PHENIX WEEKLY PLANNING 11/1/2007 Don Lynch Daylight Savings Time ends Sunday Nov. 4 at 2:00 AM.

Slides:



Advertisements
Similar presentations
PHENIX WEEKLY PLANNING 9/13/2007 Don Lynch. 9/13/2007 Weekly Planning Meeting 2007 PHENIX Shutdown April-June 2007: Complete run, De-mount HBD West, Begin.
Advertisements

PHENIX WEEKLY PLANNING 2/8/2007 Don Lynch. 2/8/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress Pink.
PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
PHENIX WEEKLY PLANNING 10/25/2007 Don Lynch. 10/25/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 5/31/2007 Don Lynch. 5/31/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6 or 6/13/07?
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 5/24/2007 Don Lynch. 5/24/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6/07 Remove HBD.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 7/19/2007 Don Lynch. 7/19/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 8/9/2007 Don Lynch. 9/9/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
PHENIX WEEKLY PLANNING 10/18/2007 Don Lynch. 10/18/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 10/12/06 Don Lynch. 10/12/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
PHENIX WEEKLY PLANNING 12/20/2007 Don Lynch. 12/20/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 7/26/2007 Don Lynch. 7/26/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

PHENIX WEEKLY PLANNING 11/1/2007 Don Lynch Daylight Savings Time ends Sunday Nov. 4 at 2:00 AM

11/1/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under EC)DoneDone (elsewhere in IR)DoneDone CM Move to Run position DoneDone More decapacitor removalsDoneDone Close out all shutdown ’07 open work permits10/1811/2 RPC Tent preparationOn Going11/30 (see slides)

11/1/2007 Weekly Planning Meeting3 ItemStartFinish EC Roll InDoneDone Blue Sheet/Pink sheetsPink DoneBlue in progress DC East & West repairs (permits done)in progress11/2 Pre-run Commissioningin progress 11/2 Assemble shield wallin progress 11/2 Move MMS to run positionDoneDone Install MuID collarsDoneDone Shield wall roll inBase aligned11/5 Start of Run 8 (Cooldown)11/111/1 Start 2 person watch shifts11/611/6 Install FPGA box (mech. Same as 2006)?? Blue ring cold, start d- beam11/711/7 (Access during day, beam at night) Yellow ring cold, start Au beam11/1211/12 (beam all day, little or no IR access) Start of Physics12/112/1 Run 8 Prep Schedule (cont’d)

11/1/2007 Weekly Planning Meeting4 Safety Systems/ UPS Pink sheeting - completed Blue sheeting in progress Temporary UPS installed last Friday New UPS due date ??? HSSD system status Other Issues

11/1/2007 Weekly Planning Meeting5 CM Ladder/Stair Shutdown Access PO pinned Waiting for delivery Purchasing SNAFU causes delay Delivery ~10/15

11/1/2007 Weekly Planning Meeting6 Station 1, 2, 3 access plan Work to begin on these items after prep for run 8 is finished

11/1/2007 Weekly Planning Meeting7 RPC Factory Issues Electrical –Walkthru? Still to be done: heaters, safety system rack including UPS, UPS (from PHOBOS) for tent computers. Need to move phone/internet jack on outside of tent in tech area to inside tent for security reasons. Wireless now working in tent. Gas System: Nearly approved; Formatted and formalized. Finish approval when Rob gets back.

11/1/2007 Weekly Planning Meeting8 Equipment – Kenny working on Cosmic ray test stand. John working on piping. Shelving next. Young Jin providing specs and location. RPC group will provide specs for the gap transportation cart (vertical high and low lifting requirements, horizontal/ vertical orientation, table top dimensions, max load capabilities, etc.) PHENIX will design and fabricate. RPC group will provide specifications for gap and module storage racks. PHENX will design, fabricate and install. Work plan – existing work plan covers work to be done between now and factory start up (Factory startup is when production testing and assembly of modules and half octants begins) Work allowed now includes set iup of gas system including all components and N2 testing for leaks (use of gases other than N2 requires approved gas operation procedure and full working safety system- see above). Electrical setup testing of prototypes, instrumentation and related equipment in preparation for factory operation may commence as soon as a final walkthru by C-A experimental safety group is completed and any action items generated by walkthru are addressed to the satisfaction of the experimental safety group. RPC Factory Issues, cont.

11/1/2007 Weekly Planning Meeting9 Security – Lock installed on door. All zipper doors are to be closed when not in use and zip tied down from inside. Locking tool and equipment cabinets inside tent. Additional security required when raw materials arrive. RPC group to review C-A policy (3 tier requirement as required by C-A procedure 1.20) RPC group will prepare a one page description of how they intend to comply with this requirement. This will be reviewed by C-A. RPC Factory Issues, cont.

11/1/2007 Weekly Planning Meeting10 Remaining Action Items from C-A safety review: Gas monitoring equipment to be calibrated and tested per BNL requirements – Equipment is manufacturer calibrated. Will be tested with mini blue sheets check out. Gas schematic/ procedure needed – Done awaiting approval Max flow rates incl. chambers in storage for all gases to be forwarded to M. van Essendelft – still needs to be done before factory startup Electronics to be approved installation and use (including NTRL equivalence approval) – Done, walkthru needed. Any chemicals to be purchased through BNL to assure compliance – Will be complied with Adequate ventillation to be designed into tent – Done Approved security apparatus to protect against theft – see above RPC Factory Issues, cont.

11/1/2007 Weekly Planning Meeting11 Other Work Clean Out Container: To be done by end of next week JTA review and update - in conjunction with performance appraisals Procedure review – pick up where we left off

11/1/2007 Weekly Planning Meeting12 Safety, Security, Etc. : 1.Main Door to Counting House is a safety hazzard Needs immediate attention 1.Lifting equipment needs annual inspection in November 2.Check your PHENIX awareness and Collider accelerator training 3.Work planning revisions minor changes to work planning SBMS: New green sheets ES&H  ESS&H, * IH reviews required for certain concerns, No OMC block, feedback box required when green sheet used 3 levels of work planning Worker Planned Prescribed Permitted 4.BNL Crackdown on improper use of computers pornography, file sharing, IM, e-bay, excessive time

11/1/2007 Weekly Planning Meeting13 Safety, Security, Etc. : C-A Safety Targets Increase human performance training Increase senior manager's work observationsmanager's work observations Participate in code training (e.g., ASME / NEC / OSHA) Review all events and occurrences specifically for organizational deficiencies Conduct a field review of posted operator aids Conduct a review of records, ensure secure and retrievable locations Train staff in 2008 version of Work Planning Subject Area2008 version of Work Planning Subject Area Train staff on Environmentally Preferable Purchasing ProgramEnvironmentally Preferable Purchasing Program Disposition materials and chemicals in accord with UMC planUMC Reduce unnecessary loads to decrease electricity use Cap Linac beam stops and investigate need for a cap adjustment at J-10 Improve materials security program with more cameras and secure locations Reduce, where appropriate, lead solder, freon, mercury Reduce excess space throughout C-AD complex Complete industrial hygiene baseline monitoring (noise, etc.) Complete the arc flash calculation and labeling program Archive data on activated soils Complete the removal of PCB capacitors at Linac, B912 and B928 Investigate costs for PCB removal at TVDG Request, as in previous years, BNL repair Building 912 and 930 roofs Upgrade B912A emergency generators and remove underground fuel tank Begin closing out Fire Hazards Analyses recommendationsFire Hazards Analyses Abate OSHA violations Reduce warehouse 'footprint' and help better manage inventory of spares Remove old unsafe power distribution components (cables, Royal boxes, etc.) Clarify and enforce PPE policiesPPE policies

11/1/2007 Weekly Planning Meeting14 5 Year Plan 2007 HBD Repairs, DC (minor) repairs), MPC N&S upgrade,MuTr FEE upgrade prototype, infrastructure upgrades & repairs, misc. subsystem work 2008 MuTr FEE upgrades 1 octant 1&2 S, Cu absorber test, start RPC3 S, infrastructure upgrades & repairs, misc. subsystem work 2009 Scaffolding in MMS and MMN, MuTr FEE N&S stn. 2 & 3, finish RPC3 S, MuTr N&S stn. 2 & 3 repairs, RPC2 S&N, RPC3 N, Cu absorbers, infrastructure upgrades & repairs, misc. subsystem work 2010Remove HBD & RXNP, remove beampipe, DC West upgrade, VTX barrel, RPC1 N&S, MuTr FEE stn. 1 N&S, MuTr stn. 1 N&S repairs, infrastructure upgrades & repairs, misc. subsystem work 2011NCC S, FVTX, infrastructure upgrades & repairs, misc. subsystem work 2012NCC N, upgrades contingency & wishlist, infrastructure upgrades & repairs, misc. subsystem work * Years refer to the shutdown year and follow the run with the similar number (i.e. work in 2007 is to be done in the shutdown that follows run 7, and so on)

11/1/2007 Weekly Planning Meeting15 Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Where To Find PHENIX Technical Info November is here: Run 8 starts today 3 Holidays: Veterans Day – Nov. 12 Thanksgiving - Nov 22 Black Friday – Nov 23