Global Design Effort - CFS 03-26-10 LCWS 2010 1 CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.
Advertisements

Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Marc Ross Nick Walker Akira Yamamoto XFEL – based HLRF scheme 07 Sept 2010 BAW 1 - Backup HLRF 1.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP IWLC10.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Conventional Facilities and Siting Global Group (ARCFS)
Conventional Facility & Siting (CF&S) Overview for the Positron Source
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
ILC GLOBAL SYSTEMS MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
ILC CFS AD&I Daresbury Lab Summary
Tom Lackowski Revised 10/12/2011
Presentation transcript:

Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne

Global Design Effort - CFS LCWS 2010 Primary CFS Goals for LCWS10 Single Tunnel Solution for Main Linac Single Tunnel Solution for Main Linac  Joint Parallel Sessions with Main Linac and HLRF Working Groups  Klystron Cluster System (KCS)  Distributed RF System (DRFS)  Update Criteria for Physical Equipment Size and Spacing  Cyromodule and RF Support Equipment  Waveguide Configuration  Installation and Maintenance Access  Electrical Support, Cable Trays  Electronics Racks Location, Spacing and Shielding  Update Criteria for Cooling and Electrical Requirements  Cooling Water Temperature and DT  Electrical Loading and Access to Connections 2

Global Design Effort - CFS LCWS Current ML KCS Tunnel Cross Sections Americas Region 4.5 m Dia. European Region 5.2 m Dia.

Global Design Effort - CFS LCWS Current ML DRFS Tunnel Cross Sections Americas Region 5.2 m Dia. Asian Region 5.2 m Dia.

Global Design Effort - CFS LCWS 2010 Primary CFS Goals for LCWS10 Central Region SB 2009 Layout Central Region SB 2009 Layout  Joint Parallel Sessions with Sources, RTML, Damping Ring and BDS Working Groups  Update Criteria for Physical Equipment Size and Spacing  Area System Beam Lattices and Equipment Layout  Aisle Spacing and Required Clearances  Installation and Maintenance Access  Electrical Support, Cable Trays  Electronics Racks Location and Spacing in Support Tunnel  Absorber and Dump Locations and Requirements  Update Criteria for Cooling and Electrical Requirements  Cooling Water Temperature and DT  Temperature Stability Requirements in Common Areas  Electrical Loading and Access to Connections 5

Global Design Effort - CFS LCWS D Examples Of Central Region Layout

Global Design Effort - CFS LCWS D Examples Of Central Region Layout

Global Design Effort - CFS LCWS D Examples Of Central Region Layout

Global Design Effort - CFS LCWS 2010 Specific Goals for CFS Working Group General CFS Topics General CFS Topics  Re-establish Area System Contact Network  Joint Session with MDI  Distributed CFS Attendance at Area System Parallel Sessions  Planning for CFS Regionally Specific Utility Design  Finalize Dubna Site Investigation Report  Discussion and Assignment of 2D and 3D Regional Drawing Efforts  Review of Regional Single Tunnel Life Safety and Egress Solutions and Future Work  CFS TDP II Planning Including Resource Availability and Allocation 9

Global Design Effort - CFS LCWS 2010 Specific Goals for CFS Working Group cont. CFS Focused Workshops – Summer 2010 CFS Focused Workshops – Summer 2010  CFS w/Area Systems at SLAC  CFS w/Area Systems at Daresbury (?)  CFS w/ MDI and Detector – TBD At LCWS 2010 At LCWS 2010  Verify Locations  Verify Dates  Re-establish Participation and POC’s 10