LSAR – Why Bother? Value Cases For Logistics Support Analysis Records.

Slides:



Advertisements
Similar presentations
Combining Analysis strands in a Main Gate Submission.
Advertisements


Linking Technology and Defense. Introduction It stands for Product Life Cycle Support It is an International Standard It is an information standard It.
Test Automation Success: Choosing the Right People & Process
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
© 2014 wheresjenny.com Dock management DOCK MANAGEMENT.
ITIL: Service Transition
Continuous Value Enhancement Process
Support & Use Models for Proposals – Analyzer in the RFP Process Brief to the 2012 NAOUG Ottawa, Ontario, Canada May 2012 Pat Read & Graham Brum, Pennant.
Availability Assessment Ω PS Analyzer User Group Meeting 2013 November 13 by Greg van Bavel.
Jonathan Patterson Supportability Services Manager Pennant Canada OmegaPS User Group Meeting 12 November 2013 ILS and Performance Based Logistics: DND.
CHAPTER 10 & 13 IS within the Organization & Acquiring IS and Applications.
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
Data Warehouse success depends on metadata
Introduction to SAP R/3.
Introduction to Cost management
© 1998 Concept Five Technologies Enterprise Application Integration Capability Maturity Model.
Enterprise Architecture
Business Intelligence
S T A M © 2000, KPA Ltd. Software Trouble Assessment Matrix Software Trouble Assessment Matrix *This presentation is extracted from SOFTWARE PROCESS QUALITY:
Sustainability in the MOD IEMA Conference 2011 Dr Jon Freeman Sustainable Procurement Strategy.
Chapter 9 Database Planning, Design, and Administration Sungchul Hong.
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS LECTURER : NOUF ALMUJALLY 3 – 10 – 2011 College Of Computer Science and Information, Information Systems.
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
Fleet Performance and Reliability in Generation Utilities
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
CBM + Program Implementation
Reporting to Management Using Microsoft Project and EPM Derek Loar, Pcubed.
© 2008, Integrated Support Systems, Inc. All rights reserved. 1 © 2009, Integrated Support Systems, Inc. All rights reserved. An Implementer's View of.
Critical Software © Copyright Critical Software S.A All Rights Reserved. 5 December 2007 Birmingham Enabling Availability Based Contracts HUMS.
Product Life Cycle Support (PLCS) The Information Backbone to transform the Logistics Enterprise PLCS – Applying AIDC Howard Mason Corporate IT Office.
© 04/08/20011 Logistics Systems Engineering System Cost Analysis NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
Database System Development Lifecycle 1.  Main components of the Infn System  What is Database System Development Life Cycle (DSDLC)  Phases of the.
SAM Executive Seminar Software Measurement.
RBM and Asset Strategy.
8-1 Establish Cost/Schedule Performance Impacts Program Requirements Assess Risks Evaluate Risk Handling Options Evaluate Subcontractor Risks Establish.
1 Improving the Risk Management Capability of the Reliability and Maintainability Program An introduction to the philosophy behind the AIAA S-102 Performance-Based.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Pennant Corporate Overview  Specialize in  Product Life Cycle Support  World Class Logistics Support Analysis (LSA) Software  Simulation & Training.
Industry Goals. Increase Customer Satisfaction  On-Time, On-Budget, Within Scope  Ensure High Quality Delivery Increase Margins  Drive Efficiencies.
Metadata By N.Gopinath AP/CSE Metadata and it’s role in the lifecycle. The collection, maintenance, and deployment of metadata Metadata and tool integration.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
The Project Plan Plan Your Work, then Work Your Plan
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
1 Industry Specifications and their importance in Product Lifecycle Management (Dr Michael Day & Deborah Jane Ham) (September-2012)
David Hughes, PTC 27th September, 2012
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
ME Spring 2015 Systems Engineering, Part II Session March 2015 Mr. Larry Hopp, CPL.
Business Intelligence Energy, Resources and Utilities.
AXUG Partner Showcase – Introducing Preactor
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
ITIL: Service Transition
Life Cycle Logistics.
Is your Project ready for Earned Value Management (EVM)?
Systematic Project Management is our answer to the challenges in today’s project business We have the biggest portion of our business volume coming from.
Setting the Standard for Product Support
Across the entire value chain
Tech Data Pitch Section
Training: An Element of Integrated Product Support
OmegaPS Users’ Group Meeting OUGM19
METHODS FOR ANALYZING AND SUPPORTING A SUSTAINABLE PRODUCTION SYSTEM
OmegaPS/Analyzer User Group Meeting 2019
Presentation transcript:

LSAR – Why Bother? Value Cases For Logistics Support Analysis Records

Outline  What is an LSAR?  A Few Value Cases  Discussion 2Pennant Canada Ltd

3 So What is an LSAR? Of ANALYSIS activities (e.g. Support Options, R&M, FMECA, MTA) A RECORD of DATA from a set of activities within business processes For SUPPORT of a particular MISSION EQUIPMENT within its support/use scenarios Specifically, for the LOGISTICS aspects of SUPPORT An LSAR is the COLLECTION and SOURCE RECORD of information concerning EQUIPMENT SYSTEM: Support Performance Metrics Equipment Maintenance Plans Logistic Support Requirements The related and substantiating Logistics Support Analyses A Content/Purpose View … not a Format One !! Pennant Canada Ltd

An Equipment System  The Mission Equipment performs the operational mission  An effective Support System generates and sustains Mission Equipment  The combination of the Mission Equipment and the Support System constitutes an Equipment System  An effective Support System and capable Mission Equipment provides Materiel Readiness (for a specific client’s context of use and support) Support System Mission Equipment Button Equipment System 4Pennant Canada Ltd

Delivered LSARs  Spreadsheets  Relational Databases  b/GEIA 0007/AP-239 PLCS  Maintenance Manuals  Parts Manuals  SAP® ERP Maintenance Task List Pennant Canada Ltd5 DON’T THEY ALL contain data RECORD of ANALYSIS of LOGISTICS SUPPORT??

LSARs Address…  The Mission Equipment  Its support characteristics/ performance and requirements  The Support System  Design and performance  The Overall Equipment System  Combining these to identify use and support/performance across locations and missions  LSARs include Mission Equipment and Support System Baselines  Defining “Right” and evaluating Risk/Tradeoffs throughout the life cycle Pennant Canada Ltd6

The LSAR as Single Source Logistics Support Data DB & Internet tools LSAR Databases & Models InputsOutputs An Integrating Middleware Toolset for Logistics Analysis Design Datasets Supply Chain Datasets Client Use Datasets Publications & IETMs CAD/ CAM PDM Design Products Content Mgt & Publishing Products ERP & Maintenance Mgt IS Products Logistics Transactions & Data RAM & Logistics Analysis Products LSA Output Reports 7

LSARs - Can Have Integrated Multi-Source Data  Industry  Prime Integrator  Sub-Contractor  Industry Sources  Defence Depts  DND, USDoD, UKMoD, etc  ERP, Equipment Mgt, Defence Support System  NATO  NSN Interchangeability Groups Pennant Canada Ltd8

Some LSAR Value Cases  If you have it… you can…  Across Life Cycle  Options Analysis  Acquisition  In-Service  Disposal Pennant Canada Ltd9

LSAR AcquisitionIn-ServiceDisposal LSAR Increasing Content across Acquisition Phase, Use for LCC, OA, Bid Eval & SEM/ILS Deliveries Sustained Content, During In- Service Phase, Used for SA reworks, Perf Mon & Continuous Improvement (Maintenance Effectiveness Reviews) Reduced Content, During Disposal Phase, Used for OA, and basis for replacement Acquisition LSAR/BCS 1-Representative LSAR Across Life Cycle 2-Predicted3 –Actual / 4&5- Updated Data Maturity 10Pennant Canada Ltd

#1 – BCA for Support Concepts  PROBLEM  Business Case for ISSC decisions  APPROACH  Develop high level representative model with options for mission equipment and support  Enterprise costing data used  VALUE  LCC estimations supported by data  Repeatable & Comparable  EXAMPLE  OC Transpo Bus LCC  TAPV LCC  JUSTAS Pennant Canada Ltd11

#2 – Bid Evaluation  PROBLEM  LCC-based comparison of contenders for long-term ISS  APPROACH  Intermediate (Eqpt+1) level breakdowns  Support Models  Data Quality Risk Assessment  VALUE  Defendable LCC comparisons  Repeatable & accepted  EXAMPLES  LUVW  ISSP Pennant Canada Ltd12

#3 – Sparing/MTA Support  PROBLEM  Spares Solution Unaffordable  APPROACH  Proposed Dataset  Examine alternatives Maintenance Concept Managed Readiness  VALUE  Options & Impacts assessed consistently  EXAMPLE  SIRIUS ($27M  $20M) Pennant Canada Ltd13

#4 – ERP Data Loads  PROBLEM  Getting Industry Data into DND ERP  1000s of IT Tech Objects  APPROACH  Industry LSAR  DND LSAR Merge with DND/NATO data Align with ERP structure  Data load Extracts from DND LSAR  VALUE  Reduced manual effort & Errors  EXAMPLES  Sirius Data management for 5+ years before load; 300  ERP Tech Objects auto  FELEX CSI DND V&V of Industry LSAR  improved LSA Pennant Canada Ltd14

#5 – Publications  PROBLEM  Creating and Maintaining Accurate Maintenance & Parts Pubs/IETMs  APPROACH  LSAR as common source database (GEIA-0007  S1000D)  Parts Manual - +Figures  Maintenance Plan – Export  Maint Manual - +Content  VALUE  Reduced effort & cost  Improved Accuracy/Currency  EXAMPLES  Parts Manuals RCN MY Parts; EMIS/MX  Maintenance Planning RCN NY NPMS  Maintenance Manuals Publisher add-on Pennant Canada Ltd15

#6 – Performance Monitoring and Assessment  PROBLEM  Executing performance monitoring for Equipment Systems (and associated contracts)  APPROACH  LSAR-provided expected values Mission Equipment Metrics Support System Metrics  VALUE  Analysis – based Metrics to assess actual performance  EXAMPLES  MEP-24 BI Cube and processes  Performance Outcomes & Standards Matrix (POSM) Pennant Canada Ltd16

#7 – Maintenance Effectiveness Reviews  PROBLEM  Predicted Preventive Maintenance program exceeds requirements in actual use  APPROACH  Maintenance Effectiveness Reviews  VALUE  Aligning Maintenance to actual use and actual performance  EXAMPLES  HALMOAR/NavSEA ~40% reduction in ship PM Pennant Canada Ltd17

#8 – Mission Planning  PROBLEM  Plan spares for a system for new operational mission  APPROACH  Mission Run for subset on operations  VALUE  Analysis-based spares estimate  Reduced manual labor  EXAMPLES  TAPV LCC estimates  LUVW Afghanistan rework Pennant Canada Ltd18

#9 – Disposal Planning  PROBLEM  Wind down spares inventory as system is withdrawn  APPROACH  Model runs on wind-down plan  Compare needs with existing inventory  Identify surpluses/shortfalls/risks  VALUE  Avoided overstocking as usage reduces  EXAMPLES  IMCS/DCS repairables and spares  Ship/Base Supply Halifax purges on EC installs Pennant Canada Ltd19

DISCUSSION Maintained, Integrated “LSARs” have value across the full life cycle as a common source dataset!! Pennant Canada Ltd20