EFCA European Federation of Engineering Consultancy Associations FIDIC 2005 Yann Leblais EFCA President Quality in Procurement Beijing Hotel, Beijing -

Slides:



Advertisements
Similar presentations
The Managing Authority –Keystone of the Control System
Advertisements

The Management of European Structural Funds in Western Scotland ISPA Partners Meeting April 2003 Laurie Russell Strathclyde European Partnership.
Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
1 Eurostat Unit B1 – IT Systems for Statistical Production IT outsourcing in Eurostat – our experience Georges Pongas, Adam Wroński Meeting on the Management.
Session 8 Implementing PPPs
Evaluating public RTD interventions: A performance audit perspective from the EU European Court of Auditors American Evaluation Society, Portland, 3 November.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU PROCUREMENT PROCEDURES FOR THE AWARD OF CONCESSION/PPP CONTRACTS.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Selection of Consultancy Services
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
With the Support of the TEMPUS programme of the European Union Information on PRIUM: Promoting a model of Integrated University in the fYR of Macedonia.
INTERACT ENPI is a project funded by the European Union Summary of the Workshops
Horizontal Research Activities involving SMEs Joachim Ball, European Commission, DG RTD B3 n Co-operative Research n Collective Research General Introduction.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
09/08/2015EU Delegation in Serbia1 103 staff 3th in the World ≈ € 200 million / year in centralized management 1 st in the World.
Opportunities for interregional cooperation in Regional Operational Programmes: Article 96.3.d) of the Common Provisions Regulation INTERACT Future Pilot.
Internal Auditing and Outsourcing
The Lean Sourcing Process
The evaluation of research units at HCERES
Council for Disabled Children May What is Independent Support? A 2-year programme to provide additional support to young people and parents during.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
Implementing the Second Pillar of the Aarhus Convention: Problems Identified in the National Implementation Reports Magda Tóth Nagy, Senior Expert Geneva,
Delegation of the European Commission to Russia 1 RIGA, 26 September 2007 Quality workshop Grant Contracts Irina Kabenina Cross-Border Cooperation & Neighbourhood.
TEMPUS IV- SIXTH CALL FOR PROPOSALS 1 TEMPUS Modernising Higher Education TEMPUS INFORMATION DAY.
Measures to prevent and tackle bullying, based on children's opinions and involvement. The role of ombudspersons. George Moschos, Children’s Ombudsman.
GOVERNMENT OF ROMANIA MINISTRY OF PUBLIC FINANCE MANAGING AUTHORITY FOR COMMUNITY SUPPORT FRAMEWORK Evaluation Central Unit Development of the Evaluation.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
المحاضرة الثالثة. Software Requirements Topics covered Functional and non-functional requirements User requirements System requirements Interface specification.
Long-term twinning seconding and young talents’ involvement for the improvement of land administration development projects Fredrik Zetterquist Managing.
Project implementation under DIS PRESENTATIONby Mr. Gábor Rónaszéki CFCU Hungary 30 November 2006.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
RACS coordination meeting 29 May 2008 Brussels. Review of the functioning of the RACs.
EU TWINNING PROGRAM “SUPPORT TO THE PARLIAMENT OF THE REPUBLIC OF MOLDOVA” Mrs. Eszter Kertészné Gérecz Head of IT Department
Monitoring and Evaluation in Humanitarian Aid: Quality Procedures PROJECT – STRAND 1 – Training and Capacity Building.
Small Business Act survey: SME affirmative actions in the European Member States Dr. Samuël MUGNER Legal advisor Directorate of legal affairs Division.
Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi
Procurement Division Procurement Reform Recommendation #19  “DGS shall authorize individual signature authority for contracting and procurement officials.
IPA Funds Monitoring and Evaluation December Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
Dr Ritva Dammert Director Brussels May 27, 2009 Evaluation of the Finnish Centres of Excellence Programmes
Joint European Commission – IMPEL Seminar on Environmental Inspections Wednesday 17 November 2010 Hotel Le Meredien, Brussels 1.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
Workshop on Implementing Audit Quality Practices Working Group on Audit Manuals and Methods March 2006 Vilnius (Lithuania) Hungarian Experiences.
Cooperationand consortium building Luis Araque de Juan European Commission International Cooperation and Development DEVCO/EuropeAid Unit R.3 Legal Affairs.
The partnership principle and the European Code of Conduct on Partnership.
Technical Assistance Office SOCRATES / Lingua 1 and 2 Information seminar for co-ordinators of successful pre-proposals Carla Donda 28 January 2005.
29 March 2011 Audit Authority Audit Department Ministry of Finance 1.
Guidelines Recommandations. Role Ideal mediator for bridging between research findings and actual clinical practice Ideal tool for professionals, managers,
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
Revised Quality Assurance Arrangements for Registered Training Organisations Strengthening our commitment to quality - COAG February 2006 September 2006.
© Shutterstock - olly Simplified Costs Options (SCOs) The audit point of view.
Best practices related to procurement within a project (for part of the expenditure) implemented by the beneficiary itself (art. 67, par. 4 of Regulation.
BUDGET 4Distribution of budget per phases of the project; 4Itemization of budget; 4Division of budget per source of contribution; 4Division of budget between:
Eligibility and evaluation
Tender Evaluation and Award Process
Preparation of a tender and tender documents
HELLASCO CONFERENCE 2017 The recent developments in the external aid consulting sector September 29, 2017 Ines Ferguson, Chair of EFCA European.
Drafting the Guidelines for applicants
International Open Procedure (1) – PRAG 4.3
Guidelines on participation in EU External Assistance Programmes
Enterprise Content Management Owners Representative Contract Approval
Outcome Harvesting nitty- gritty Promise and Pitfalls of Participatory Design Atlanta, 10:45–11:30 29 October, 2016.
The Lean Sourcing Process
I - General and Financial Rules II - Applicant Eligibility
Italian Presidency of the Council of the EU
Workshop on Decentralised Access to European Microdata
EXTERNAL ASSISTANCE PROGRAMMES
Opening seminar of the project
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Guidelines on participation in EU External Assistance Programmes
EVALUATIONS in the EU External Aid
Presentation transcript:

EFCA European Federation of Engineering Consultancy Associations FIDIC 2005 Yann Leblais EFCA President Quality in Procurement Beijing Hotel, Beijing - China 7 September 2005

2 EFCA on Quality Outcomes in the EU Former and present European Commission policies Elements of a quality debate

3 Former and Present European Commission policies Reform of EC external assistance management: –essential element = deconcentration Commission 1999 – 2004: –putting rules in place and horizontal approach Commission 2004 – 2009: –focus on output and quality

4 Elements of a quality debate 1.Dissemination of information to tenderers 2.Evaluation criteria: too much CV-based 3.Adequate project budgets 4.Same rules for all? 5.Validity of references 6.Definition of conflict of interest

5 Dissemination of information to tenderers (1) Problem description: EC prohibits contacts between tenderers and contracting authorities and EC Delegations Consequently: Quality of proposals decline as the clients needs are not enough known and taken into account Consultants locally present are favoured

6 Dissemination of information to tenderers (2) EFCA recommendation: (Optional) Site visits and clarification meetings (should be the rule for short-listed firms) All documents available should be at the disposal at such clarification meetings Minutes of clarification meetings should be sent to all tenderers

7 Evaluation criteria too much CV- based (1) Problem description: EC requires a minimum of 5 years experience Consequently: Unbalanced age and experience structure in consulting firms In the long run shortage of knowledge and skills

8 Evaluation criteria too much CV- based (2) EFCA recommendation: Develop and implementation of a Junior Expert Programme Additional budgets for young professionals to cover costs on specific projects

9 Adequate project budgets (1) Problem description: Project budgets are sometimes too tight Consequently: Firms cannot commit a majority of permanent staff, including junior staff Therefore, company development and experience is hampered

10 Adequate project budgets (2) EFCA recommendation: Project budgets should be drawn up to allow deployment of a majority of permanent staff

11 Same rules for all? (1) Problem description: Following deconcentration, differences in interpretation of rules by Delegations Consequently: 120 interpretation centres instead of implementation centres Documents in various languages are not identical At their discretion Delegations add specific administrative requirements to tender/award process

12 Same rules for all? (2) EFCA recommendations: Establishment of clear and simple rules and guidelines Establishment of a central help desk in Brussels Improve training in EC Delegations

13 Validity of references (1) Problem description: In most cases selection criteria specify that firms must have references in the last 3 years Consequently: Many SMEs are excluded from tendering Therefore, the potential of capable/qualified companies is limited

14 Validity of references (2) EFCA recommendation: Validity of references should be extended to 5 years for engineering consultancy firms

15 Definition of conflict of interest (1) Problem description: Firms excluded from subsequent project phases based on involvement in earlier stages (except for ToR) Consequently: Disruptive for project itself Multiple selection procedures are expensive and time-consuming for both contracting authority and consultants

16 Definition of conflict of interest (2) EFCA recommendation: Make all preliminary investigation documents available to all participants Restrict that “conflict of interest” to a restricted and well defined list