Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.

Slides:



Advertisements
Similar presentations
Welcome to the University of Michigan – Dearborn Observatory Founded 2007.
Advertisements

M2FS SAC UpdateMarch 18, 2012 System Overview: M2FS Spectrograph Two independent, identical channels Each fed by 128 fibers Each with LoRes and HiRes modes.
MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
GSMT Control Workshop Tucson, September 11-12, 2001 Pointing Control for a giant segmented mirror telescope Patrick Wallace Rutherford Appleton Laboratory.
Thomas Stalcup June 15, 2006 Laser Guidestar System Status.
1 Astronomical Observational Techniques and Instrumentation RIT Course Number Professor Don Figer Telescopes.
Reflection and Refraction
Announcements No lab tonight due to Dark Sky Observing Night last night Homework: Chapter 6 # 1, 2, 3, 4, 5 & 6 First Quarter Observing Night next Wednesday.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
PTF / MOSAIC status R. Dekany January 31, Palomar Transient Factory P48 as transient discovery engine –New, wide-field visible imager (MOSAIC) –New.
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
Fiber Optics Defining Characteristics: Numerical Aperture Spectral Transmission Diameter.
OPTICAL FIBER WAVEGUIDE Optical Fiber Waveguides An Optical Fiber is a dielectric waveguide that operates at optical frequencies Normally cylindrical.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
Tibor Agócs Purpose of the talk  Wide-field spectroscopy/imaging is the driver  MOS  IFU  NB/WB imager  Current FOV is 40 arcmin – it’s.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Oct 22, 2007SSWG #18 UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair Schedule Status of other fix and improvement projects Budget.
Chapter 23 Light. Chapter Ray Model of Light Light travels in straight lines Ray model of light - light travels in straight line paths called.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
MCAO Adaptive Optics Module Mechanical Design Eric James.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
When light travels from an object to your eye, you see the object. How do you use light to see? 14.1 Mirrors When no light is available to reflect off.
LASER AND ADVANCES IN METROLOGY
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
© 2004 Pearson Education Inc., publishing as Addison-Wesley Telescopes.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
Telescope Integration and Tests Tuesday Afternoon.
The Hobby-Eberly Telescope Mirror Alignment Recovery System Marsha Wolf Graduate Student UT Astronomy Department.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
K-D-PR Fabrication and testing of KGMT FSM prototype Oct Ho-Soon Yang, Hak-Yong Kihm, Il-Kwon Moon, Jae-Bong Song, Yun-Woo Lee Korea.
SAM PDR1 S OAR Adaptive Module LGS LGSsystem Andrei Tokovinin SAM LGS Preliminary Design Review September 2007, La Serena.
Opto-Mechanics for SNAP at UM
The Active Optics System S. Thomas and the AO team.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
Counter Bore. Spot Facing – Provides a true bearing surface for a washer. Counter boring – Provides a recess for a bolt head, bushing or pin.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Binospec - Next Generation Optical Spectrograph for the MMT
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
Some Thoughts on Ground Layer Adaptive Optics & Adaptive Secondary Mirrors for Keck P. Wizinowich 9/15/14 1.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Table of Contents Light and Color Reflection and Mirrors
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
Active Optics and Wavefront Sensing at the Upgraded 6.5-meter MMT Xiaoyin Zhu Dec 12, 2012 OPTI 521 Paper Synopsis By T.E. Pickering, etc.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
Wide field telescope using spherical mirrors Jim Burge and Roger Angel University of Arizona Tucson, AZ Jim
Prisms, fibers, and reflective lenses
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
MMIRS Status A.Szentgyorgyi/SAO 30 April Imaging 7 x 7 arcmin FOV 0.2 arcsec pixels Y,J,H & K wavelength coverage Spectroscopy Multislit (4’ x 7’)
Incoming instruments. New instruments IMACS MOEMultiobject echellette LDSS upgradeMultiobject optical spectroscopy CorMASSLow-res visiting NIR spectrograph.
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/04 MMIRS Status Report Brian McLeod.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
Mirrors. Types of mirror There are two types of mirror Plane (flat) Curved Concave (curves in) Convex (curves out)
F/5 telescope work Secondary mirror polishing (SOML) Secondary mount support controls Active optics controls Flat field screen & lamps Telescope baffles.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Reflection and Mirrors Page 617. Rays Light waves travelling in straight lines.
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Blanco F/8 Status AURA Observatory Council, Tucson, 3/2013.
Keck Observatory Status
Reflection and Refraction
Announcements Lab tonight: planetarium
Astronomical Observational Techniques and Instrumentation
He Sun Advisor: N. Jeremy Kasdin Mechanical and Aerospace Engineering
Optics Alan Title, HMI-LMSAL Lead,
Presentation transcript:

Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004

Focus will be optically identical to MMT - 1°, Curved spectroscopy focal plane - 1/2°, Flat imaging focal plane Atmospheric dispersion compensation Wavefront sensing & guide function Shutter & filter handling “First light” instruments MMIRS and Megacam and capability to serve wide field to MIKE fiber feed Overview

Wide field corrector & ADC very similar to MMT. Instrument adapter to provide interface from MMT mounting to Clay rotator. Topbox for Megacam shutter & filter handling. Wavefront sensors included in instrument or topbox functionality. F/5 Secondary supplied by Magellan. Software interface to Clay guiding and mirror support software. Ancillary handling fixtures. Core Elements

Wide Field Corrector Optical Elements

Optical Fabrication Fabrication by Goodrich/Danbury L1 & L2 and ADCs complete L3 & L4 complete on 30 Oct 04

AR Coatings Are two viable suppliers of AR coatings for refractive optics this large with two complementary technologies: Sol Gel coatings by Cleveland Crystals – fragile, but optically superb & trivial recovery from bad coating. Dielectric multilayers by SAGEM – somewhat more robust, but not quite as good as Sol Gel & bad deposition is catastrophic.

Selected Sol Gel for WFC Optics AR Coating

Cleveland Crystal now under contract. Coating commences 11/11/2004 Three months to complete

S.Gunnels has finished analysis of global deflections of mirror cell. F. Perez’s has performed a pull test on the Baade rotator bearing. Henry Bergner calculates bearing is about half as stiff as spec. sheet indicates & finds that the Instrument Adapter is robust. Hope to get pull test on Clay rotator bearing in Mar. or Apr. Ordway’s measurement of interfaces was completed 23 Aug Will produce detailed performance prediction in next three weeks. Structural and Optical Analyses

WFC will be a tight fit. Have measured the diameters and roundness of critical diameters and flatness of axial references in August 04. Rotation axis of Cass bearing apparently within ~0.001” of center of WFC mounting surface, but ovalized ~0.003” Mounting holes for WFC are up to 0.035” from true position. Will fit check the WFC flange in Mar or Apr when tertiary comes out again before lenses are bonded into cells. Will fit check Instrument Adapter if possible.

Lift Fixture Tertiary Lifting Fixture F/5 Lifting Fixture Concept

Need to develop interfaces between F/5 wavefront sensor & mirror support system and the Megcam/MMIRS guide CCDS & telescope S. Schaller will accept raw Shack-Hartmann. and guide images. Software

Magellan cable runs are ~3x as long as MMT, so we are required to develop a new controller architecture. We have minimized size of interface; each subsystem only requires AC, optical fiber & ethernet. Will need to deliver coolant to modules on Cass rotator. Electronics

All WFC optic done except L3 & L4 - Completion 1 Nov 04 WFC AR coating done early Feb 05 ADC bearings complete Other WFC structures in work. WFC complete Oct 05 Topbox in work Instrument Adapter fab. Starts next two weeks. Lift table, handling fixtures fab starts Jan 05 Project Status

Expect on-schedule delivery in early Jan 2006.