1 Weiguo Li Institute of High Energy Physics Sep. 16, 2002 Overview of BEPCII/BESIII PROJECT BESIII International Review Sep. 16-18, 2002, Beijing.

Slides:



Advertisements
Similar presentations
Test Beam at IHEP,CAS ZHANG Liang sheng, Test Beam Group Introduction BEPC/BES Ⅱ will be upgraded as BEPC Ⅱ / BES Ⅲ, it is necessary to do beam test for.
Advertisements

Guoliang TONGTau04,Nara,Septemper 16,20041 Searching for Lepton Flavor Violation Decays J/   e μ, μ τ, e τ at BES Guoliang Tong ( BES Collaboration)
1 Overview of BESII/BESIII/BEPC I Current Status II Recent Results III Future Plans IV Summary Zhengguo ZHAO Dept. of Phys., UM, USA (and IHEP of CAS,
1 Measurement of f D + via D +   + Sheldon Stone, Syracuse University  D o D o, D o  K -  + K-K- K+K+ ++  K-K- K+K+ “I charm you, by my once-commended.
DPF Victor Pavlunin on behalf of the CLEO Collaboration DPF-2006 Results from four CLEO Y (5S) analyses:  Exclusive B s and B Reconstruction at.
Jan 28th, 2009Colin Jessop at Notre Dame An experiment to measure CP violation in B mesons Colin Jessop University of Notre Dame.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
CMD-2 and SND results on the  and  International Workshop «e+e- Collisions from  to  » February 27 – March 2, 2006, BINP, Novosibirsk, Russia.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
Reach of future  -charm efforts at BESIII Yangheng Zheng Graduate University of Chinese Academy of Sciences NTU May 5 - 9, 2008.
1 Weiguo Li Institute of High Energy Physics 2002 年 6 月 5 日 BEPCII/BESIII PROJECT BESIII Collaboration Meeting June 5-6, Beijing.
1. introduction 2. goal of luminosity monitor 3. Structure of BESII Luminosity detector 4. Calculation of the luminosity 5. MC of luminosity detector 6.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
More design Works More simulation to study the physics reaches with BESIII. magnet? solid angle coverage ? Identify several important physics topics, and.
Overview of BES physics Yifang Wang Institute of High Energy Physics.
Qingjin XU Institute of High Energy Physics (IHEP)
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
1 Hesheng Chen Institute of High Energy Physics Beijing , China High Energy Physics in China 1.BEPC/BES/BSRF and latest results 2.BEPCII 3.Particle.
Low energy e + e –  hadrons in Novosibirsk I.Logashenko On behalf of the CMD-2 and SND Collaborations Budker Institure of Nuclear Physics (Novosibirsk,
The BEPCII Project Hesheng Chen Institute of High Energy Physics Chinese Academy of Sciences Outline 1.BEPC/BES and physics results 2.BEPCII 3.BESIII 4.Budget.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Recent results of charmonium decaying into baryons at BESIII Xu Xinping 1,2 ( 徐新平 ) Xu Xinping 1,2 ( 徐新平 ) on behalf of the BESIII Collaboration on behalf.
New Observations on Light Hadron Spectroscopy at BESIII Yanping HUANG For BESIII Collaboration Institute of High Energy Physics (IHEP) ICHEP2010, Paris,
1 Welcome to Charm2006 Welcome to Charm Hesheng Chen Institute of High Energy Physics Beijing , China Scientific Activities at Institute.
1 Welcome to Welcome to International UHE  Neutrino Workshop.
1 Energy loss correction for a crystal calorimeter He Miao Institute of High Energy Physics Beijing, P.R.China.
Tau – Charm Summary Frederick A. Harris June. 16, 2006 Workshop on US/PRC Cooperation in HEP.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
ERHIC design status V.Ptitsyn for the eRHIC design team.
General Review of BES Physics, Achievement and Future Representing BES collaboration Weiguo Li IHEP, CAS MENU 2004 Beijing, Aug. 30, 2004.
1 New Results on  (3770) and D Mesons Production and Decays From BES Gang RONG (for BES Collaboration) Presented by Yi-Fang Wang Charm07 Cornell University,
Charm Physics Potential at BESIII Kanglin He Jan. 2004, Beijing
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Particle Identification at BESIII Kanglin He April 23, 2007, Amsterdam.
1 BEPCII Overview C. Zhang for BEPC Team Institute of High Energy Physics, CAS BEPCII Overview C. Zhang for BEPC Team Institute of High Energy Physics,
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
Review of τ -mass measurements at e + e - - colliders Yury Tikhonov (Budker INP) Contents  Introduction  Current status of τ-mass measurements and μτ.
1 BEPCII/BESIII Frederick A. Harris University of Hawaii QWG Meeting Sept , 2003 Fermilab Representing:
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
First results from CMD-3 detector at VEPP-2000 collider Budker Institute of Nuclear Physics, SB RAS, Novosibirsk, Russia September 2011 E.Solodov (for.
First results from SND at VEPP-2000 S. Serednyakov On behalf of SND group VIII International Workshop on e + e - Collisions from Phi to Psi, PHIPSI11,
LHC Symposium 2003 Fermilab 01/05/2003 Ph. Schwemling, LPNHE-Paris for the ATLAS collaboration Electromagnetic Calorimetry and Electron/Photon performance.
JINR, Dubna 5-9 December, 2011 Current status of luminosity measurements with the CMD-3 detector at VEPP-2000 G.V.Fedotovich BINP, Novosibirsk.
Preliminary Design of Trigger System for BES III Zhen’an LIU Inst of High Energy Physics,Beijing Oct
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Status of BESIII and upgrade of BESIII
Particle Identification (PID) at HIEPA Experiment
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Superconductivity in the BEPCII Performance
BESIII Collaboration Meeting Summary
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
Recent studies on BEPCII longitudinal impedance
Study of New Hadron Spectroscopy at BESIII
PWA of J/pp0 and measurement of J/pp, pp'
New R Values in 2-5 GeV from the BES
Design of Interaction Region
Explanation of the Basic Principles and Goals
Mini-Workshop on BEPCII Background Study
Institute of High Energy Physics Chinese Academy of Sciences
N* Production from J/ decays at BES
Presentation transcript:

1 Weiguo Li Institute of High Energy Physics Sep. 16, 2002 Overview of BEPCII/BESIII PROJECT BESIII International Review Sep , 2002, Beijing

2 Goals of the BESIII review Examine the overall design of BESIII detector, if this design can accomplish the goals? Examine the technical feasibility of detector overall design, the designs of all the sub-systems Suggestions and opinions for important detector design choices, such as the magnet and the EMC Suggestions and comments for further detector design, R&D, detector manufacture, schedule and cost

3  Introduction  BEPCII Design  BESIII Design  BESIII Collaboration  Summary

4 Korea (4) Korea University Seoul National University Chonbuk National University Gyeongsang Nat. Univ. Japan (5) Nikow University Tokyo Institute of Technology Miyazaki University KEK U. Tokyo USA (4) University of Hawaii University of Texas at Dallas Colorado State University Stanford Linear Accelerator Center UK (1) Queen Mary University China (18) IHEP of CAS Univ. of Sci. and Tech. of China Shandong Univ., Zhejiang Univ. Huazhong Normal Univ. Shanghai Jiaotong Univ. Peking Univ., CCAST Wuhan Univ., Nankai Univ. Henan Normal Univ. Hunan Univ., Liaoning Univ. Tsinghua Univ., Sichuan Univ. Guangxi Univ., Guangxi Normal Univ. Jiangsu Normal Univ. Introduction

5 Data Collected with BESI and BESII BES Current Status

6 BESII Detector ( upgrade ) VC:  xy = 100  m TOF:  T = 180 ps  counter:  r  = 3 cm MDC:  xy = 250  m BSC:  E/  E= 22 %  z = 5.5 cm  dE/dx = 8.4 %   = 7.9 mr B field: 0.4 T  p/p=1.8  (1+p 2 )  z = 2.3 cm Dead time/event: 〈 10 ms

7 BES BES Main Physics Results  Precise Mass Measurement of  lepton.  2-5 GeV R measurement.  Systematic study of  (2s) decays.  Systematic study of J/  decays.  Obtain f Ds from Ds pure leptonic decay.  Measure Br(D S   ) in model independent way.  BES has 116 entries in PDG.  BES has 74 invited talk , published 216 papers, 48 papers in world-class journals.

8 Physics Window for BEPC Two major directions in world HEP: – High Energy Frontier : Search for Higgs particle and beyond STM particles and phenomena. – High precision frontier : high statistics and high precision , check STM , search for phenomena beyond STM. Considering the new developments of world HEP, the main physics window for BEPC is precise measurement of charm and charmonium physics, and search for new phenomena. Advantages: huge cross section at J/  and  (2s) resonance simple topology and low background at threshold Important area to study QCD , perturbative and non-perturbative QCD , can search for new physics.

9 BEPC II Physic Goals Precise measurements of J/  、  (2s) 、  (3770 ) Decays Precise measurement of CKM parameters Light quark hadron spectroscopy Excited baryon spectroscopy Other D and Ds physics: –precise measurement of D and Ds decays – measurement of f D, f Ds –D 0 –  D 0 mixing Check VDM, NRQCD, PQCD, study  puzzle

10 BEPC II Physics Goals ( 2 ) Mechanism of hadron production , low energy QCD : precise R measurement  physics : charged current , m  and m  Search for new particles: 1 P 1 、  c ? 、 glueballs 、 quark-gluon hybrid 、 exotic states… Search for new phenomena: – rare decays; – lepton number violation; – CP violation in J/  and  (2s) decays;

11 BEPC Future Development: BEPCII Precise measurements need: – High statistics → high luminosity machine – Small systematic error→ high performance detector BEPC will run at J/  and  (2s) , with huge cross-section, also at  (3770), 4.03 or 4.14 GeV for Ds Need to have major upgrade for machine and detector (BEPCII / BESIII) , to increase machine luminosity by more than one order of magnitude with relatively small budget and in a relatively short time.

12 Competition in tau-charm physics CESR, USA runs at 10GeV for B physics, because it can hardly compete with two B factories , on the other hand, there are important and interesting physics at tau-charm energy region as demonstrated at BEPC, plans to reduce the collision energy by installing a series of SC wigglers, expected lum. ( 1.5 – 3)x10 32 cm -2 s -1 。 VEPP-4M, Novosibirsk, Russia, has a similar plan. BEPC/BES can not enjoy the advantage of unique e+e- collider in this energy region any more , strong competition. BEPC II single ring design can not ensure competitive edge in the race.

13 BEPC II Double ring Design In the existing BEPC tunnel, add another ring, cross over at south and north points, two equal rings for electrons and positrons. Advanced double-ring collision technology. 93 bunches , total current > 0.9A in each ring. Collision spacing : 8 ns. In south, collision with large cross-angle ( ±11 mr ). Calculated luminosity : cm -2 s 3.78GeV. In north cross point, connecting SR beam between two outer rings, in south cross point, use dipole magnet to bend the beam back to outer ring. SR run : 2.5 GeV. Major detector upgrade : BES III. Luminosity of BEPCII is a factor of 3-7 of that of CESRc, more potential, and technically less challenge. Budget increased by 50 %.

14 BEPC Upgrade: BEPC II — double ring e - RF SR e + IP

15 BEPCII Design Goals Increase beam current , reduce beam size

16 Wood Model Space Study for Double Ring

17 Luminosity Increase Micro-  :  y *  =5cm  1.5 cm Super-conducting magnet Impedance red. and SC RF cavity  z  =5cm  <1.5cm D.R.: multi bunches h~400, k b =1  93 (L BEPCII / L BEPC ) D.R. =(5.5/1.5)  93  9.8/35=96 L BEPC =1.0  cm -2 s -1  L BEPCII =1  cm -2 s -1 I b =9.8mA,  y =0.04

18 Means of lum. increase (E = 1.89 GeV) parameterunit BEPC BEPCII  y * cm5.0 ~ 1.5 Bunch number k b 193  y 0.04 Beam current I b mA359.8 factor for lum. increase 1 ~ 100 BEPCII cross-angle collision : 2 x 11mr

19 BEPCII Main Parameters Energy E(GeV)1.89Energy spread(10 -4 ) σ e 5.16 Circumference C(m)237.53Emittance ε x /ε y (nm)144/2.2 Harmonic number h396Momentum compact α p RF frequency f rf (MHz)499.8β * x /β * y (m)1/0.015 RF Voltage V rf (MV)1.5Tunes ν x /ν y /ν z 6.57/7.6/0.034 Energy loss/turn U 0 (keV) 121Chromaticities ν ’ x /ν ’ y -11.9/-25.4 Damping time τ x /τ y /τ z (ms) 25/25/12.5Natural bunch length σ z0 (cm)1.3 Total current/beam I(A)0.91 Crossing angle  (mrad) ±11 SR Power P(kW)110Piwinski angle Φ(rad)0.435 Bunch number N b 93Bunch spacing S b (m)2.4 Bunch current I b (mA)9.8 Beam-beam parameter  x /  y 0.04/0.04 Particle number N t 4.5×10 12 Luminosity(10 33 cm -2 s -1 ) L 0 1.0

20 BEPCII/BEPC/CESRc Comparison

21 BEPCII Key Technologies and Challenges   Linac  Injection rate: 5 mA/min.  50 mA/min.  New positron source  Stability and reliability  E inj = GeV  500MHz SC RF System  SC RF Technology  Power source and low level  Cryogenics…   Injection  Magnets  Power supplies  Vacuum system  SC Q magnet and IP  Beam instrumentation  Control system

22 Linac Upgrade Requirements:  Positron injection rate 5mA/min.  50 mA/min.;  Energy 1.3 GeV  1.55 ~ 1.89 GeV; Use 45MW Klystron,upgrade RF source, replace 8 aged acceleration tubes ; Bombarding energy for positron 150 MeV  240 MeV; Electron gun beam intensity 5A  10A ; Produce new positron source, improving efficiency ; Improve focus and orbit-correction system ; Repetition rate 12.5 Hz  50 Hz ; Pulse duration 2.5ns  1ns ; Possibility of double pulse injection (f RF /f Linac =7/40);

23 means and factors for increase injection rate

24 SC RF System Requirements : Sufficient voltage Sufficient power reducing coupling instability stability, reliability Measures: collaborate with SSRF, Cornell and KEK , using existing technology.

25 Super-conducting Cavity CESR-type Cavity (ACCEL) KEKB-type Cavity (Mitsubishi ) 2IHEP/KEK/SSRF collaborating group will optimize the cavity design, follow the manufacture process and technology, master the required techniques for operating and repairing the cavities.

26 Interaction point and SC Q magnet

27 Beam Feedback System Challenge : How to insure collision? Beam-beam bending and scanning techniques :  Beam-beam bending : accelerator physics  Bending measurement : beam instrumentation  Scan feedback : automatic control

28 BES III Expected Event Rates At  10 33,at J/  and 4.14 GeV, ~0.6  ParticleEnergy Single Ring ( 1.2f b -1 ) Double Ring (4f b -1 ) D0D0  7.0   10 7 D+D+  5.0   10 7 Ds 4.14GeV 2.0   10 6 +-+- 3.57GeV 3.67GeV 0.6     10 7 J/  3-4   10 9  0.6   10 9

29 BESIII Design Goals High event rate : lum. :10 33 cm -2 s -1 and bunch spacing 8ns , hardware trigger rate: 4000 Hz , putting on mass medium: 3000 Hz. Improve detector resolutions, especially for photons Improve particle identification Enlarge detector solid angle acceptance Design interaction region to fit sc Q magnets

30 Schematic of BESIII Detector

31 BESIII Main Sub-systems CsI EM Calorimeter:  E/E (inc. dead MDC: small cell, Al field wire and He-based gas  P/P (1GeV) =  dE/dx = 6-7 % Time of Flight:  T: barrel 90 ps ; endcap 110 ps  counter(RPC): readout strip width : ~4 cm Luminosity Monitor(LM)  L/ L = 3-5% SC Solenoid : 1 Tesla, I.R m, Length 3.8 m New Trigger and Online system for multi-bunch and high lum. Operation, 4000Hz, 3000Hz to mass storage New Electronics : pipeline operation Offline computing : PC farm, mass storage

32 Small cell, layers He based gas HeC 3 H 8 ( 60:40) Position resolution 130  m Mom. Resolution 0.6% at 1 GeV at 1 Tesla 1.4% at 1 GeV at 0.4 Tesla

33 BESIII mechanical structure Dimensions need final tuning

34 BESIII Electronics specification list Feb. 21, 2002 Item time measurement Charge measurement Count rate per channel Information provided to trigger Numbe r of channel σtσt INL Ran ge Cro ss- talk Nu mber of cha nnels σQσQ INL Dynami c range Cro ss- talk Type Quant. MDC ns ≤0.5 % n s fc ≤2 % 15 fc fc 1% 1% 30 k/s hit TOF + CCT ≤25 ps 0- 60ns bits (ENOB ) ≤2 % 20mv – 4v 2-4 k/s hit 456 EMC BAR fc 200Ke V 1% 1% 0.5fc fc 0.3 % 1 k/s Summati on Of analog EMC (End) fc 1% 1% 0.5fc fc 0.3 % 1 k/s Summati on Of analog Mu Chan ~10000 Spec Considering multiple hit time measurement

35 Sub-systemBES IIIBESII  XY (  m) = MDC  P/P ( 0 / 0 ) = 0.6 %(1 GeV) SC 1.4 %(1 GeV) Normal 1.7% √2 (1 GeV)  dE/dx ( 0 / 0 ) = 6-7 % 8.5% EM Calorimeter  E/√E( 0 / 0 ) = 3.5 %(1 GeV)  z (cm) = 0.5cm/ √E 20% (1 GeV) 3 cm / √E Time of Flight  T (ps) = 90 ps barrel 110 ps endcap 180 ps barrel 350 ps endcap  Counters9- 10 layers3 layers Magnet 1.0 tesla Option tesla Option tesla Comparisons between BESIII and BESII

36 BESIII detector with existing magnet Worse mom. Resolution, Better low mom. efficiency

37 BESIII Expected Physics Results Monte Carlo simulation show: because lum. Increase by two-orders of magnitude, a factor of 3 – 7 of that of CLEOc , BES III can obtain many important results in tau-charm physics Topics : Precise measure CKM parameters Precise R measurement Search for glueballs, determine spin and parity Search for 1 P 1

38 Physics example 1 : precise measure CKM matrix Measure pure-leptonic and semi-leptonic decay Br. Fractions of charm mesons to determine V cd and V cs Measure hadronic decay Br. Fractions of charm mesons for determine V cb Measure f D and f Ds for determining V td and V ts Measure semi-leptonic shape of D and Ds for V ub CKM unitarity check

39 Br. Fractions of D decays ( involving leptons ) Decay Mode Input Br(%) Measured Br(%)(80 pb –1 ) Relative Error (stat.)(5 fb –1 ) % % % 0.03 evts ~340 evts  f D /f D ≈3%

40 Physics example 2 : R measurement Error Source BESII reach(%) BESIII goal(%) Luminosity Selection effi Trigger effi. 0.5 Radiation corr Model of hadron decay – 2 Statistical Total error 6 –

41 Physics example 3 : Search for 1 P 1  S)    P 1    c     r = (1.2 – 3.3)×10 -6  1 P 1: evts/year  ackground:  S)   c1,  c2,,     

42 Other expected physics reaches and background study by MC simulation will be covered by Dr. Wang Yifang Most of the main detector sub-systems will be covered by other speakers, I will say a few words about these sub- systems which are not presented separately today. Interaction region Mechanical preliminary design Slow Control

43 Interaction Region It is very compact at IR, very close cooperation is needed in the designs of detector and machine components at IR Understand the space sharing, the support, vacuum tight Understand the backgrounds from machine and how to reduce them, good vacuum near detector is required - Beam loss calculation (masks) - Synchrotron radiation (masks) - Heating effect (cooling if necessary) Understand the effects of the fringe field from SCQ to the detector performances, the preliminary study shows that, field uniformity should be better than 5% in most of the MDC volume Center of beam pipe will be a double-wall Be pipe

44 BESIII Mechanical design and Detector Hall Detector on two rail pads to move in south-north Iron Yoke Barrel~ 285 tons; endcap ~2  52 tons. at both sides between barrel and endcap, there should be a slot of 1100x 80mm for each side of octagon on every terminal surface of the barrel of yoke, for cable space.

45 Assembled Structure, test assembling at factory

46 Movable endcap yoke; reposition for field stability endcap EMC supporting and moving design, removing and reconnecting cables should not change the gain.

47 Arrangements of electronic crates, moving with detector

48 Arrangements for cooling water, gas, cables

1.Temperature measurement: > 1000 EMC CsI, 600 ; MDC 16; , 150; electronics crates, 300; cable rack, 100; environment, 100; 2. Humidity measurement: ~250 CsI, 200 ; MDC, 8; electronics, 20; environment, 30; 3. Low HV of VME crates: MDC gas : Voltage of power supply: several. 6. Other measurements? Magnetic field; parameters in SC magnet and cryogenics; HV parameters for detectors; radiation dose; He leakage; flammable gas;others. Slow control system Required measurements from detector and electronics

ONE WIRE BUS can be used to read these signals out Probe/master, doing R&D 64 bit W. A. O ( unique code worldwide), 12 bit DATE Temperature probe: DS18B20, 22 RMB/probe humidity probe: LTM8802, ~150 RMB/probe 1. Humidity range: 1~99% , typical precision: 3%. 2. Temperature range: -30 ℃ ~60 ℃, accuracy 0.5 ℃ D. C voltage probe: DS2438/ LTM8805, several dozens of RMB/probe analog voltage:0 ~ 10V ( resolution : 0.01V ) Light-decoupling between PC and master to reduce noise pickup, LTM - 4850/2 dual-port RS - 485 card

51 BESIII Key Technology and Challenge Control background (with machine people), take good quality data at high luminosity. Small ring is more problematic with background and radiation dose! Design and operate SC magnet Stable operation of MDC(>30000 wires), obtaining better resolution Obtain best possible EMC energy resolution, by quality control in detector construction and good calibration systems Obtain best possible TOF resolution, all factors controlled Build a trigger and DAQ system, with required data transfer rate and good performance (specifications, reliability)

52 Some preliminary design issues, such as TOF readout electronics, EMC support structure etc are not finalized The tasks for offline systems are defined, people are assigned, the important issue is that the overall structure of offline system should be decided ASAP, so people can start to work on the software Determination of some of main design options Magnet? super-conducting/existing normal; performances and cost Particle ID? (TOF/ Ĉerenkov based) Cost and schedule concern Cost for EMC, SC magnet and electronics is most crucial; MDC, EMC and SC magnet (including iron structure) on critical path;

53 BESIII will be competitive in producing good physics results after its completion; can help to master advanced technology related to detector design and construction, fast electronics, DAQ and data analyses, help to catch up with world level or close the gap. But, construction of BESIII and obtaining world class results, are big challenge to Chinese HEP experimentalists, need to master new techniques, such as super-conducting, low-Z small cell MDC; high precision EM calorimeter; pipeline fast electronics, fast data acquisition, huge data storage and processing; Need international collaboration ( Japan, US, Korea) 。

54 Conceptual design started in Feasibility study started in the summer of 2000 , completed in Aug. of Preliminary design started in the summer of 2001 : –Machine finished physics design, requirements for sub-systems are determined; –Sub-system designs are progressing well –Detector design is progressing well, prototype and detailed mechanical design –Expected to finish preliminary design in 2002 Upgrade of Linac started. R&D for key technologies started : SC cavity, Q magnet Project Status

55 Feasibility Study/Design Review BEPC II feasibility international review ( – 6, Beijing ) 26 experts reviewed the feasibility of machine and detector BEPC II machine feasibility review ( Beijing ) 21 domestic experts reviewed machine feasibility and preliminary design. BESIII International Workshop ( – 15 Beijing ) International technical review of machine preliminary design at SLAC, May, 2002 BESIII preliminary design review, in Sep. of 2002

56 Project Schedule and Budget Done Feasibility Study Report submitted.  End of Sep. of 2002 Preliminary Technical Design Report  June 2003 R&D and prototype  May 2004 BEPC run July 2002  June 2006 Construction May 2004  Nov BESII dismounting and Linac upgrade Nov  Jan Linac commissioning Jan  Apr SR run Apr  Jan Storage ring assembling Jan  June 2006 Commissioning of storage ring June 2006  Sep BESIII detector moved to beam-line Sep  Commissioning machine and detector Very tight schedule

57 BESIII Schedule ~ Preliminary design ~ R&D of critical parts ~ Construction of detector components ~ Construction of return yoke ~ Design of super-conducting magnet ~ BESII disassembling ~ BESIII iron yoke assembling (with magnet) Commissioning of cryogenics ~ Magnet field measurement ( with SCQ ) ~ Assembling of other detector components ~ Commissioning of BESIII detector ~ BESIII moved to beam-line ~ Commissioning of BEPCII+BESIII Some sub-systems maybe problematic to meet the schedule

58 BEPCII Team and Administration BEPC II project leaders and headquarter are established; 4 Major systems, Linac; Ring; Detector; Technical support( cryogenics). Most of responsible persons for sub-systems are appointed. Some procedures are established, quality control; budget control; technical review; etc.

59 BEPCII Budget (10K RMB) BEPCII Budget (10K RMB) ItemBudgetPercentage 1.Linac % 2.Ring % 3.Detector % 4.Infrastructure % 5.Assembling % 6.Building % 7.Others % 8.Overhead % 9.Contingency % Total %

60

61

62

63 BEPCII Domestic Collaboration Participation from other Institutes and Universities from China, in charge of one sub-system or collaboration with IHEP Shanghai Synchrotron Light Source –500 MHz RF system Shanghai Institute of Ceramics : CsI crystals Beijing University : RF system, detector Qinghua University : Accelerator technique, detector University of Science and Technology of China : Detector, readout electronics

64 BESIII Domestic Collaboration Design, MC simulation Sub-detectors R&D and construction Electronics R&D and manufacture Online/Offline software Software package Reconstructions Calibration Physics study In charge of some sub-system or send people to IHEP

65 BEPCII International Collaboration International collaboration played an important roll in BEPC/BES project , Expect to play major roll in the design and construction of BEPCII / BESIII : – BNL of US: SC Q magnet; – SLAC of US: Key machine technology, design reviews; – KEK of Japan: SC cavity and SC solenoid… –Improve technical excellency and research capability Advice and help in design and construction in various systems; Technical review and follow-up in detector design, construction and commissioning.

66 BEPCII / BESIII can attract international participation, especially in detector and physics; Share cost , improve detector performances Institute of High Energy Physics, Beijing Tsinghua University, Beijing Beijing University, Beijing Sichuan University, Chengdu University of Science and Technology of China, Hefei University of Hawaii, Honolulu Shandong University, Jinan Nanjing University, Nanjing Shanghai Institute of Ceramics, Shanghai National Central University, Taipei University of Tokyo, Tokyo University of Washington, Seattle Huazhong Normal University, Wuhan

67 More Institutes from US and Japan may join, Korea has interest in participating Should form BESIII international collaboration according to international standard: Institutional board; Executive board; Spokesperson; etc. International review/Documentation/ video conferencing

68 Summary  BEPC/BES meet opportunity and challenge in the field of tau- charm physics.  BEPCII double-ring design luminosity cm -2 s -1 at 1.89 GeV , with major upgrade of BES , can insure an important roll in world HEP, especially in tau-charm physics.  BEPCII/BESIII is technically feasible, should be started as soon as possible.  BESIII has a baseline design, optimization is needed  Strength domestic collaboration , stimulate developments of relevant technologies in China.  International collaboration in BEPCII/BESIII construction.  BESIII Collaboration should follow international standard.

69 Hope this review meeting can help BESIII to improve its design Thanks

70 Sub-systemBES IIICLEOc  XY (  m) = MDC  P/P ( 0 / 0 ) = 0.6 %(1 GeV) SC 1.4 %(1 GeV) normal 0.5 %(1 GeV)  dE/dx ( 0 / 0 ) = 6-7 % 6% EMC  E/√E( 0 / 0 ) = 3.5 %(1 GeV)  z (cm) = 0.5cm/ √E 2.3 %(1 GeV) 0.5 cm / √E TOF  T (ps) = 90 ps Barrel 110 ps endcap RICH  counter9- 10 layers3layers magnet 1.0 tesla option tesla option tesla Comparison Between BESIII and CLEOc

71 Infrastructure BEPCII needs some building construction: halls for Cryogenic system and additional magnet power supplier; improving shielding of some buildings, etc. Major systems: –New cryogenic system: capacity of 1kW/4.5K –BEPCII power consumption to be doubled 110kV transformer: 6300kVA  12500kVA New electric crates and apparatus –Increase capacity of air-conditioning –Improve water circulation system –Improve pure water system

72 More room is needed for electronics, two more steps

73 High Energy Physics 1 ) BEPC future development  BEPC II: - BEPC / BES major upgrade, increase luminosity by more than one order of magnitude; - Main physics goal: J/ ,  ′and D/DS physics; 2 ) Strength non-accelerator experiments: Cosmic ray, astro-physics experiments, neutrino experiment…; 3 ) International Collaboration Chinese Academy of Sciences : The strategy for Chinese HEP and Advanced Accelerator technology

74 Science-education Leading Group of State Council, the 7th meeting ( ), discussed the report by CAS about HEP Conclusions : ( 1 ) Approval in principle of 《 Report about the future development of Chinese HEP and advanced accelerator technology 》 by CAS. Meanwhile, CAS should consult further with experts in China and abroad , strength and attract more international collaboration. ( 2 ) In view of the success of BEPC, approval of major upgrade of BEPC, with a budget of 400 M RMB. With relatively small invest, continue to obtain high-level achievements. (At that time, it was meant single-ring)

75 Superconducting Cavity BEPCII Superconducting Cavity 北对撞点

76 BEPCII Vacuum system  At designed current dynamic vacuum ( curve 8   , IP 5   )  reduce impedance, avoid instability. Measures IP use big pump, Smooth vacuum chamber, avoid gap and cavity; Absorb SR photons; Positron ring vacuum chamber tim coated, reduced second emission.

77 IP and SCQ Magnet