ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19981/18 Presentation to ISO/TC.

Slides:



Advertisements
Similar presentations
International Standards for Software & Systems Documentation Ralph E. Robinson R 2 Innovations.
Advertisements

THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Overview of WG8 and ITS Transit Standards
Chubaka Producciones Presenta :.
Miles Shepherd Chairman ISO Technical Committee 258.
SC38 Liaison Report to SC32 at SC32 meeting, Oct 24-28, 2011 Crete Baba Piprani/Canada SC38  SC32 Liaison 1 ISO/IEC JTC1/SC32/WG2 N1599.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
SECURITY SIG IN MTS 28 TH JANUARY 2015 PROGRESS REPORT Fraunhofer FOKUS.
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
ISO 9001:2015 Revision overview - General users
SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Mike Dolan – ABSTRACT: This contribution.
Revision of ISSAI 30 INTOSAI Code of Ethics
Bridging : FGO and ISO/IEC JTC 1/SC 32/WG2 Interim Meeting Krakow, Poland, October 16, 2012 Dongwon Jeong, Kunsan National University
A Temporal Quiz ” I’m the beginning of the end. You see me twice in a week, but not in a day. Once in a year, but twice in a decade. What am I ?”
Interim Solution What it is and how to to use it 21 June 2012.
Christer Eriksson 11 March 2010 JWG1 - Wind Turbine Gearboxes IEC/ISO Design Requirements for Wind Turbine Gearboxes.
Issues for ISO/IEC : Procedure for the Specification of Web Ontology (PSO) ISO/IEC JTC 1/SC 32/WG 2 Interim Meeting London, UK, November 17, 2009.
The ISO TC211 Standard Project 19130: Sensor and Data Models for Imagery and Gridded Data Liping Di George Mason University Fairfax, VA, USA
Progress report for ISO/IEC DTR Metadata Mapping Procedure(MMP) October, 2012 Tae-Sul Seo and Sung-Joon Lim 1.
SC38-SC32 Liaison Report Berlin SC32 Plenary, Baba Piprani SC32 N2235 Dated: R1.
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
WG9 Report ISO/TC211 Plenary Meeting Montreal, Canada
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /840r2 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
WG8 #7 Meeting Lake Tahoe June 2001 Convenor’s Report WG8 #7 Meeting Lake Tahoe June 2001 Convenor’s Report Producing Standards Relevant to Industry SC24.
ISO/TC 211 Workshop on registry Reston, Sept 2000 This workshop will focus on the requirements for registries and related mechanisms within the scope of.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
Slide 1 IEEE DySPAN-SC WG April 19 th 2012 Telephone Conference Agenda Date: DCN: NameCompanyAddressPhone Michael.
ISO/IEC JTC 1/SC 32 Plenary and WGs Meetings Jeju, Korea, June 25, 2009 Jeong-Dong Kim, Doo-Kwon Baik, Dongwon Jeong {kjd4u,
ISO Current status of development ​ ​ ISO development process ​1​1.
1 ISO/PC 283/N 197 ISO Current status of development November 2015.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Doc.: IEEE /0240r1 Submission November 2006 Carl R. Stevenson, WK3C Wireless LLCSlide 1 IEEE WG Opening Report – November 2006 IEEE P
Doc.: IEEE r Submission April 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
Doc.: IEEE Submission March 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
DEX Publication Project OASIS PLCS TC Face to Face meeting 10 March 2008 Trine Hansen.
Status report of : Framework for generating ontologies (FGO) ISO/IEC JTC 1/SC 32 Plenary and WG2 meeting Kona, USA, 19 May, 2011 Dongwon Jeong,
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
ISO Liaison Report Hidenori Shinoda 9/28,29/2005 Budapest.
ESA UNCLASSIFIED – For Official Use INSPIRE Orthoimagery TWG Status Report Antonio Romeo ESRIN 15/02/2012.
2016/6/11 1 Liaison Report on ISO/TC215 Hidenori Shinoda 6/29/2007 Berlin.
ISO TC204 WG8 Convenor’s Report Public Transport and Emergency Services April 2006 Busan, South Korea.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
ISO/TC 204 WG 3-Database Technologies
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
ISO TC 108 SC3 Liaison to CCAUV
Months of the Year ©Copyright
ISO TC 108 SC3 Liaison to CCAUV
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
WG 2.B Integrated River Basin Management
UFNPT Planning and Development Work Plan, Milestones and Timelines
ISO/TC211 Plenary Meeting Rome, Italy
Potential Milestones A timeline to finish in one year
ISO TC64/SC4/WG2 May 2011 status
Presented to the CEOS WGISS October 22, 2018
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Transmitted by the IWVTA Informal Group
TGs San Diego Closing Report
McDonald’s calendar 2007.
Work Advancement Meeting WebEx Meeting’s Agenda
November 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: ISO/IEC JTC1 SC6 Liaison Report Date Submitted:
Review plan of the nature reporting – update 6
European Statistical System Network on Culture (ESSnet Culture)
MONTHS OF THE YEAR January February April March June May July August
McDonald’s calendar 2007.
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
2015 January February March April May June July August September
Presented to the CEOS WGISS October 10, 2019
Presentation transcript:

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19981/18 Presentation to ISO/TC 211 Plenary Meeting 24 September 1998 Beijing, China Kees Wevers Convenor WG 5

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19982/18 l initial meeting of Ad-hoc WG 5 - Functional Standards - was held in Ottawa, Canada, 27/28 April 1995 l informal meeting of WG 5 - Profiles and Functional Standards - was held in Reston, USA, 30 August 1995 l first meeting was held in Drammen, Norway, 07/08 December 1995

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19983/18 l second meeting was held in Ottawa, Canada, 16 October 1996 l third meeting was held in Sydney, Australia, 22 January 1997 l fourth meeting was held in Oxford, UK, 29/30 September 1997 l a workshop on Functional Standards, Profiles and Product Specifications was held in Oxford, UK, 01 October 1997

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19984/18 l fifth meeting was held in Victoria, BC, Canada, 09/10 March 1998 l sixth meeting was held in Beijing, China, 23 September 1998

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19985/18 l purpose of WG 5: –to provide the bridge between the base standards under development, and existing standards and products –to provide a mechanism to put the base standards to use l two projects: – Profiles –15854Functional Standards

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19986/18 l international GI standards already exist l on the ISO/TC 211 agenda is the harmonisation of existing standards into profiles of more general standards l main goal of TC 211 is interoperability, for –flow and re-use of information –competition on an equal basis –reduction of costs

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19987/18 l four steps in achieving these goals: –identifying information components from recognised functional standards as input to TC 211 –development of base standards in WGs 1-4 –development of profiles using TC 211 base standards –development of product specifications using TC 211 profiles and base standards

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19988/18 Product Specs  Suite of Base Standards The simple picture Functional Standards harmoni- sation Profiles ISPs

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19989/18 l Work Item on Functional Standards accepted in ballot June 97 l scope: –taxonomy of recognized functional standards –identification of components of these FSs that can be harmonised between themselves and with TC 211 base standards –assistance with development of profiles corresponding to these functional standards l PT leader Debra LaMarque

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September /18 l ad-hoc Project Team meeting in The Hague, The Netherlands, May 1997 l first meeting of Project Team in Oxford, UK, 30 September 1997, embedded in WG 5 meeting l second meeting of Project Team in Victoria, BC, Canada, 10 March 1998, embedded in WG 5 meeting

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September /18 l functional standards identified to-date: –DIGEST(DGIWG) –GDF(TC 204) –S-57(IHO) l SDTS (not a functional standard) contri- buted its modularity concept

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September /18 l technical report Functional Standards, published 20 July 1997: –review of functional standards –mapping of functional standards to the ISO base standards (profiling) –harmonisation of functional standards (introducing the modularity concept for the base standards) –appendices with inputs and guidance for relevant base standards

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September /18 l Work Item Profiles l scope: –definition of guidelines for defining a profile/product within the TC 211 family of standards –establishment of a registration procedure l PT leader: Doug O’Brien

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September /18 l Committee Draft was due for March 1998 l delayed due to recent re-engineering of JTC1 directives (which provide primary input for registration procedure) l new version of document 04 Sep 1998 l presented and discussed in WG 5 meeting in Beijing

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September /18 l contents of document: –explanatory section on profiling –guidelines for creation of profiles –guidelines for creation of product specifi- cations –registration procedure l incorporates modularity concept for the base standards

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September /18 l document status: WG 5 working draft l comments to WG 5 until 31 October 1998 for final WD l procedure part will be discussed with ISO Central Secretariat l depending on result of discussion CD will be created / schedule to be determined

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September /18 l in Beijing fruitful discussions with other WGs/PTs on relationship of Profiles to other WIs, and modularity concept l 2 recent DGIWG proposals for the creation of ISPs were discussed: –purpose: to create awareness for profiles/ISPs –comprise a simple and a complicated ISP

ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September /18 l due to the fact that FSs are continuously evolving, a continuation of the current WI to develop a technical amendment, at stage 0, is proposed