Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project.

Slides:



Advertisements
Similar presentations
The Pennsylvania State University Department of Architectural Engineering Harrisburg University Academic Center Laurel Heather Warner Construction Management.
Advertisements

Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
Senior Thesis Presentation Carey L. Steckler April 14, 2005 Highland Elementary School Ambridge Area School District Ambridge, Pennsylvania.
North Pocono High School
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
Jeremy Feath Construction Option University Engineering Building Mid-Atlantic University, United States ( Courtesy of Owner)
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Green Modifications Suburban Wellness Center Germantown, Maryland Cory J. Abramowicz.
Duquesne University Forbes Expansion
Presented By: Derek Snover Construction Management.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
Mathew Nirenberg AE Senior Thesis Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Traci Peterson Structural Option Senior Thesis Presentation The Del Monte Center at The North Shore The Pennsylvania State University Department of Architectural.
Reinsurance Group of America (RGA) Global Headquarters Natasha Beck Structural Option Faculty Advisor: Heather Sustersic Images courtesy of Gensler & Tom.
Choosing Atrium Lighting In the new Graduate School of Business Knight Management Center Group 10 Rachel Martin David Mount Leah Strickman Emma Wendt.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Swedish American Hospital Heart and Vascular Center Philip Frederick Structural Option AE Senior Thesis 15 April 2008.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
Choosing Atrium Lighting In the new Graduate School of Business Knight Management Center Group 10 Rachel Martin David Mount Leah Strickman Emma Wendt.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
A MERICAN A RT M USEUM Northeast, United States Sean Felton | Structural Advisor: Sustersic AE Senior Thesis 2013.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
the Franklin Square Hospital Center
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Adam Finley Construction Management
Presentation transcript:

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Summary Acknowledgments Kendall Slivka Construction Management Advisor: Robert Leicht

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments General Building Data LocationRt 715 & Railroad Drive Pocono Township, Monroe County, PA OccupantNorthampton Community College FunctionGymnasium, Fitness Center, Cafeteria, Conference Rooms Size68,000 SF Number of StoriesOne Story with Basement Dates of ConstructionJanuary January 2014 Project Delivery MethodDesign-Bid-Build Cost$18 Million LEED certificationSilver

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments “We believe that learning thrives when there is a sense of curiosity and excitement about the world in which we live. As such, we value: Excellence, Innovation, Sustainability, Accountability, Integrity, and Engagement.”

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Braced Frame Analysis Structural Breadth Fire Suppression System Mechanical Breadth Roofing Membrane Analysis Project Delivery Research

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Braced Frame Analysis Structural Breadth Fire Suppression System Mechanical Breadth Roofing Membrane Analysis Project Delivery Research

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Braced Frame Analysis Structural Breadth Fire Suppression System Mechanical Breadth Roofing Membrane Analysis Project Delivery Research

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Braced Frame Analysis Structural Breadth Fire Suppression System Mechanical Breadth Roofing Membrane Analysis Project Delivery Research

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Problem Statement: Braced walls interfere with building expansion and curtain walls. Research Goal: Resize columns to withstand load, and compare costs of each alternative.

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Current System Estimate: FrameLocationSizeLength Unit Weight (lb/ft) Total Weight (tons) BF 18 and 9W14X HSS8X8X5/ W14X HSS8X8X5/ W14X HSS8X8X5/ W12X W12X BF 2D and CW24X HSS8X8X1/ W14X HSS8X8X1/ W21X W10X W10X System Estimate $84,000

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments System Estimate $94, 300 Proposed System Estimate:

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Problem Statement: The system being used seems redundant and will be expensive. Research Goal: Redesign the system so that only one layer of sprinkler heads is needed.

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Current System Estimate: System Total $239,500

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recommendations Acknowledgments Proposed System: - Wet System - Code Requirements Remain Same - Keep Water Storage Tank - Paint Exposed Ceiling Space System Total $187,500

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recommendations Acknowledgments Problem Statement: The single-ply TPO system may not be able to withstand the mixture of environmental factors and sloped angles. Research Goal: Determine a new system that is proven to work, and will be economical.

Roof TypeRoof SectionArea (ft2) 1B B B B9940 1B B11770 SUM B B B B SUM A8501 2A A13440 SUM1585 Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Current System: Single Ply TPO 4” insulation (2B) 1½” insulation(2A) Modified Bitumen 4” insulation (1B) System Estimate $246,800

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recomendations Acknowledgments Proposed System: Modified Bitumen 4” insulation 1 ½” insulation System Estimate $307,570

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recommendations Acknowledgments Problem Statement: Constructability issues with retaining wall show a larger issue with the use of multiple prime contractors. Research Goal: Study industry feelings toward multiple prime contracts to gauge what would be a better delivery method.

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recommendations Acknowledgments Multiple Prime Contracts: -Pennsylvania Separation Act Projects > $4,000 -Separated between 4 trades -Publically Bid -Risk stays with owner Owner Electric HVAC GC Plumbing CM

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recommendations Acknowledgments Industry Survey: - Most polled from Pa - Majority CM, contractor - Prefer design-bid-build - Prefer GMP contract - Most familiar with CM at risk/multiple prime

Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project Delivery Study Final Recommendations Acknowledgments Braced Frame Analysis Fire Suppression Redesign Roofing System Analysis Delivery Method Study

I’d like to thank everyone involved with my Thesis project; - Team members at D’Huy Engineering, most especially Jim Hana and Joseph Herman. Thank you for taking the time to walk me through the site every chance you got, and thank you for your availability. - Rob Leicht, thank you for always steering me in the right direction. - Northampton Community College for allowing me to use their project - All participants in the industry survey - My structural option friends that helped with my structural systems - My sisters for helping me concentrate and keeping me focused - My family for always encouraging me.