2009 Web Seminar Series Resolutions for Unexpected Site Challenges Instructors:Charlotte Royer-Malvestuto, M.Ed., MBE Jack Chally, M.B.A. An Introduction.

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

Chapter 7 Managing Risk.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
PROJECT RISK MANAGEMENT
Series 2: Project Management Understanding and Using 6 Basic Tools 9/2013 From the CIHS Video Series “Ten Minutes at a Time”
Project Management.
Chapter 7: Managing Risk
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Project management.
LSU 10/09/2007Risk Management1 Risk & Risk Management Project Management Unit #5.
8 Managing Risk Teaching Strategies
7-1 Risk Management Chapter 7 © 2007 Pearson Education.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
贾银山 Software Engineering, Chapter 5 Slide 1 Project management.
1 Software Engineering Muhammad Fahad Khan Software Engineering Muhammad Fahad Khan University Of Engineering.
PRM 702 Project Risk Management Lecture #28
Project Risk Management: An Overview Andrew Westdorp Program Manger, IV&V Lockheed Martin (301)
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk management process
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Managing Risk. What is Risk Risk is the chance of things happening that could have an impact on the outcomes it achieves, or on the objectives of the.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Risk Management For the Board of The Law Society 16 February 2005.
System administration Risk Management Risk Definition Risk Strategies Risk Assessments.
1 Project Risk Management Project Risk Management Dr. Said Abu Jalala.
7-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Risk Management Chapter 7.
7-1 Risk Management Chapter 7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
Chapter 12 Project Risk Management
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Risk management.
Chapter 7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 7-1 Risk Management.
Project Management Learning Program 19 – 30 April 2010, Mekong Institute, Khon Kaen, Thailand Assumptions and Risk.
Risk Analysis & Management
Chapter 15: Risk Management
Project Management Risk Management. Introduction Project planning Gantt chart and WBS Project planning Network analysis I Project planning Network analysis.
COOP Seminar – Fall 2008 Slide 1 HOUSTON COMMUNITY COLLEGE SYSTEM SAIGONTECH SAIGON INSTITUTE OF TECHNOLOGY Software Project Management.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
1 Risk Management 2 n IEEE defines risk as: “the likelihood of an event, hazard, threat or situation occurring and its undesirable consequences” [Std.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Introducing Project Management Update December 2011.
Software Engineering B.Tech IT/II Sem-II Term: Unit-7 PPT SLIDES Text Books:1.Software Engineering, A practitioner’s approach Roger s. Pressman.
1 Project management. 2 Topics covered Management activities Project planning Project scheduling Risk management.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
Chap 4. Project Management - Organising, planning and scheduling
2.2.3 Managing risk in a humanitarian response Learning objectives: At the end of this session, participants will be able to: Define risk List potential.
Introduction to Project Management Chapter 9 Managing Project Risk
Chapter 7 Risk Management.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
Project management 1/30/2016ICS 413 – Software Engineering1.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Chapter 4: Project management l Organising, planning and scheduling software.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
Ashima Wadhwa.  Probably the most time-consuming project management activity.  Continuous activity from initial concept through to system delivery.
The process of identifying and controlling the risks is called Risk Management.
1 Project management Organising, planning and scheduling software projects.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
COMP201 Project Management.
Software Engineering B.Tech Ii csE Sem-II
Project management.
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
RISK ASSESSMENT TOOL PREVIEW
System administration Risk Management
Management. Management What is a risk? A risk is simply a probability that some adverse circumstance will actually occur.
Risk Management Process (Revised)
Chapter#8:Project Risk Management Planning
Software Risk Management
Chapter#8:Project Risk Management Planning
PFMEA Summary Process Steps
Presentation transcript:

2009 Web Seminar Series Resolutions for Unexpected Site Challenges Instructors:Charlotte Royer-Malvestuto, M.Ed., MBE Jack Chally, M.B.A. An Introduction to Risk Management "This training has been funded in whole or in part with Federal funds from the National Institute on Drug Abuse, National Institutes of Health, Department of Health and Human Services, Under Contract No.HHSN C."

2 Training Outline Introduce Risk Management  Risk management recognizes and addresses unexpected site challenges in a proactive manner  Potential threats are embraced and addressed instead of ignored or hidden Case Study and Group Discussion  Process helps identify critical components for continual, successful operations and the likelihood of disruption and appropriate plan to mitigate undesirable events

3

4 Risk Management Risk  A probability that some adverse circumstance will occur Risk Management  Process for risk identification and contingency plan development to address risks Done with each study section or overall Assess probability of occurrence (80%) Strategy or contingency plan for each risk

5 Risk Management Process  Risk identification Identify project, product and risks level  Risk Assessment/Analysis Assess likelihood and consequences  Risk Planning Develop plans to avoid or minimise risk impact  Risk Monitoring/Controlling Monitor and adjust plans Risk Identification Brainstorm to identify potential problems Risk Assessment Assess risk Severity Likelihood Controllability Risk Response Development Plan to reduce possible damage Make contingency plans Risk Monitor/Control Implement risk strategy Monitor and adjust Change management

6 Revealing & Planning for Vulnerable Operations Generate list of possible risks Goal = Find potential problems before they happen  Break into task areas  Brainstorm  Past experience Focus on events that could create unwanted outcome EventsOutcomes Shipping delaysFailure to meet schedule Toy on stairsStaff member breaks leg Snow stormOpened late

7 Risk EventOutcomeImpactLikelihood Staff turnover CTP Buy-in Miscommunication Informed Consent Errors Risk Log Revealing & Planning for Vulnerable Operations Minor Risk Moderate Risk Major Risk

8 Risk EventOutcomeImpactLikelihood Stuck in trafficMissed client meeting 44 Risk Log Driving to Work in the Rain Risk Assessment Process Minor Risk Moderate Risk Major Risk

9 Risk Assessment Process Likelihood Impact Minor Risk Moderate Risk Major Risk Risk Severity Matrix Driving to Work in the Rain

10 Risk Assessment Process Risk EventResponse to Risk Contingency Plan TriggerPerson Responsible Stuck in traffic Reduce, Share, Transfer or Accept risk Leave 30 minutes early Weather report Jack Risk Response Matrix Driving to Work in the Rain

11 Risk EventOutcomeImpactLikelihood Lag in CRF Completion Missed data/increased data queries 44 Risk Log Risk Assessment & Management CASE STUDY Jane, a new RA, is conducting all scheduled study visits but is often unable to complete and enter the CRFs within the required timeframe. It is becoming increasingly difficult to remember visit specifics and she is concerned about the quality of the data Minor Risk Moderate Risk Major Risk

12 Risk Assessment & Management Case Study Likelihood Impact Minor Risk Moderate Risk Major Risk Risk Severity Matrix

13 Risk Assessment & Management Case Study Risk EventResponse to Risk Contingency Plan TriggerPerson Responsible Lag in CRF Completion Reduce, Share, Transfer or Accept risk Training Time Management /Cross-train QA visit/Data Queries Project Manager Risk Response Matrix

14 Group Discussion Risk Assessment and Management Process

15 Risk EventOutcomeImpactLikelihood Risk Log Group Discussion Minor Risk Moderate Risk Major Risk

16 Group Discussion Likelihood Impact Minor Risk Moderate Risk Major Risk Risk Severity Matrix

17 Group Discussion Risk EventResponse to Risk Contingency Plan TriggerPerson Responsible Reduce, Share, Transfer or Accept risk Risk Response Matrix

18 Summary Risk Assessment Process  Reveals critical tasks in operations  Possibilities for disruption Likelihood and impact rating  Appropriate response strategy Tools  Risk event log  Risk Severity Matrix  Risk Response Matrix