Treaty of 1967 Basic concept dates from 1950s, and before

PP Goal #1 Restated Or, as the NASA PPO has been known to say… On Earth, life is everywhere. How do we ensure that we don’t find what we brought with us when we go to explore somewhere else? 10/20/104

Outbound to MarsAny Sample Return“Back PP”“Forward PP” Avoid false positive life detection event Life detection event in this context is considered to mean detection of contamination that could be confused with extraterrestrial (ET) life Avoid false positive life detection event Life detection event in this context is considered to mean detection of contamination that could be confused with extraterrestrial (ET) life Any Mars mission must comply with international PP policy, but not all missions face all three aspects shown here. Some implementation options overlap, but each requirement has intent that is distinct from the others. Protect Earth from potential harmful effects (biohazards/toxins) Requirements & Mission Scenarios Avoid contamination of Mars with Earth life Introduction of viable Earth life into a favorable martian environment is considered harmful contamination by definition Avoid contamination of Mars with Earth life Introduction of viable Earth life into a favorable martian environment is considered harmful contamination by definition Forward PP, Back PP, Round-trip PP 10/20/105 “Round-trip PP”

Historic Perspective Implications appreciated in fiction even before space age Policy formulation began in 1950’s (e.g., quarantine standards introduction by International Council of Scientific Unions (ICSU)) Introduction into law as Article IX of 1967 Outer Space Treaty Full history is a longer story, but COSPAR and NASA PP policy continue to evolve based on science, coupled with internal and external recommendations For NASA, primary recommendations come from SSB with programmatic and operational advice from the Planetary Protection Subcommittee of the NASA Advisory Council; for projects and programs, specific advice flows from the PPO 10/20/106

Categories and Scope of Work Categories I and II – Little cost or risk, technically simple, but expert assistance needed Categories III and IVa – Significant costs and risks, technically difficult – Should delegate to single Project PP Manager – Implementation methods and required tasks cross several areas of typical project WBS Categories IVb, IVc, and V “restricted Earth return” – Greater costs and risks, technically challenging 10/20/107

Planetary Protection Categories for Mars Missions Category III, IV, and V mission categories apply to Mars exploration – Arose from 1992 SSB advice on Forward Contamination of Mars – Specify acceptable limits of possible contamination, based on mission type – Categories do NOT specify or indicate the specific implementation (e.g., IVb does not imply full system sterilization) or the degree of difficulty 10/20/108

Planetary Protection Categories for Sample Return Category V mission category can be “restricted” or “unrestricted” Earth return – No guesswork about which applies to Mars – Even this category still does not fully specify or indicate the specific implementation (e.g., how the forward contamination requirements will be implemented) – The exploration program uses advice from 1997 and 2009 SSB reports Mars Sample Return—Issues and Recommendations and Assessment of Planetary Protection Requirements for Mars Sample Return Missions 10/20/109

From Policy to Implementation NASA HQ sets policy for the U.S. – Early on in exploration, less is known and policy is more conservative – Early on in exploration, guidelines have tended to be probabilistic – Special issues with regard to definition of sterility, e.g., extremophiles, non-spore-formers Projects plan and implement to achieve PP compliance – Requirements are project-specific; apply to all the hardware, including instruments – Sterility definition is sometimes an issue (“bioburden reduction” is often the correct operational term) – Options may require much study and iteration with PPO Technology planning for PP is difficult (not a MAVEN issue) – Policy has ambiguities; often unclear whether specific technology would be judged to achieve compliance – Timeline to approval is long; multiple stakeholders – PP technology readiness is judged differently than for flight hardware 10/20/1010

PP Implementation Conceptually simple but complicated in practice! Forward contamination control (remember, this includes the “round trip” issues) – Issues often more controversial – Operational and monetary costs – Consequences not as dire—preserve future science Back contamination – Common sense purpose—protect the home planet – Even greater operational and monetary costs 10/20/1011

Planetary Protection vs. Contamination Control Contamination control – Particulate and molecular contamination on flight systems to ensure proper function of instruments and sensors – Typically derived from science requirements Planetary protection (forward contamination) – Requirements levied by NASA for benefit of future science Overlaps – Some but not all methodologies in common – PP interest in life detection and sample return 10/20/1012

PP Implementation Planning – PP Plan, Subsidiary Plans, PP Implementation Doc Analysis Bacterial burden accounting Biological contamination control Reports and reviews Record keeping 10/20/1013

Typical Documents and Schedule Certification Request—typically in Phase A PP Plan—draft ~PDR -30d; approved by PDR Subsidiary Plans (part of PP +3mo Implementation Document—proj. app’d Pre-launch -90d Post-launch +60d Extended Mission Report (if applicable) EOM -60d End of Mission PP Report—due at EOM plus 60d 10/20/1014

Guidelines and Methods Current forward PP guidelines for Mars are attached to levels of acceptable bioburden Levels of acceptable bioburden, bioburden reduction and assay methods are based substantially on research conducted during the Viking program during the 1970s – Bioburden assay methods are culture based Concern about bioburden also depends on Mars environments and ability of microorganisms to survive and grow there—information on both is constantly increasing – Understanding “what” as well as “how much” is now considered important – Concept of “special regions;” creation of new PP category IVc for Mars Has there been other progress or change relevant to planetary protection in recent years? 10/20/1015

Relevant Progress Guidelines and Methods Methods for bioburden reduction and assessment have advanced in recent years and progress continues – Improved understanding of effective cleaning methodologies – New molecular assays for faster measurement of spacecraft and facility cleanliness (LAL and Total-ATP assays) – Faster cultivation-based assays in development or validation phase – Expanded options for dry heat bioburden reduction—new specification likely – Vapor hydrogen peroxide specification near final NASA (and ESA) certification – Other bioburden reduction methods in R&D – Contamination transport measurement and modeling – Genetic inventory capability development – Biobarrier developed and flown (Phoenix) – Aseptic assembly experience (Beagle 2) System engineering studies and technology gap assessment – Feasibility case studies for system level sterilization (a la Viking) 10/20/1016 YES!

Relevant Progress Science and Missions Advances in planetary science and mission implementation experience – Mars landers (e.g., Pathfinder, Mars Polar Lander, Mars Exploration Rovers, Beagle 2, Phoenix, Mars Science Laboratory) – Mars orbiters (Mars Global Surveyor, Mars Climate Orbiter, Odyssey, Nozomi, Mars Express, Mars Reconnaissance Orbiter) – Sample return (Genesis, Stardust, Hayabusa) – Extensive study in preparation for possible MSR – Expanded knowledge through astrobiology programs worldwide – Added perspective through preparation for possible exploration of icy moons of outer planets – Expanded knowledge about Mars Advances in genomics and biocontainment experience in the private and gov’t sectors, domestically and internationally 10/20/1017

Mars Global Surveyor: 1996 Launch Artist concept

2005 Mars Reconnaissance Orbiter First US Mars Orbiter Mission to use the bioburden reduction option for planetary protection compliance Implemented pre-launch bioburden controls plus extensive burn & breakup analysis Artist concept

Points to Remember NASA HQ sets policy; projects plan and implement to achieve compliance Requirements are typically quite project-specific Introduce into project early – Get official category – Get requirements early (applies to all hardware) Develop an approach to PP compliance that is integral to flight system and mission design Record-keeping required for launch approval by NASA PPO and for End-of-Mission Report PP compliance for the mission does not end with launch 10/20/1020

QUESTIONS? 10/20/1021

BACKUP CHARTS 10/20/1022

10/20/1023 “Planetary protection implementation on Mars Reconnaissance Orbiter mission” J. Barengoltz and J. Witte Advances in Space Research Volume 42, Issue 6, 15 September 2008, Pages Definitive MRO PP Reference

A Viking Casserole

Back to the Surface: Mars Pathfinder

Lost on landing, 1999 Mars Climate Orbiter (Late 1998 Launch) Lost in orbital insertion, 1999 Mars is not very forgiving.... Mars Polar Lander (Early 1999 Launch) Artist concepts Case Study for PP Caution: Mars ‘98

MER-1 at KSC/ATLO Getting Bigger: MER 2003

2007 Scout Mission: Phoenix First US mission required to comply with intent of COSPAR Category IVc established in 2002 Implemented Viking-level sterilization of the hardware used to access (and touch) the martian subsurface Challenges included hardware sterilization, maintenance of sterility using a biobarrier, deployment of the biobarrier at Mars, prevention of recontamination of sterile hardware during operations

Bigger Still: MSL 2011 Planning to achieve unprecedented levels of organic cleanliness Nuclear power system raised additional complexities, affected mission options Responsive to concerns about martian special regions (staying away) Currently implementing its planetary protection strategy, taking into account its science payload and possible landing sites Artist concept