Kevin Long Project Controls eCAM Notebook Training Manual.

Slides:



Advertisements
Similar presentations
Support.ebsco.com EBSCOhost Digital Archives Viewer Tutorial.
Advertisements

Microsoft Project Tutorial for Chapters 6 & 7
“The Honeywell Web-based Corrective Action Solution”
Module 2 Navigation.     Homepage Homepage  Navigation pane that holds the Applications and Modules  Click the double down arrow on the right of.
AIMSweb Progress Monitor Online User Training
GALVESTON COUNTY, TX P-CARD TRAINING GALVESTON COUNTY.
Home Page The presentation will dissect each section of the Home Page.
E-Portfolio July2014 Managing Multi-source Feedback.
Refresher Instruction Guide Strategic Planning and Assessment Module
Employee Self Service August 2010 InSITE Self Service Employee Self Service Presentation This presentation is approximately 15 minutes in length. This.
A Proposed Model for GV Express October 2008 GREEN version.
SIS – NBS Online Specimen Tracking System Training
Library Online Catalog Tutorial Pentagon Library Last Updated March 2008.
Logging In Go to web site:
HOW TO USE THE SYSTEM Specialty Crop Block Grant Program Online System.
WebDFS Budget Amendment and Personnel Processing.
TFACTS Private Provider Financial/Invoicing Overview 1.
Payment History Wizard June 20, Payment History Wizard  Payment history can be entered in ACT 7 for prior years by using the Addback wizard. 
ETravel Authorization / Reimbursement Overview SOLAR Financials x 6685 July 8, 2014.
Quick Start Guide. This 22 page introduction to the Financial Assessment Subsystem provides the user with a visual overview of the components of the system.
Education Google Calendar (GCal) English. Education Upon completion of this course, you will be able to:  Navigate the GCal interface  Search your calendar.
Compliance Assist Refresher Instruction Guide Adding or Editing Unit/College Strategic Goals.
StressChill App Click the StressChill icon (shown to the right) to open the app. If you do not see this on the desktop, you will find it in the pull up.
Arizona Department of Education Exceptional Student Services Vouchers System RTC User.
Event Manager Training Part 3.  Edit Event Options - Customize FY11 Sites  Edit Event Webpages  Sending s (Recruitment/Engagement)  Help and.
User Group Meeting Dashboard Features Products Customers Vendors Quick Find Menu/Search Shortcuts Popups Key Performance Indicators Tasks.
Moodle (Course Management Systems). Assignments 1 Assignments are a refreshingly simple method for collecting student work. They are a simple and flexible.
Using the FOCUS Web Site Teacher’s Desk. Topics Covered in this Presentation n Accessing the FOCUS Web site n Importing and Creating Classes n Adding.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Mass Assigning Student Data Mass Assigning Student Data Presented by: Halie Paglio.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
CA South-African Member – User Pack The CA South African Member – User Pack contains the following Login Instruction Log CPD Hours View CPD Hours Exemption/
0 eCPIC User Training: Earned Value Management (EVM) in eCPIC These training materials are owned by the Federal Government. They can be used or modified.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Discipline Referrals Presented by: Christine Lee Presented by: Christine Lee.
Instructors begin using McGraw-Hill’s Homework Manager by creating a unique class Web site in the system. The Class Homepage becomes the entry point for.
Facility Reporting v. 1.0 Managing Clinical Staffing Reports on the Illinois Outcomes Website May 20, 2009.
South Dakota Assessment Portal Step by Step Instructions for Teachers Presented By: Jackie Jessop Rising – Gavin Woltjer –
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
PaymentNet: Cardholders Procurement Services Laurie Krauel.
Taxpaid Cigarette Wholesale Dealer’s Report (CWD).
Compliance Assist Refresher Instruction Guide Adding or Editing Student Learning Outcomes.
0 eCPIC User Training: Portfolios Module These training materials are owned by the Federal Government. They can be used or modified only by FESCOM member.
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
ServicePoint 5.0 Upgrade Overview 1. Navigation & Home Log in takes you to Home Page – New Look Home Page Banner Logos can be uploaded Agency/Program.
State of Michigan Learning Management System (LMS) Viewing Your Transcript Updated: 10/29/2015.
Staff Module and Summary of Changes 1. Icon Changes: Page 3 Signing In and Password/Pin Changes: Page 4 Logging Out: Page 8 Staff Module Changes: Page.
Indicator 13 Secondary Transition. Main Menu SPP13 has a navigation toolbar located at the top of each screen. If you use the toolbar to navigate to another.
Payroll/Personnel System Web-Based New Hire Presented by Payroll Services.
Migrant Student Information Exchange (MSIX) MSIX Reports March 3, 2011 Sponsored by: U.S. Department of Education Deloitte Consulting LLP.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
31-01: Demand Planning Overview Supply Chain Platform Training Presentation Updated April 2011.
Staff Module and Summary of Changes 1. Icon Changes: Page 3 Signing In and Password/Pin Changes: Page 4 Logging Out: Page 8 Staff Module Changes: Page.
VA Primavera P6: Baselining the Project Department of Veterans Affairs Office of Information and Technology IT Workforce Development (ITWD) in collaboration.
Using Custom Submission Questions and Questionnaires in Editorial Manager™ Created by J. Strusz (9/21/2010)
Compile your monthly P-Card Packet 1,2,3 For in depth screenshots and details on Step 1 click here 1.Open your transactions for the Current Billing Cycle.
NOODLETOOLS SIGN-IN Student ID #
Return Shipment Manifest
CPOC-SFDC Scheduling Training Guide
Program Management Portal (PgMP): Catalog and the Client
Quick Instructor Guide
LSST Project EVMS Performance Overview Kevin E
Quick Instructor Guide
SSI Toolbox Status Workbook Overview
Managing Rosters Screener Training Module Module 5
Manage Funding In this training module, you will be guided through the process of adding funding and funding documents to a requirement package. This feature.
Welcome to the LMS Quick User Guide.
Performance Tracking & Cost Schedule Integration
IBM SCPM Basic Navigation
Presentation transcript:

Kevin Long Project Controls eCAM Notebook Training Manual

How to Use this Training Manual What is eCAM Notebook? How to Access & Navigate eCAM Notebook What are the Key Features of eCAM Notebook? – Near Term Responsibilities Procurements Milestones Upcoming Work Packages – Additional Sections EV Summary Time Phased Data Schedule Activities and Objective Measures Performance Charts Variance Narratives Outline eCAM Notebook Manual, March 2015, Slide 2

The screenshots and instructions in this Training Manual are designed to be used while logged into eCAM Notebook. If a slide needs clarification, correction or additional information, please do not hesitate to contact me—I welcome your feedback! How to Use this Training Manual eCAM Notebook Manual, March 2015, Slide 3

eCAM Notebook is an information hub with a web interface; it pulls both schedule and cost data from P6 (aka Primavera) and Cobra databases. Access eCAM Notebook by clicking on its link on the LSST Project page. What is eCAM Notebook? eCAM Notebook Manual, March 2015, Slide 4

Basics and Navigation Kevin Long, 25 March 2015, Slide 5 The following slides provide basic information about Filters and Checkboxes in eCAM Notebook

You can use the four drop-down menus at the top of the eCAM Notebook page to select the Project, CAMs, WBS Levels, and WBSs. Your selection will automatically filter the data, and populate the table using P6 and Cobra data. The web page is dynamically updated based on the filters selected. The CAM selection defaults to you upon logging in. In the Project drop-down menu, “LSST ME 15-01” signifies “LSST Month End January 2015.” Basics and Navigation Filters eCAM Notebook Manual, March 2015, Slide 6

A checkbox labeled “Only Show Variances” is located to the right of the filters. When checked, only items with yellow or red indicators in the Procurement, Milestone, and EV summary sections will be displayed. Basics and Navigation “Only Show Variances” Checkbox eCAM Notebook Manual, March 2015, Slide 7

The “Hide WBS Summary” checkbox is the middle checkbox in the set of 4. When checked, eCAM Notebook will display control accounts in the EV summary section.. Basics and Navigation “Hide WBS Summary” Checkbox eCAM Notebook Manual, March 2015, Slide 8

The “Hide Completed” checkbox is located at the right of the set of three checkboxes. When checked, completed Control Accounts and work packages are hidden. Basics and Navigation “Hide Completed” Checkbox eCAM Notebook Manual, March 2015, Slide 9

Each section can be expanded or collapsed by clicking on the chevron at the top left corner of each section Basics and Navigation Expanding or Collapsing a Section Kevin Long, 25 March 2015, Slide 10

Near Term Responsibilities Kevin Long, 25 March 2015, Slide 11 The following slides provide information about four eCAM Notebook indicators that should be monitored on a monthly basis: Procurements Milestones Work Packages

Near Term Responsibilities Procurements Kevin Long, 25 March 2015, Slide 12  My Procurements The default view displays two months of major procurement activities (steps) that are incomplete. »The data are pulled from the current Integrated Master Schedule (IMS). »A drop-down menus allows for filtering the data based on the time period (1 Month, 3 Months, 6 Months, All). »The data match the schedule data shown in the Procurement Tracker.

Near Term Responsibilities Procurement Leading Indicator “Lights” Kevin Long, 08 May 2013, Slide 13  Procurement Leading Indicator “Lights” The default view displays indicators based on the following: »Red Today’s date >= forecast start/finish date or Today’s date >= BL start/finish date »Yellow Forecast start/finish date > BL start /finish date and today’s date < BL Start/ BL Finish »Green Forecast start/finish date <= BL start /finish date and today’s date < BL Start/ BL Finish

Near Term Responsibilities Milestones Kevin Long, 25 March 2015, Slide 14  My Milestones The default view displays two months of milestones that are incomplete. »A drop-down menu allows for filtering the data based on the time period (1 Month, 2 Months, 3 Months, 6 Months, All). »The information can also be filtered by milestone level (MS Level 0 through 7).

Near Term Responsibilities Milestones Leading Indicator “Lights” Kevin Long, 08 May 2013, Slide 15  Milestone Leading Indicator “Lights” The default view displays indicators based on the following: »Red Today’s date >= forecast start/finish date or Today’s date >= BL start/finish date »Yellow Forecast start/finish date > BL start /finish date and today’s date < BL Start/ BL Finish »Green Forecast start/finish date <= BL start /finish date and today’s date < BL Start/ BL Finish ‘Include Higher Levels’ checkbox shows all higher level milestones above the level selected when it is checked. »When this checkbox is checked and the Level dropdown list is set to Level 3, all Level 0, 1, 2, and 3 milestones will display.

Near Term Responsibilities Upcoming Work Packages and Planning Packages Kevin Long, 29 March 2015, Slide 16  Upcoming Work Packages and Planning Packages are located under Near Term Responsibilities and show: Any labor work package that NSFs not have an actual start date within the time frame selected; Labor work packages that are planned to start in the time frame selected (three months is the default); Planning packages that should be converted to work packages within the time frame selected (six months is the default).

Near Term Responsibilities Upcoming Work Packages and Planning Packages Leading Indicator “Lights” Kevin Long, 29 March 2015, Slide 17  Upcoming Work Packages Leading Indicator “Lights”: The default view displays indicators based on the following: »Red = Today’s date is greater than the Baseline Start date »Yellow = Work Package Baseline Start date is later than today  Upcoming Planning Packages Leading Indicator “Lights” : The default view displays indicators based on the following: »Yellow = Planning Package has not been converted within the time frame selected

EV Summary Kevin Long, 25 March 2015, Slide 18  Displays standard month-end earned value report with variances highlighted according to defined thresholds for cumulative variances.  Expand to the work package /planning package level by clicking on the triangle to the left of the Control Account.

EV Summary Leading Indicator “Lights” Kevin Long, 08 May 2013, Slide 19  Leading indicator “lights” indicate Cost variance Schedule variance  Milestones and Procurements: Red = A schedule/cost variance exceeds Red Thresholds. This requires immediate attention, and indicates a crisis which erodes confidence in LSST’s ability to perform. Yellow = A schedule/cost variance that exceeds Yellow Thresholds and serves as a leading indicator.

Time Phased Data Kevin Long, 25 March 2015, Slide 20  Click the chevron to expand the section.  This section displays time phased data from Cobra for the selected work package or planning package from the EV Summary.  The calendar can be changed to display data by month or by NSF fiscal year.  Cobra cost class can be selected to indicate Scheduled (BCWS), Earned (BCWP) or Actual (ACWP).

The following slides provide information related to Schedule and Objective Measures Schedule & Objective Measures Kevin Long, 25 March 2015, Slide 21

Schedule Details Kevin Long, 25 March 2015, Slide 22  Click on a work package or planning package in the EV Summary to display the schedule detail below: The work package selected will be highlighted, and the associated schedule activities will be displayed in the schedule detail section. Data is pulled from the current IMS. Resource assignments are displayed below each activity.  Note that schedule activities not coded to a work package are not displayed.

Schedule Activities and Objective Measures, Slide 23  Advance search functions are available, and partial matches are used for text entered: WBS, Activity ID, Activity Name, Work Package, Status, CAM, Start, Finish  Search results are returned dynamically based on the text entered. Kevin Long, 17 July 2013

Schedule Activities and Objective Measures, Slide 24  Activity detail from P6 for the selected activity is displayed on left side of this section.  ‘Notebook’, ‘Activity Codes’ and ‘Relationships’ can be expanded to view more information about this activity. Kevin Long, 17 July 2013

Schedule Activities and Objective Measure, Slide 25  Under ‘Relationships,’ Predecessors and Successors are displayed for the selected activity; details can be viewed by clicking on the activity listed. Kevin Long, 17 July 2013

Performance Charts, Slide 26  In the ‘Performance Charts’ section, a chart is displayed for WBS item, Control Account or work package selected.  The ‘Chart Type’ drop-down menu allows the user to select different charts.  The ‘Time Scale’ drop-down menu allows the user to toggle the x-axis scale of the chart between ‘Months’ and ‘Fiscal Year.’  Data are displayed for data points on graph when the cursor is placed on the point. Kevin Long, 17 July 2013

The following slides provide information related to Variance Narratives Variance Narratives Kevin Long, 25 March 2015, Slide 27

Applied at Control Account level for external reporting (NSF) Applied at work package level internally (eCAM) as leading indicators Programmed into eCAM notebook Variance Narratives Thresholds Kevin Long, 19 June 2013, Slide 28

Variance Narratives Kevin Long, 19 June 2013, Slide 29  Drop-down menus under ‘Narrative Required’

Variance Narratives VARs and Leading Indicators Kevin Long, 19 June 2013, Slide 30  Red at the control account level = Variance Analysis Reports (VARs) Two narrative categories are required: »Explanation »Corrective Action Reported to NSF Narratives are reviewed by Project Manager  Yellow at any level = Leading Indicator

Variance Narratives Categories Kevin Long, 19 June 2013, Slide 31  The “Light” by each category indicates required fields: Red indicates a category is required and has not been completed Green light indicates a category has been completed  If a category not required, a narrative may still be entered if desired.

Variance Narratives Entering Text Kevin Long, 19 June 2013, Slide 32  Select ‘Narrative Category’ from the drop-down menu.  Enter text into yellow box.  Clicking the ‘submit’ button saves the data to the section below.  The ‘Copy Prior Month Narratives’ button allows you to copy data entered in the prior month for the same control account or work package.  To make corrections, resubmit (the new text overwrites the old).

Variance Narratives Aggregate Narratives Button, Slide 33  The ‘Aggregate Narratives’ button is added to the Variance Narrative section for a control account.  Click the button and the system will collect all ‘Monthly Summary’ for work packages variances under the control account, and put them into the yellow textbox for submission. Kevin Long, 17 July 2013