TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU 108288 Chambers, detector ELMB 2..4500.

Slides:



Advertisements
Similar presentations
22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
1 DCS Cost DCS Workshop L.Jirden u Central DCS cost u Detector DCS cost.
The Detector Control System – FERO related issues
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
TPC Very High Voltage Control Status report Marco Boccioli 20/04/2006.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
MDT PS DCS for ATLAS Eleni Mountricha
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
DCS workshop CERN, Mar 5, 2007 Kai Schweda 1 TRD Status Kai Schweda, University of Heidelberg B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
IDE DCS development overview Ewa Stanecka, ID Week, CERN
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
1 Infrastructure and DCS Presentation of the Infrastructure Controls aspect in the ALICE DCS Based on U ser R equirements D ocument …you should still know.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
ATLAS MDT HV – LV Detector Control System (DCS)
Alice TPC DCS.
TPC Detector Control System
Presentation transcript:

TPC DCS update

CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB PVSS II HVrod Heinzinger 1 High Voltage Low VoltageFEETemp. MonitorVery High Voltage TPC (1) E HVLV E HV S Control room (ACR) 23/01/07 Ethernet switch E E DIMsrv DDL HVrod ELMB 16 VHV Curr. Monitor C ISEG OPCserver PVSS II OPC client 1 Wiener OPCserver PVSS II OPC client ELMB OPCserver PVSS II OPC client 18 CR3 [FED] DIMserver DIMclient PVSS II DIMclient Chambers Gating pulser 72 Calibr. pulser PVSS II Virtual Serial Eth.-RS232 E PS 2 Pulser system 216 PLC 1 Modbus/TCP E 2612 User interface CR3 WTS PVSSII Database(s) C PEAK USB-CAN ACC 1 U C Systec USB-CAN U 6 ACC

LHut SG2 CR3 LHut [Motion] [Laser] SG2 CR5 SG2 UX-C Ethernet TPC (2) VHV rod Cooling Thermal Screen(s) PLC 18? Thermal Screen(s)Laser calibration system. Mirror control Video cameras Gas system PLC Gas E HVrod 4 Cooling Plant (TS) Detector PVSS II DIP [TS/CV] [GWG] Cooling Plant (ch) PLC Chamber Cooling E Chambers, detector 40 PVSS II Modbus/TCP TS/CV SCADA Gas [Vision] DIMserver/ filesystem FrameGrab PVSS II DIMclient Eth.-RS232 DIMserver PicoMotor Laser Video Drift velocity mon. PVSS II Gas PVSS 29/01/ DCS board DIMsrv DIMclient E SG2 [Goofie] DIMserver13 Drift velocity analysis DIMclV.Ser. E E E

HV Status: –PVSS + FSM based on OPC 4.03 –PVSS 3.1 –FSM based on standard from 2005 To Do –PVSS 3.6 –Update to latest OPCnew –Adopt to FSM configurationnew –New USB interface Performance? –Adopt to Oracle DB –Bring closer to Alice standards

LV Status –Version for PL508 incl. FSM –PVSS 3.1 ToDo –PVSS 3.6 –New device: PL512 Similar but details are important for FSM –Adopt to FSM configuration –Adopt to Oracle DB –Bring closer to Alice standards Interlock –soft interlock to shut down FECs –delayed interlock from cooling system

Temperature monitoring Status –System put in operation during pre-commissioning –PVSS 3.1 –Pre-commissioning including Amanda server To Do –Re-cable CAN BUS in-between ELMBs –PVSS 3.6 –New interface –Add FSM Simple: ON/OFF –Adopt to Oracle DB –Finalize Sensor information

FEE Status PVSS –API implementation in PVSS –Panels + Archiving To Do PVSS –Debug + benchmark –Add FSM Mirror of State on level of RCU To Do –System integration FEE Laboratory

VHV Status –Available during pre-commissioning ToDo –Installation in CR4

Pulser Status –Gating pulsers tested –Power supplies + port server available To Do –Power supply Zentro PS with RS232 –Ongoing, prototype PVSS control + FSM –Pulser monitoring + control RS232 –Previous design but HW not yet available DCS Board –Firmware –PVSS integration

Laser system Status –Laser Control used during pre-commissioning –Auto tracker used during pre-commissioning ToDo –Mirror Control –Visualize Frame grabber -> PVSS

Drift Velocity Monitor Status –Hardware + Analyze Software Goofy system stand alone To Do –Integration PVSS –FSM States: ON OFF..

Cooling Status –Cooling plant TS/CV SCADA To Do –Import parameters into sub-detector DCS –Control from sub-detector DCS –Common for all sub-detectors SCY file to configure FW component Interlock pressure valves Connected to DSS Monitoring via DSS

Gas Status –Gas system with control To Do –Import parameters into sub-detector DCS –Common for all sub-detectors interface

DSS System Ambient pressure? –Pressision? Humidity?

FSM Hierarchy GasD Crate OROC HV IROCMISC Ch ROCLASERTEMPFC TPC GPulser VHVRCool Ch Ch Ch TSen Gating PS Ch CalibP CPulser Ch PS Ch Screen SSWCone LaserC PSCalib MirrorC ImageMirror 36x(2x) 36x10x98x??x72x??x +500x GasDCO 2 ROC Detector GAS D mon FERO ESC ECoolLV FED RCU x ESC x …

TPC Commissioning 2007 DCS usage dates limited versionTPC Comm. HVearly May LVend FebruaryMay TempMay FEEMay VHVMay PulserMay/June LaserJune GoofieMay CoolingAprilMay GasMay FSMMarchMay DCS Commissioning Meeting with ACC team