J.C. Sheppard, SLAC Americas Region January 31, 2007 1 ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
The RDR Report Odyssey Nan Phinney SLAC for N^3 team of editors.
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
EUROTeV WP4 Report Polarised Positron Source Jim Clarke, on behalf of the WP4 team DESY Zeuthen STFC (Daresbury and RAL) University of Durham University.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
AAP Review 横谷 LC 定例 Preparation of AAP Review General charge sets the frame Version of early November Rough structure of the meeting has been.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
9/24-26/07 e- KOM Slide 1/20 ILC Polarized e- source RDR Overview A. Brachmann.
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Editing Status of Accelerator Systems R&D, CesrTA, ATF2 as of Sep.10 K. Yokoya.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim ILC GDE Meeting DESY May 30 – Jun2, 2007 Work performed for.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Mark Palmer for the CESRTA Collaboration
Integration Ideas for the Central Region Some old some new
Technical Design Report preparation
ILC Global Design Effort
Central Region Working Group
Update on the JLEIC pCDR
Presentation transcript:

J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing, China J. C. Sheppard SLAC January 31, 2007

J.C. Sheppard, SLAC Americas Region January 31, October 2006: Submitted Cost Reduction Schemes for discussion Single Positron Production Target ½ Correctors and BPMs in Transport Lines Reduced Underground Facilities (19km  5 km Transport Line for Central Injector) Comparison of Undulator Source cost to Conventional Source [reject conventional source] Keep Alive Source Deletion November, 2006 Valencia Meeting to discuss layout: Accepted Cost Reduction schemes Rejected Conventional Source Retain Keep Alive Source Add DR Injection Line Spin Rotators for 30% initial polarization December, 2006 ILC GDE Cost Review Meeting, mainly Technical Systems reports with Global Systems Leaders observing RDR Status ILC GDE Activities Since RAL Meeting

J.C. Sheppard, SLAC Americas Region January 31, January 2007: Review cost and inventory Wrote RDR (mainly Vinod Bharadwaj for e+ with everyone’s participation) Machine Advisory Committee (MAC) review in Daresbury, JM Paterson presented e-,e+ designs February 2007:Beijing ILC GDE Meeting to release RDR, description and cost RDR Status ILC GDE Activities Since RAL Meeting

J.C. Sheppard, SLAC Americas Region January 31, Draft RDR for Beijing After much discussion, the board and the editors have agreed that it will not be possible to produce a satisfactory complete and finished draft by Beijing, given the amount of general editing that we feel still remains to be done. We therefore propose to produce an incomplete reduced scope document as follows: 1. We have concentrated the editing efforts over the last week on a core sub-set of the RDR (see below for details). 2. The current version of this core document has been frozen as of 6PM PST, 30th January, and has been formally handed to the Executive Committee (EC) for review; no further content edits to these draft sections will occur, notwithstanding comments from the EC. RDR Status ILC RDR Status as of January 31, 2007

J.C. Sheppard, SLAC Americas Region January 31, Draft RDR for Beijing 3. At the end of the Beijing meeting, and after review and sign-off by the EC, a PDF version of the core draft will be made available for download to the public. 4. A final draft – including all sections, edited, reviewed and signed-off by the EC – will be made available by no later than April 1st, The final document will be published in summer, 2007, after external review. RDR Status ILC RDR Status as of January 31, 2007

J.C. Sheppard, SLAC Americas Region January 31, Draft RDR for Beijing As of 6PM CST 30th January, the core document is composed of the following sections: I. RDR Introduction II. Accelerator Design II-1 ILC Overview II-2 Electron Source II-3 Positron Source II-4 Damping Rings II-5 RTML II-6 Main Linacs II-7 BDS RDR Status ILC RDR Status as of January 31, 2007

J.C. Sheppard, SLAC Americas Region January 31, Draft RDR for Beijing As of 6PM CST 30th January, the core document is composed of the following sections: III. Technical and Global Systems III-1 Magnets III-2 Vacuum III-3 Modulator III-4 Klystron III-5 Power Distribution III-6 Cavities III-7 Cryomodules III-8 Cryogenics IV. CFS V. Sample Sites VI. Cost and Schedule RDR Status ILC RDR Status as of January 31, 2007

J.C. Sheppard, SLAC Americas Region January 31, Draft RDR for Beijing The remaining sections: II-8 Beam Dynamics II-9 Operations and Availability III-9 LLRF III-10 Instrumentation III-11 Dumps and Collimators III-12 Controls and Timing Systems will continue to be worked on by the editors and authors on a best-effort basis for the Beijing release. The last chapter on the EDR will be started after Beijing. RDR Status ILC RDR Status as of January 31, 2007

J.C. Sheppard, SLAC Americas Region January 31, Draft RDR for Beijing Please also note that the RDR MB and the editors are aware of several technical inconsistencies between the BCD and the current RDR, many of which will require formal Change Control Requests and subsequent review by the CCB. A catalogue of these modifications is being made. Should you identify technical details that fall into this category, please send them to Nobu Toge Plans for bringing the RDR and BCD inline with each other will be discussed at the Beijing meeting. RDR Status ILC RDR Status as of January 31, 2007

J.C. Sheppard, SLAC Americas Region January 31, Draft RDR for Beijing References and supporting documentation The RDR is intended to be a ‘light’ readable document, which describes the machine design in enough detail to support feasibility and the cost estimate. It does not completely reflect the amount of detailed technical work that exists. It is important that this detailed technical work be documented to support the RDR content (references), and before moving on to the EDR phase. We would like to ask all the groups to produce detailed ILC Reports on their respective systems where appropriate. Several of the RDR chapters and sections have been shortened by the editors to maintain a consistent look-and-feel and level of detail to the document as a whole. It is important that the omitted information be captured in standalone ILC Reports, which can then be referenced by the RDR itself. In order to include the references in the RDR, you can request a report number from Max Max will maintain a list of titles, authors and report numbers. The ILC Reports themselves should be completed before April 1st. RDR Status ILC RDR Status as of January 31, 2007

J.C. Sheppard, SLAC Americas Region January 31, Positron System Site Layout Discussions: 2007 Undulator Scheme

J.C. Sheppard, SLAC Americas Region January 31, Positron System Site Layout : 2007 Undulator Scheme

J.C. Sheppard, SLAC Americas Region January 31, Layout of ILC Positron Source: January 2007 Photon production at 150 GeV electron energy K=0.92, =1.15 cm, 147 m long helical undulator, UK design One e+ production station (no backup-- fast target exchange) + KAS Pulsed OMD (shielded target) Reduced number of BPM electronics and correctors in transport lines Keep alive auxiliary source, 10% intensity (500 MeV, 2.05x10 10 e-/bunch, 2625(?) bunches/pulse, 5 pulses/s into ~4 r.l. W-Re spinning target, collection system same as for main positron production, 400 MeV e+ preBoost, inject into e+ 5 GeV Booster) Undulator Scheme

J.C. Sheppard, SLAC Americas Region January 31, Positron System Remote Handling Concept: SLAC,LLNL, CCRLC (Daresbury and Rutherford) Undulator Scheme Target Assembly In Place Target Assembly Lifting Out 1.25 m

J.C. Sheppard, SLAC Americas Region January 31, Positron System Remote Handling Concept: SLAC,LLNL, CCRLC (Daresbury and Rutherford) Undulator Scheme

J.C. Sheppard, SLAC Americas Region January 31, Positron System Spinning Disk Exp & Simulations: ANL, LLNL, SLAC Undulator Scheme Cu Disk NdFeB Magnet Strain Gauges

J.C. Sheppard, SLAC Americas Region January 31, Positron System Spinning Disk Simulations, ANL (Antipov, Gai, Liu) Undulator Scheme

J.C. Sheppard, SLAC Americas Region January 31, Positron System Spinning Disk Simulations, ANL (Antipov, Gai, Liu) Undulator Scheme Copper Disk: SLAC, LLNL exp

J.C. Sheppard, SLAC Americas Region January 31, February-April 2007: Complete RDR and supporting documentation Update BCD to reflect current design February-June 2007: Develop Engineering Design Report Work Plan A Coordinated Global Effort Needs Definition of Deliverables Must include: R&D goals System Engineering Physical Layouts Cost /Schedule for Construction June 2007: Hamburg GDE/LCWS Meeting to finalize global EDR plans Lot’s of Work, Lots of Fun! RDR Status ILC Positron Effort beyond Beijing Meeting