The ILC and DESY 5th Workshop on Scientific Cooperation JINR, Dubna January 2005 R.-D. Heuer, DESY and Hamburg Univ.

Slides:



Advertisements
Similar presentations
Position of the Czech Republic on the European Strategy in Particle Physics Current main activities in particle physics * Plans for the future Recommendations.
Advertisements

European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Nick Walker KEK-DESY meeting 7 th March 2005.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Personal Perspectives on the ITRP Recommendation and on the Next Steps Toward the International Linear Collider Barry Barish PAC Annual Meeting Knoxville,
Nailing Electroweak Physics (aka Higgs Hunting) with the Next Linear Collider Bob Wilson High Energy Physics Group CSU Physics Research Evening November.
Strategies for Future Acclerators Barry Barish Elba 23-May-06.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
GDE expectations from the SRF community Barry Barish Cornell SRF Mtg 15-July-05.
Basic Science in 21 st Century August 2007 For the Taiwan People M. Koshiba.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
Dean Karlen University of Victoria & TRIUMF APS NW Section Meeting 2005 Victoria, Canada.
The International Linear Collider Barry Barish iThemba Cape Town 21-Oct-05.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
Technology Breakthroughs and International Linear Collider Barry Barish AAAS Annual Meeting Washington DC 19-Feb-05.
1 EPP International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
1 Albrecht Wagner, EPP2010, 16 May 2005, Chicago ILC - International Cooperation and Coordination The Point of view of DESY and Germany Albrecht Wagner,
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
1 ECFA/DESY Workshop, Prague, Status of the TESLA Proposal R-D Heuer, Univ. Hamburg and: International Detector R&D.
CLIC detector & physics study “news from the ET ” Lucie Linssen L. Linssen, IB meeting, 18 April
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
1 Albrecht Wagner, EPS Aachen, 19 July 2003 Road Map for High Energy Physics The DESY View The strategy for the DESY programme is based on three elements:
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
CERN and the Future of Particle Physics R.-D. Heuer CERN Seminar at Tsinghua University, Beijing, April 23, 2009.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
1 Tunnel implementations (laser straight) Central Injector complex.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
Accelerators in our Future ILC and Beyond Barry Barish Caltech Neutrino Telescope - Venice 13-March-09.
The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY Report from DESY, Hamburg, Germany.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
Introduction European Roadmap process results implementation Outlook  a personal selection CERN and the Future of Particle Physics R.-D. Heuer, Univ.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
1 TESLA Collaboration Meeting at INFN-LNF Status and Plans for TESLA: X-FEL and LC Albrecht Wagner Frascati, 26 May 2003.
CLIC Organogram CLIC Collab. Board L.Rivkin MoU with annexes describing coll. efforts (note: in reality more complicated) CLIC SC (Stapnes) Repr. from.
Past Present Future The High Energy Frontier R.-D. Heuer, CERN Joint EPS-ECFA meeting, July 18, 2009.
The Linear Collider Roadmap IWLC2010 CERN October 18, 2010 Rolf-Dieter Heuer CERN.
ITRP Linear Collider Technology Recommendation George Kalmus ECFA Study Meeting Durham, 1 st Sept 2004.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Status and Plans of TESLA
LCC L. Evans, Santander, 2nd June 2016
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Future Collider Projects at CERN
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
Yasuhiro Okada, Executive Director, KEK
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

The ILC and DESY 5th Workshop on Scientific Cooperation JINR, Dubna January 2005 R.-D. Heuer, DESY and Hamburg Univ.

Standard Model today enormously successful: ● tested at quantum level ● (sub)permille accuracy But: many key questions open ● origin of electroweak symmetry breaking ● unification of forces ● extra space dimensions ● origin of dark matter/energy ● …. (LEP/SLC/Tevatron…)

There are two distinct and complementary strategies for gaining new understanding of matter, space and time at future particle accelerators HIGH ENERGY direct discovery of new phenomena i.e. accelerators operating at the energy scale of the new particle HIGH PRECISION Access to new physics at high energies through the precision measurement of phenomena at lower scales Next steps at the energy frontier © Physics Today Prime example for this synergy: LEP / Tevatron

Electron-Positron Linear Collider offers ● well defined initial state collision energy √s well defined collision energy √s tuneable precise knowledge of quantum numbers polarisation of e - and e + possible ● Clean environment collision of point-like particles → low backgrounds ● precise knowledge of cross sections ● Additional options: e - e -, eγ, γγ collisions Machine for Discoveries and Precision Measurements The power of e + e - Colliders

 Accelerator with high luminosity  Detector for precision measurements ZHH Requirements from Physics ● Selection of rare processes (e.g. σ = 0.3 fb for ZHH) ● Precise reconstruction of momenta of leptons, photons, jets, missing energy

Ex.: Higgs physics Recoil mass spectrum ee -> HZ with Z -> l + l - model independent measurement Precision measurements of Higgs couplings Precise enough to distinguish SM Higgs from e.g. MSSM Higgs

A world-wide consensus has formed for a baseline LC project in which positrons collide with electrons at energies up to 500 GeV, with luminosity above cm -2 s -1. The energy should be upgradable to about 1 TeV. Above this firm baseline, several options are envisioned whose priority will depend upon the nature of the discoveries made at the LHC and in the initial LC operation. Substantial overlap in running with LHC recommended International Consensus

International Consensus cont‘d Study groups of ACFA, ECFA, HEPAP The next large accelerator-based project of particle physics should be a linear collider US DOE Office of Science Future Facilities Plan: LC is first priority mid-term new facility for all US Office of Science ACFA, ECFA, HEPAP (January 2004) The chairs reaffirmed their community’s priorities for a 500 GeV linear collider operated in parallel with the LHC Major Funding Agencies Regular meetings concerning LC

International Consensus cont‘d OECD Ministerial Statement (January 2004) “…noted the world wide consensus of the scientific community, which has chosen an electron-positron linear collider as the next accelerator-based facility to complement and expand on the…LHC…” ICFA (i.e. CERN,DESY,FNAL,KEK,SLAC etc) ( February 2004) reaffirms its conviction that the highest priority for a new machine for particle physics is a linear electron-positron collider with an initial energy of 500 GeV, extendible up to about 1 TeV, with a significant period of concurrent running with the LHC

ILC: Machine

Next Milestones towards an International Linear Collider 2004 Selection of Collider Technology (warm or cold) and setting up of an international project team with branches in America, Asia and Europe Continuation of discussion between funding agencies Further studies of organisational structures 2005 Start of work of project teams (‚Global Design Initiative‘) 2006 Completion of the project layout (CDR) including costing 2007/8 Submission of TDR to governments to go ahead with LC 2009 Start major spending 2015 Start of commissioning planning early 2004

The large cavity aperture and long bunch interval simplify operations, reduce the sensitivity to ground motion, permit inter- bunch feedback, and may enable increased beam current. The main linac and rf systems, the single largest technical cost elements, are of comparatively lower risk. The construction of the superconducting XFEL free electron laser will provide prototypes and test many aspects of the linac. The industrialization of most major components of the linac is underway. The use of superconducting cavities significantly reduces power consumption. Technology decision ITRP recommended that the ILC be based on superconducting RF technology developed by the TESLA collaboration Rationale: ICFA unanimously accepted this recommendation August 2004

Next Milestones towards an International Linear Collider First ILC Workshop November 2004 at KEK - first meeting after the technology decision - attended by > 220 accelerator experts from Asia, America, Europe - very constructive and stimulating atmosphere - working groups established to prepare for the ILC design parameters and to address the most urgent R&D issues

Next Milestones towards an International Linear Collider 2004 Selection of Collider Technology: done Continuation of discussion between funding agencies: FALC 2005 Start of work of project teams (‚Global Design Initiative‘) Project leader to be appointed February 2005 Next ILC Workshop: August 2005 (Snowmass) 2006 Completion of the project layout (CDR) including costing 2007/8 Submission of TDR to governments to go ahead with LC 2009 Start major spending 2015 Start of commissioning Status today ….on track…

ILC: Detector

High precision measurements demand fundamentally new approach to the reconstruction: particle flow (i.e. reconstruction of ALL individual particles) requires unprecedented granularity in three dimensions R&D needed NOW for key detector components vertex tracking calorimeter ILC Detector R&D high statistical power of LC has to be met by high detector resolution (limit systematics)  Presentation by W. Lohmann, A. Olchevski

Detector R&D: R&D for detector components Detector Concept Studies: optimisation of the full detector design Detector Concept Studies needed for cost estimates and TDRs in the context and timeline of the GDI activities at present three detector concept studies ongoing: - one based on SI tracking - two based on gaseous tracking These detector studies should preserve the already existing detector technology collaborations which address R&D on detector technologies to first order detector concept independent  Detector R&D collaborations can/should contribute to multiple detector concept studies ILC Detector Concept Studies

ILC at DESY Machine Detector + Physics

ILC is highest priority after HERAII for HEP at DESY  Leading role of DESY in accelerator, physics and detector in this global effort  Plan to set up a European ILC centre at DESY DESY‘s strategic role - Scientific contributions (accelerator, physics, detector) - Coordination and steering - Infrastructure for accelerator and detector design and construction, computing, analysis centre - Connection with Research and University Institutes Central role from the very beginning and in future throughout all phases of the ILC project ILC at DESY

DESY ILC Project Group Accelerator - Experimentation - Physics High Gradient Cavities Cryo Modules Operability, Reliability, Controls Stabilisation, Vibration LLRF Diagnostics GAN Accelerator Physics and Design Computing Detector Scientific Program Connection to XFEL

Detector R&D and Concept Studies at DESY Detector R&D in international collaborations: TPC Hadronic Calorimeter (scintillator based) Forward Calorimetry Vertex Detector Detector Concept: emphasis on gaseous tracking Infrastructure for detector studies: Electron testbeam Teststand with 5T magnet

ILC machine activities at DESY - Technology related high quality, high gradient cavities and modules module test stand … - Technology independent (polarised) positron source reliability issues luminosity performance Global Accelerator Network … - Exploitation of Synergy XFEL ILC - Backbone: TESLA Test Facility

European Design Study Towards a Global TeV Linear Collider - Focus on technology independent R&D items - Scientific coordination jointly by CERN and DESY Within the framework of the European Union: ILC machine activities at DESY

Duration: 3 years Start foreseen: 01 Jan 2005 Total Budget: M€ EU requested: M€ (approved: 9 M€) 23 Participating Laboratories and Institutes (France, Germany, Italy, Sweden, Switzerland, United Kingdom, plus CERN) 8 Workpackages : Management Beam Delivery System Damping Rings Polarised Positron Source Diagnostics Integrated Luminosity Performance Studies Metrology & Stabilisation Global Accelerator Network Multipurpose Virtual Laboratory EUROTeV more details:

accelerator modules module test / magnets / cryogenics linac components (injector, bunch compressors, diagnostics, dumps) Photons FEL concepts Controls / Operability Infrastructure (site, civil construction, survey, tunnel layout, utilities) Safety Organisation Synergy ILC and XFEL Note synergy!

250 m RF gun FEL experimental area bypass 4 MeV150 MeV450 MeV 1000 MeV undulator s collimator bunch compressor Laser M1 M2 M3 M4M5M6M7 bunch compressor The TESLA Test Facility Beam time: ~30% ILC related R&D, ~70% XFEL (experience also for ILC)

DESY will continue its strong role within the global ILC project as a European ILC centre within a network of accelerator laboratories in all areas: - accelerator - detector - physics studies wherever the ILC will be located i.e. Asia, America, or Europe (DESY) Looking forward to a strong collaboration with JINR and Russian Institutes Summary