Patrick Christian Mike Schlicht UW System Network Operations Metrics 9/23/2015.

Slides:



Advertisements
Similar presentations
Demand Response Forecasting, Measurement & Verification Methods/Challenges/Considerations National Town Meeting on Demand Response Washington, DC - June.
Advertisements

Report from the Networking in Times of Disaster. What is a Disaster? Networks that work in times of disaster should address: Events that affect a network.
Steve Lewis J.D. Edwards & Company
NetApp Confidential - Limited Use
Line-of-Sight IP Networks Johnathan Poarch Senior Information Tech Specialist.
Network Management - Introduction. References Communications Network Management, Kornel Terplan Prentice Hall 1992, 2 nd ed. Managing Inter networks with.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Understanding Electrical TransmissionDemonstration D1 A Guide to the National Grid Transmission Model Demonstration D1 Power losses in transmission.
Campus Networking Workshop
VSE Corporation Proprietary Information
Network Management Basics Network management requirements OSI Management Functional Areas –Network monitoring: performance, fault, accounting –Network.
Business Continuity Section 3(chapter 8) BC:ISMDR:BEIT:VIII:chap8:Madhu N PIIT1.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
© 2009 EMC Corporation. All rights reserved. Introduction to Business Continuity Module 3.1.
Reducing maintenance expense while improving patient safety by predicting electrical system failures University of Pittsburgh Medical Center Pittsburgh,
Reducing Total Cost of Ownership (TCO) Mike Chon AM Computers.
© ABB Group May 15, 2015 | Slide 1 The MotorAdvantage – how to save UK industry Steve Ruddell, Division Manager, Discrete Automation and Motion, ABB Ltd.
Circuit Analysis and Troubleshooting A Six Step Procedure Created by Jimmie Fouts Houston County Career Academy for.
Ramsey Donnell Assoc. Director for Access & Organization The John Marshall Law School.
Research and Educational Networking Information Analysis and Sharing Center (REN-ISAC) Mark S. Bruhn, Interim Director University Copyright.
June 23rd, 2009Inflectra Proprietary InformationPage: 1 SpiraTest/Plan/Team Deployment Considerations How to deploy for high-availability and strategies.
What causes bugs? Joshua Sunshine. Bug taxonomy Bug components: – Fault/Defect – Error – Failure Bug categories – Post/pre release – Process stage – Hazard.
Background Early 2000 Decision for Continued Campus Service Approval for Campus Funding Slow Alternative Service Materialization within Davis.
Network Management 1 School of Business Eastern Illinois University © Abdou Illia, Fall 2006 (Week 16, Tuesday 12/5/2006)
Location of the theme gray Location of the theme blue ZTE Proprietary On Reliability of COTS Hardware Dr. Li Mo Chief Architect, CTO Group.
Nov Voltage Collapse in Electrical Power Systems by Zivan Zabar ECE Dept.
Understanding Network Failures in Data Centers: Measurement, Analysis and Implications Phillipa Gill University of Toronto Navendu Jain & Nachiappan Nagappan.
Mediacom. More Than Cable Mediacom is the nation’s 8 th largest cable company Brings broadband to community anchor institutions, including school districts,
1 Customer Network Operations Center. 2 Agenda Overview Benefits Value Additional Services Questions Monitoring Options.
Review of Power Blackout on Telecom P. J
Internet Outage Trends Sean Donelan Equinix Inc NANOG 21 Atlanta, Georgia.
Administration and Finance Incident Prioritization Document
McGranaghan US Session 2 Block 4 Question 12 Barcelona May Statistical Framework for Establishing Target Reliability Levels and Classifying.
1 Maintenance Performance Measures Management needs information of maintenance performance for planning and controlling the maintenance process. The information.
TASK PACKAGING Module 1 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Remanufactured Engines An Economical Solution. Lift Truck Operating Applications l Light Duty - clean environment, short runs, improved level surfaces.
Forging new generations of engineers
Redundancy in High Performance Networks Fall 2005 Internet2 Member Meeting.
Global City Teams Challenge September 29-30, 2014 Report Out: Project X.
Reliability Analysis of a Ti-35II Calculator Rensselaer Polytechnic Institute Department of Engineering and Science DSES-6070 HV6 Statistical Methods for.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
Business Data Communications, Fourth Edition Chapter 11: Network Management.
ERCOT SCR745 Update ERCOT Outage Evaluation Phase 1 and Phase 2 TDTWG April 2, 2008.
SINTEF Energy Research 1 Fault statistics in distribution network Regulation of quality of supply Gerd Kjølle, Norway, RT3.
1 Verizon Technology California Public Utilities Commission Rulemaking Backup Power at the Customer Premises Technical Workshop June 5th, 2007.
Example 8 Manufacturing Chapter 7.4 Sharper Technology Company manufactures three types of calculators, a business calculator, a scientific calculator,
Information Technology Service Availability Metrics Trey Felton IT Account Manager COPS/RMS September 2009.
Risk Analysis for Major Rehabilitation. Major Rehabilitation Background  Prior to FY 1992  Funded under Operation and Maintenance, General, Appropriation.
A Planning Based Approach to Failure Recovery in Distributed Systems Naveed Arshad Dennis Hiembigner, Alexander L. Wolf University of Colorado at Boulder.
How to Build a NOC. Identify Customers –Who are your customers? Understand Customer Expectations –What are your user expectations? –SLA’s? Support Service.
John Carwardine, Ewan Paterson, Marc Ross 14/15 July 2009 Availability Task Force: Subgroup #2.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Common Cause Failure Analysis Workshop Information IAEA Workshop City, Country.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
Western Iowa Tech Community College Sioux City & Cherokee IA Campuses Dec 5, 2014.
April 2010 COPS/RMS Information Technology Service Availability Metrics Trey Felton Manager, IT Administration.
Distribution systems basic techniques and radial networks.
1 High-availability and disaster recovery  Dependability concepts:  fault-tolerance, high-availability  High-availability classification  Types of.
Information Technology Service Availability Metrics
ERCOT SCR745 Update ERCOT Outage Evaluation Phase 1 and Phase 2
ISO New England System R&D Needs
UW System Network Operations Metrics
Analysis of Network Outage Reports
Forging new generations of engineers
Network Survivability
Circuit Analysis and Troubleshooting
QPM delivers value over the life cycle of the product
Modular Edge-connected data centers
Analysis of Network Outage Reports
Modular Edge-connected data centers
Preventive Maintenance Service Agreement
Presentation transcript:

Patrick Christian Mike Schlicht UW System Network Operations Metrics 9/23/2015

What gets measured gets managed

Significant event summary UW/WiscNet network engineer deployment activities caused ~4 hours of campus "isolation" from world ~16 hour electrical (line card failure) event in IA City ~38.75 hours of commercial circuit downtime - particularly UW-Platteville's backup connection Portion of fiber to UW-Platteville was not buried resulting in a 10.3 hour fiber repair Several commercial power outages - most with minimal impact due to investment in DC power systems

Significant event summary Various HVAC issues in pedestals & UWC locations Significant unplanned fiber (cut) repairs –UWEC - UWC-BarronCO (~3.5 days) (weather decision) –Ames, IA (10 hours) –Kenosha (4.5 hours) Several campuses had significant LAN issues that are not included in these statistics

Workload metrics ~6 months of activity after deployments 202 total # of tickets (calls) –72 planned events –130 unplanned events …stated another way –94 service affecting events –108 non-service affecting events Service affecting events = # of times when any component of the network operated in a degraded state

FY15 network availability Many ways to calculate including planned + unplanned events vs. just unplanned vs. actual isolation of a campus network from world % availability

Root cause analysis

Questions?Questions?