Transition to 6-person crew ASE conference, Praha Oct 8, 2009 Andreas Schön, ESA All dates used in this presentation are examples only, they do not necessarily.

Slides:



Advertisements
Similar presentations
The International Space Station TO This All Pictures and text from NASA sources, unless otherwise noted.
Advertisements

The Vision for Space Exploration – Challenge & Opportunity ISS Panel Report Robert D. Cabana ISS Panel Chair March 30, 2005.
1 Continuity Planning for transportation agencies.
International Space Station Dane Fujinaka Noa Bryan.
1 IAC Late-Breaking News Analysis of STS-118 Tile Damage Utilizing the Tools and Techniques Developed Since Return to Flight William H. Gerstenmaier Associate.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Inner Guides=Text Boundary Outer Guides=Inner Boundary Asteroid Redirect Mission and Human Exploration Michele Gates Human Exploration and Operations Mission.
C2V2 Technical Requirements and Constraints
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
International Space Station RYAN CRAFTON. International Space Station.
International Space Station Origin: The international space station project began as a cooperative agreement to build and operate a large orbital station.
Copyright © Houghton Mifflin Company. All rights reserved. 6-1 Chapter 6 The Basics of Planning and Project Planning.
Copyright © Houghton Mifflin Company. All rights reserved. 6-1 Chapter 6 The Basics of Planning and Project Planning.
1 Head of Russian Federal Space Agency ISS Program International Cooperation Paris, June 17, 2009.
Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold.
A3 Altitude Test Facility
Select the Perfect Team, using the Job Requirements process  Gary Hewins F.CIPD  Until last Friday 1 Oct Behavioural Development Manager, Sellafield.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
By Alexa Gracias and Marysia Serafin. SCOPE SUMMARY  Need: Further human exploration of the solar system and knowledge.  Goal: To send humans to Mars.
PowerPoint Presentation by Charlie Cook The University of West Alabama Copyright © 2005 Prentice Hall, Inc. All rights reserved. Operations Management.
Title: Humans in Space Topic/Objective: TEKS 7.9B – Identify the accommodations, considering the characteristics of our Solar System, that allows manned.
National Aeronautics and Space Administration Future space missions will take astronauts beyond Earth’s orbit. These exploration missions.
Current Need Aging space shuttle fleet’s retirement is imminent If the ISS is going to continue operation there needs to be a replacement to get humans.
Space unit Life in Space.
Mir Space Station Presented By: David Garnetti. Brief History of Mir The first space shuttle docked with Mir in 1986 The first space shuttle docked with.
Space Station Will it be accessible for You and Me?
Futron Corporation 400 Virginia Avenue,SW Suite 340 Washington, DC Phone Fax NASA PRA Practices.
International Space Station Clayton Wilson. ISS Artificial satellite in low earth orbit. First launched in Largest artificial body component in.
© 2014 Orbital Sciences Corporation. All Rights Reserved. SPRSA Excess Capacity Panel Carol P. Welsch Orbital Sciences Corporation June 10, Welsch.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
By Abbie Lorimer. Travel to space People, animals and satellites have all been used to explore space in the last century. We have also explored space.
Recommendation to Cease NASA Crew Return Vehicle Development April 29, 2004 Amanda KellyBlake HajovskyAnthony Pittman Engineering Technical Communications.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
Need for Commercial Cargo to ISS William Gerstenmaier NASA Associate Administrator for Space Operations FAA Commercial Space Transportation Advisory Council.
Early Space Flight Sustain Life in Space Passenger versus Pilot Duration (4 days) Return to Earth Spacecraft: Vostok Mercury X-15.
China! Sputnik! Early Space Flight Sustain Life in Space Passenger versus Pilot Duration (4 days) Return to Earth Spacecraft: Vostok.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
AAE 450 – Spacecraft Design 1 Solar Power & Docking Options Eric Gustafson 1/18/2005 Power group & docking sub-committee Solar power and autonomous docking.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama PROCESS REVIEW Training.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 21 & 22.
Page No. 1 ISS_CM_019 (Rev 01/2011) Sponsoring Org/Office Code: MIO/OC Name of Forum: POIWG Date: 07/27/2011 Increment Manager/Melissa Owens Increment.
POIWG 1/26/2015 Mana Vautier This presentation is intended solely for the audience to which it is directed. MISSION AND PROGRAM INTEGRATION (MAPI)
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
I29/30 Robonaut Training Strategy Team (TST) Mike Joseph Robonaut Training Coordinator Notice: Material contained.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
NON-PROPRIETARY July NASA Ames Research Center ARC ISS Utilization Office Cell Bio Tech Demo Payload Overview POIWG MSFC July 25, 2012.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Cindy Grant SPACE-X & Orbital Lead POD Office/EO
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
Image right: America’s first astronauts: (front row) Walter M. Schirra Jr., Donald K. "Deke" Slayton, John H. Glenn Jr., Scott Carpenter, (back row) Alan.
SPACE: THE FINAL FRONTIER Sputnik 1 October 4, 1957 First man-made object to orbit Earth, launched by the U.S.S.R., and remains in orbit until January.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increments
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
1 ME Spring 2013 Introduction to Systems Engineering Session 3 Dr. Dan C. Surber, ESEP © Copyright 2013.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
Title: Humans in Space Topic/Objective: TEKS 7.9B – Identify the accommodations, considering the characteristics of our Solar System, that allows manned.
The Future of Human Spaceflight *** A Journey to Mars
Fault Tolerant Computer for the AUTOMATED TRANSFER VEHICLE
The International Space Station (ISS)
An Introduction to the NanoRack Platform and CubeLab Modules
Space Travel Present & Future
Investigation X – Increment 33 & 34 Scenario (it’s only a template)
By: Faith Yizek 9H and Alex Neacsu 9M
Chapter 16 Section 10 How are space stations used?
Key Benchmarks in a LEO Economy Robert L. Curbeam Jr.
The Survival Plan.
Presentation transcript:

Transition to 6-person crew ASE conference, Praha Oct 8, 2009 Andreas Schön, ESA All dates used in this presentation are examples only, they do not necessarily represent the most up to date ISS planning!

What changes ? Onboard resources needs Onboard crew support infrastructure Number of crew transportation and ISS re-supply vehicles needed Onboard operations Ground operations Crew training concept

Onboard resource needs Crew re-supply: - food - water - crew support items - Oxygen / Nitrogen 1 USOS crew / day1 ROS crew / day6-person crew/ months Food + crew supply3.35 kg4.00 kg661.5 kg Water (partially recovered) 4.35 l 783 l Resources for system operations and utilization: - water - High pressure gas for P/L and EVA

Onboard crew support infrastructure Electrical power generation Environmental control and life support system including: - Oxygen generation - Water recovery and recycling Sleeping compartment Hygiene Physical exercise devices

Crew transportation & re-supply vehicles Four Soyuz spacecrafts per year - from exp 22 onwards crew exchange exclusively with Soyuz Mixed fleet of re-supply vehicles (Progress, Shuttle (until 2010), HTV, ATV, new US cargo vehicles) Soyuz, Progress and ATV docking to the ROS: - currently three Russian docking ports available - four Russian docking ports from end of 2009 onwards Station re-boost & DAM capability After shuttle retirement the download capacity will be extremely limited -> change in the ISS maintenance concept

Onboard operations concept change Transfer to segmented operations: - lessons learned from early ISS operations - size and complexity of the station - limit overall time crew will spend in training Every crewmember will be at least “User” for all ISS systems Every crewmember will be trained as “Operator” for emergency response Protect for return to 3-person crew: - critical skill set with each Soyuz crew (SSRMS, CMO, vehicle docking) EVA capabilities - cross-training under discussion Crew H/O may be performed as direct or in-direct H/O

Direct versus in-direct handover Exp 31Exp 33 Exp 32 Exp 31Exp 33 Exp 32 a) Direct Handover b) In-direct Handover leaving and arriving crews overlap on-board for ~ 10 days 3 Soyuz docked to ISS, 9 crewmembers onboard during H/O Full skill set available on ISS Leaving crew will depart from ISS before new crew has arrived For a period of ~ 2 – 3 weeks a three person crew will be onboard ISS During three person period a reduced skill set will be available onboard

Crew training concept Adaptation to segmented ops Change to a new b/u concept to: - reduce overall number of astronauts and cosmonauts in training, since the training facilities and teams can not support a doubling of the number of trainee’s - reduce the time each individual crewmember has to spent in training

“Classical b/u concept” versus SFTL (I) Exp 31 Exp 31 b/u a) Classical b/u concept Continue training for prime crew or collateral duties every prime crewmember has a 1:1 b/u which goes through the training together with the prime every crewmember has to go over the training flow twice; once as a b/u and a second time as a prime (overall training duration: ~ 4.5 years) b/u and prime assignment may be years apart an b/u assignment does not necessarily lead to a prime assignment Exp 31 b/u launches Continue training for later inc or ……

“Classical b/u concept” versus SFTL (II) Exp 31 Exp 33 b) SFTL = Single-flow-to-launch concept Exp 33 launches as accelerated crew in place of exp 31 individual 1:1 b/u’s don’t exist anymore each Soyuz crew is backed up by another Soyuz crew, which is nominally scheduled to launch six months later A crews b/u A crews & B crews b/u B crews every crewmember has to go over the SFTL training flow only once (training duration less than 2.5 years) an assignment to training will nominally lead to launch to ISS Remarks: Both concepts allow the swap-out of individual crewmembers as well as whole crews. The ISS training is currently in transition to SFTL. This process has been nearly finished for the USOS crewmembers, but is still ongoing for the Russian crewmembers. 6 months = one inc

SFTL Training flows Exp 26 assignment Exp 24 launch Exp 26 launch ~ 2 year period 6 months period On-orbit H/O Exp 26 launches in place of exp 24 ~ 2 year periodOn-orbit H/O Exp 26 assignment a) Nominal SFTL flow b) Accelerated launch SFTL flow

Nominal SFTL flow - content Exp 26 assignment Exp 24 launch Exp 26 launch ~ 2 year period 6 months period On-orbit H/O Critical generic task: Soyuz training ISS core systems User & Operator tasks ISS Emergency tasks ORLAN & EMU EVA SSRMS Language (thru intermediate high) Exp 24 inc spec content required for exp 26 (i.e. exp 24 inc spec high value tasks): Exp 24 P/Ls inc spec EVA task HTV & HTV robo US re-supply vehicles (Sp-X, Dragon) ATV subset of launch prep activities Additional generic task: Generic P/L training ISS core systems Specialist tasks Language (thru intermediate high+) Exp 26 inc spec content: Exp 26 P/Ls inc spec EVA task robo 1 st P R I O R I T Y Proficiency & refresher: EVA maintenance run robo proficiency EMER proficiency Soyuz proficiency Visiting vehicles prof. System refresher Exp 26 inc spec tasks: Late P/Ls Late EVAs BDC Launch prep activities: PAO events BDC Mission briefings Baikonur process Generic H/O Functional H/O OJT Normal OBTs: robo prof. EMER drills R&D

Accelerated Launch SFTL flow - content Exp 26 assignment ~ 2 year period On-orbit H/O Critical generic task: Soyuz training ISS core systems User & Operator tasks ISS Emergency tasks ORLAN & EMU EVA SSRMS Language (thru intermediate high) Exp 24 inc spec content required for exp 26 (i.e. exp 24 inc spec high value tasks): Exp 24 P/Ls inc spec EVA task HTV & HTV robo US re-supply vehicles (Sp-X, Dragon) ATV subset of launch prep activities Launch prep activities: PAO events BDC Mission briefings Baikonur process Additional generic task: Generic P/L training ISS core systems Specialist tasks Language (thru intermediate high+) 1 st P R I O R I T Y Generic H/O Functional H/O OJT Normal OBTs: robo prof. EMER drills R&D Remediation OBTs Exp 26 launches in place of exp 24

First 6-Person crew

Expedition sequencing: crew rotation plan