4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, 2012 1 THEMIS Operations & Anomalies Manfred Bester.

Slides:



Advertisements
Similar presentations
1 Architecture and Planning Strategies for Addressing Radiation, Space Weather, and Space Climatology Impact on NASA Missions Study Sponsor - NASA Office.
Advertisements

Michael Lampton Overview of Space Sciences Laboratory 16 July 2003.
Earth’s Radiation Belt Xi Shao Department of Astronomy, University Of Maryland, College Park, MD
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
AIAA Panel on Small, Distributed, Fractionated Spacecraft 1 Long Beach, CA Sept. 18, 2007 Introduction THEMIS Overview Lessons Learned Importance of a.
Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus – A Mission to Touch the Sun Rob Decker and Nicky Fox Johns Hopkins Applied Physics Laboratory.
I n t e g r a t e d D e s i g n C e n t e r / M I s s I o n D e s I g n L a b o r a t o r y N A S A G O D D A R D S P A C E F L I G H T C E N T E R Do.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
Bits and Pieces. Spacecraft Systems Propulsion –Already discussed Communications Science instruments Power.
THEMIS and ARTEMIS David G. Sibeck THEMIS Project Scientist NASA/GSFC 2/17/2007 Cape Canaveral.
SSL-SWT 1 Aug 6-8, 2007 THEMIS Extended Phase Summary of THEMIS team discussions (Please note: this is work in progress)
ARTEMIS’s Planetary Goals 1 June 13, 2008 THEMIS Extended Phase = THEMIS baseline + ARTEMIS ARTEMIS Lunar Exploration.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
ORBITALS Phase A Extended Interim Meeting U of A Phase A2 Work Update ORBITALS Science Team, University of Alberta CSA HQ, St. Hubert, 2010/03/17.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
Space Science MO&DA Programs - September Page 1 SS It is known that the aurora is created by intense electron beams which impact the upper atmosphere.
DSL Distributed Systems Laboratory ATC 23 August Model Mission: Magnetospheric Multiscale (MMS) Mission Goal “To study the microphysics of three.
THEMIS Workshop 1 UC Berkeley, 18 December 2004 Data Products and Access Tim Quinn UC Berkeley.
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
1 THEMIS Inner Magnetosphere Review, Dec 20, 2008 Summary of THEMIS results in the inner magnetosphere Future mission operations discussion: –Science targets.
THEMIS IDPU FSW 11/29/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey Michael Ludlam.
TIM 1 UCB, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting Dr. John Wygant, UMN Dr. John Bonnell, UCB Peter Harvey, UCB.
29 May 2008 Exploration Technology Development Program’s Radiation Hardened Electronics for Space Environments (RHESE) Andrew S. Keys, James H. Adams,
ARTEMIS from a Planetary Perspective 1 September 9, 2008 THEMIS Extended Phase = THEMIS baseline + ARTEMIS Vassilis Angelopoulos, and the ARTEMIS team.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
EGU General Assembly 2006, 2-7 April, 2006, Wien ST6 Multi-point measurements of solar-terrestrial plasma: results and future perspectives Scientific objectives.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
Lander Experiment ROMAP
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
S. Frey, UCB, THEMIS 1 25th ISSFD, Munich, Germany, Oct.19-23, 2015 ARTEMIS THEMIS ARTEMIS The Revised Concept of the THEMIS and MMS Coordination Sabine.
Dec 1, FIELDS Top Level Requirements Review S. Harris (UCB)
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
How ARTEMIS Contributes to Key NLSI Objectives C.T. Russell, J. Halekas, V. Angelopoulos, et al. NLSI Lunar Science Conference Ames Research Center Monday,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
ARTEMIS Independent Integrated Review 1 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS Science Vassilis Angelopoulos ESS/IGPP UCLA and SSL/UCB.
TRIO-CINEMA 1 UCB, 2/08/2010 LVPS & Switching Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Acceleration, Reconnection, Turbulence and Electrodynamics of Moon's Interaction with the Sun.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
THEMIS SRR Mission Requirements - 1 UCB July MISSION REQUIREMENTS Ellen R. Taylor Mission Systems Engineer Space Science Laboratory University.
Lunar Surface Atmosphere Spectrometer (LSAS) Objectives: The instrument LSAS is designed to study the composition and structure of the Lunar atmosphere.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
한 미 려 – Introduction (1) 2.Instrument & Observe 3.Science 2.
THM+ART Senior Review 1 Apr 8, 2008 THEMIS Extended Phase = THEMIS baseline + ARTEMIS THEMIS Senior Review.
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
Mission overview: two spacecraft that target key radiation belt regions with variable spacing
ARTEMIS – solar wind/ shocks
University of California - Berkeley
Space Weather Events Linked to Human Activity
THEMIS program: an Overview
THEMIS and ARTEMIS Status
ACS UC Berkeley Space Sciences Laboratory
MMS enters Phase 2b to study Magnetic Reconnection on Earth’s Dark Side On 9 February 2017, NASA’s Magnetospheric Multi-Scale (MMS) mission began a three-month.
NASA’s ARTEMIS Mission
THEMIS baseline + ARTEMIS
Presentation transcript:

4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester Space Sciences Laboratory University of California, Berkeley Space Sciences Laboratory University of California, Berkeley

4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, Overview THEMIS & ARTEMIS Mission Orbits Spacecraft Design Relevant Requirements Space Weather Related Anomalies Anomaly Distribution vs. Solar Cycle Summary

4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Mission Orbits: 2007 – Probes in synchronized orbits with periods of 4, 2, 1, 1 and 4/5 days Conjunctions formed in magnetospheric tail every 4 days Launched on Feb. 17, 2007 Time History of Events and Macroscale Interactions during Substorms (THEMIS) NASA Medium-class Explorer Mission Managed in PI Mode by U.C. Berkeley

4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, Extended Mission: Since 2009 Time History of Events and Macroscale Interactions during Substorms (THEMIS): 3 Probes (A/P5, D/P3, E/P4) in synchronized Earth orbits with ~1-day periods Acceleration, Reconnection, Turbulence and Electrodynamics of the Moon’s Interaction with the Sun (ARTEMIS): 2 Probes (B/P1, C/P2) departed Earth in 2009, lunar libration orbit phase in 2010/2011, in lunar orbits since 2011

4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, Relevant Requirements REQUIREMENTSYSTEM DESIGN M-1. The THEMIS operational system shall be designed for at least a two year lifetime. Compliance. All flight systems are designed and analyzed for two year lifetime. Demonstrated on orbit M-3. THEMIS shall be designed for a total dose environment of 33 krad/year (66 krad for 2 year mission, 5mm of Al, RDM 2) Compliance. Radiation analyses performed. Performance Assurance and Implementation Plan (PAIP) THM_pa_001A.doc Version A-2003-Sept 30 Signed-Off. Demonstrated on orbit M-4. THEMIS shall be Single Event Effect (SEE) tolerant and immune to destructive latch-up. Compliance. Radiation analyses performed. Performance Assurance and Implementation Plan (PAIP) THM_PA_001A.doc Version A-2003-Sept 30 Signed-Off. Demonstrated on orbit M-5. To the maximum extent possible, THEMIS operational system shall be designed to be single fault tolerant and still meet minimum mission success criteria. Compliance. Single point failures, reliability and possible failure modes have been assessed through Fault Tree Analyses, PRAs, and preliminary FMECA. In addition, THEMIS is inherently single point tolerant by virtue of M- 6, constellation redundancy and use of on-orbit spare. Demonstrated on orbit M-6. THEMIS Probe 3 or 4 shall be capable of replacing any other probe during the minimum mission. Compliance. Replacement margin (>50%) has increased considerably since CSR with optimized mission design. Note: P3/P4 replacement of P1 does not have to take it through a second year (since minimum mission is obtained in one year). Forward runs for replacement strategies still to be completed. Demonstration on orbit was not required Note: The THEMIS spacecraft were designed for Earth orbits!

4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, Spacecraft Bus & Instruments Fields and Waves Instruments (3) Fluxgate Magnetometer (FGM) DC and low-frequency magnetic fields Search Coil Magnetometer (SCM) AC magnetic fields Electric Field Instrument (EFI) Electric fields and waves Particle Instruments (2) Electrostatic Analyzer (ESA) Low-energy ions and electrons Solid State Telescope (SST) High-energy ions and electrons Stowed and Deployed Configuration Interior Layout of Probe Bus and Instrument Suite

4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, Spacecraft Bus & Instrument Electronics Radiation Sensitive Electronics Spacecraft Bus General Dynamics ColdFire processor (8.388 MHz) SRAM for active code and data (512 kBytes) EEPROM for default FSW and parameters (512 kBytes) SUROM for initialization (16 kBytes) Bulk memory array (SDRAM, 64 MBytes) FPGA in Power Control Module (PCM) Instrument Suite Harris 80C85ARH processor (2.0 MHz) SRAM for active code and data, segmented and shared with FPGA (8x128 kBytes, Honeywell HX6228) NV memory for default FSW and parameters (8x128 kBytes, 28C011) Boot ROM (8x8 kBytes, Raytheon R29793) SSR (SDRAM, 256 MBytes) with periodic scrubbing for errors

4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, Space Weather Related Anomalies Anomalies Likely Related to Space Weather Seen On-orbit Spacecraft Bus BAU processor warm or cold resets BAU processor communications losses with PCM FPGA BAU bulk memory scrub errors Instrument Suite IDPU processor resets IDPU SSR excessive ECC single or multiple errors IDPU LVPS over-current trips in Earth and lunar orbits

4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, Spacecraft Bus Anomalies Relevant Spacecraft Bus Anomalies Encountered Since Launch ID ProbesAnomaly DescriptionOperational Impact Work-around / Mitigation Risk Level 11, 15, 18, 21, 31, 34, 36, 44, 47, 48, 54, 55, 57, 58, 63, 68, 71, 72, 73 THA: 3, THB: 0, THC: 2, THD: 7, THE: 7 BAU ColdFire processor warm and cold resets likely caused by SEUs 2007: 3x, 2008: 1x, 2009: 3x, 2010: 3x, 2011: 5x, 2012: 4x Engineering and science data loss; temporary service loss Run reset recovery procedures Low 9, 20, 22, 27, 33, 40, 41, 42, 43, 46, 51, 53, 67, 69, 75 THA: 1, THB: 1, THC: 1, THD: 10, THE: 2 BAU ColdFire processor loses communications with the PCM FPGA 2007: 1x, 2008: 3x, 2009: 1x, 2010: 6x, 2011: 1x, 2012: 3x Engineering and science data loss; temporary service loss Run recovery procedures that include forcing a BAU cold reset Low 24THE: 1BAU bulk memory scrub errors 2008: 1x Bad data in single or multiple memory cells Wait few days until problem subsides, or power cycle SSR otherwise Low A total number of 76 anomalies were seen to date across all five spacecraft. This amounts to 2.75 anomalies per spacecraft per year to date. About 67% of these may be related to space weather effects.

4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, Instrument Anomalies Relevant Instrument Anomalies Encountered Since Launch ID ProbesAnomaly DescriptionOperational Impact Work-around / Mitigation Risk Level 52THC: 1IDPU processor reset and instruments went into safe mode 2010: 1x Instruments went into safe mode; few hours of instrument downtime and science data loss Ran reset recovery procedures Low 13, 19, 30, 35, 38, 49, 70, 76 THA: 0, THB: 1, THC: 5, THD: 1, THE: 1 IDPU SSR experiences errors in single or multiple memory cells 2007: 1x, 2008: 1x, 2009: 3x, 2010: 1x, 2011: 0x, 2012: 2x Bad data in single or multiple memory cells Wait few days until problem subsides, or power cycle SSR otherwise Low 28THD: 1IDPU LVPS over-current trip, likely caused by SEU in ETC FPGA 2008: 1x Instruments went into safe mode; few hours of instrument downtime and science data loss Power cycled IDPU and instruments Low 60, 61, 62, 64, 65, 66 THB: 1, THC: 5IDPU LVPS over-current trips near periselene passages 2011: 5x, 2012: 1x Instruments went into safe mode; few hours of instrument downtime and science data loss Closed attenuators in front of Solid State Telescope (SST) instrument around periselene Low

4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, Anomaly Distribution versus Solar Cycle Anomalies per year:

4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, Summary THEMIS has been on-orbit since February 2007 Primary mission successfully completed in 2009 Two probes transferred to lunar orbits Three probes continue to operate in Earth orbits Radiation belt crossings twice daily in Earth orbits UCB operations team monitors space weather Experienced space weather related anomalies Some anomalies appeared after SWC issued alerts Number of events increased with activity in solar cycle Flight operations team developed recovery procedures Minimal instrument downtime and science data loss No permanent damage seen so far