D. Beavis (BNL) HFT Workshop March 10-11, 2009 BNL HFT Beam Pipe and Safety.

Slides:



Advertisements
Similar presentations
CATIA V4 Software Deployment Project Proposal
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
HFT Safety --PXL detector September 26, Dana Beavis.
Happy Halloween! notebooks and task list due today revisit schedule of upcoming assignments –ABET essay –timeline/effort matrix –technical specifications/standards.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Estimating the Benefits and Costs of a Human Factors Engineering Program Adapted from a presentation to: MEK 2005: Congress on Medical Devices, Human Factors.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Project Post-Mortem University of California Berkeley Extension Copyright © 2008 Patrick McDermott From an AutoContent Wizard 10/27/2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Brentwood of Palatine Condominium Board Meeting Financials – Budget discussion Approval of Minutes / Resolutions Gate status – Alternatives pending.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
BICEP Beam Testing Site Survey Dowell, Chiang, Kovac, Nguyen 2004 May 7.
HFT face-2-face F.Videbaek Brookhaven National Lab.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
HFT project Overview and Status May 11, 2010 F.Videbaek BNL 5/11/20101.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
Dan Cheng Mar 6, 2014 QXF Instrumentation Trace Fabrication Update.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
TOF Preliminary Design and Safety Review Project Management Controls R. L. Brown.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
January 9, 2012 Nursing 330 Human Reproductive Health.
1 Daya Bay Project Design Review Status Ralph L. Brown US Chief Engineer January 9, 2008.
MIPO meeting 12/05/15. Exec summary Working group satisfied in integrity of absorber vessel and windows, pending review of reports – Proof test at 2.2.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
1 Nov 9, 1989 Oct 3, 1990 By the way DAQ Update We had a few very interesting weeks... We really learned how to recover from power outages and other.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/31/2009 Don Lynch.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
HFT-Beam Pipe D. Beavis BNL March 14, Overview Update on new Beam pipe –Assembly drawing –Material changes –Length changes Outlook 2 HFT F2F at.
Engineering Documentation
Component D: Activity D.3: Surveys Department EU Twinning Project.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Lab-Wide Earned Value Management System Project Core Team Meeting September 10, 2008 Dean A. Hoffer/Elaine McCluskey.
Rob Connatser NSS Instrument Work Packages and XLPM.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
ELENA installation progress F. Butin / ELENA collaboration.
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
Oversight Board Meeting October 3, 2017 Rob Michnoff
5/24/2017.
[Project Name] Post-Mortem
PROJECT NAME POST-MORTEM
Printed handouts available
[Project Name] Post-Mortem Presentation Template
Project Name Post-Mortem
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Presentation transcript:

D. Beavis (BNL) HFT Workshop March 10-11, 2009 BNL HFT Beam Pipe and Safety

Schedule itemscheduleCompletion Dates STAR (E&D) (start)7/24/09 Bid (complete)12/24/091/27/10 Manufacturer Engineering (complete) 2/24/10(3/24/10) Fabrication1/24/11 Acceptance BNL3/24/11 NEG coating5/24/11 BNL prepare for Install7/24/11(8/24/11) Total24 months(25 months)

Cost Estimate $292,000 with 20% cont. for a total of $350,000 Estimate $292,000 with 20% cont. for a total of $350,000 Actual $327,116 Actual $327,116

Comments PHENIX pipe came in one week ago PHENIX pipe came in one week ago They are confident it will be installed They are confident it will be installed There was trouble with fabrication of PHENIX pipe and this is causing a few weeks delay in our customer prints to address issues There was trouble with fabrication of PHENIX pipe and this is causing a few weeks delay in our customer prints to address issues PHENIX pipe length out of tolerance and roundness was just acceptable. PHENIX pipe length out of tolerance and roundness was just acceptable. The pipe was “dirty” inside The pipe was “dirty” inside Although nearly on schedule there is still lots of opportunities to be late for our pipe Although nearly on schedule there is still lots of opportunities to be late for our pipe

Remaining items Outside sections--design and order Outside sections--design and order Bellows and mounts Bellows and mounts Heating blankets Heating blankets Blanket insertion device Blanket insertion device

HFT Safety Have a pHAD (preliminary Hazard Analysis Document) Have a pHAD (preliminary Hazard Analysis Document) pHAD and Design Questionnaire sent to safety in C-AD on Sept. 30, 2009 pHAD and Design Questionnaire sent to safety in C-AD on Sept. 30, 2009 Update to a HAD for CD-2 Update to a HAD for CD-2 Send an updated version of pHAD (HAD) to safety people in about 2 months Send an updated version of pHAD (HAD) to safety people in about 2 months

Safety Individual items can be addressed as needed Individual items can be addressed as needed Fire test of carbon fiber is pending (FGT) Fire test of carbon fiber is pending (FGT) Paperwork found for lifting fixture (550 #) Paperwork found for lifting fixture (550 #) Others as they come up Others as they come up