QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC.

Slides:



Advertisements
Similar presentations
How to release MRP planned orders through OBPM MO/PO create and maintain through OBPM Jim Simunek
Advertisements

Disclaimer. Statements of possible future functionality for IFS’ software products and technology are for information purposes only and should not be interpreted.
Operations Scheduling
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Strategic Decisions (Part II)
QAD Item Attributes and Quality Control Forrest Mori – Principal Business Analyst West Coast User Group, February 11, 2013.
Manufacturing : Scheduling to Execution Joseph A. Phelan, CPIM 11 May, 2011 Session : BT2 Product Roadmap and Direction.
Serialization, Item Attributes & Quality Control Hank Canitz – Sr. Director Industry Solutions, QAD Marketing QAD Midwest User Group.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review Carianne Nieuwstraten, QAD Product Manager MWUG, March 20, 2012.
The Production Process
Material Requirements Planning (MRP)
INDUSTRIAL & SYSTEMS ENGINEERING
High Lights of SAP Business One for Manufacturing.
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Increase Your Manufacturing Efficiency with QAD’s Planning and Scheduling Workbenches Gary Wasserman – Applications Specialist.
QAD Planning and Scheduling Workbenches Carianne Nieuwstraten, Product Manager, QAD. Inc Ben Crawford, CSCP, Production and Inventory Control Manager,
Simplifying Industry Compliance, Materials Management, and Quality Control Carianne Nieuwstraten – Sr. Product Manager, QAD R&D MFG Midwest User Group.
QAD Customer Day – Santa Clara, CA QAD SERIALIZATION, ITEM ATTRIBUTES, QUALITY CONTROL & LOT TRACE WORKBENCH Simplifying Industry Compliance, Materials.
Production Scheduling: What Tool is Right for You?
QAD Business Intelligence: A Closer Look Luc Janssen Director, Product Management, QAD Inc. QAD Explore 2012.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Manufacturing Futures
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
QAD Routings Implementation Sheri Forrest – RFBP Nadia Truxell – Logan Consulting.
Production Planning and Control Introduction
QAD Master Scheduling Workbench (QAD MSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
1 Example: MRP Schedule LocoMopeds is a manufacturer of off-road mopeds. The following product structure diagram represents the bill of materials for.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Collaboration among sales, production, planning, purchasing, maintenance and management to positively impact the bottom line.
Production Activity Control
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Lecture Outline 5 Manufacturing Systems (Production and Operations Management) p. 304+
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Pam Lopker March QAD Proprietary Op Budget ROI Efficiency Training.
Increase Your Manufacturing Efficiency with QAD’s Planning and Scheduling Workbenches Carianne Nieuwstraten – Senior Product Manager, QAD Chris Loerch.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
QAD Manufacturing Solution Enhancements for 2012 March 12, 2012 QAD Midwest User Group Meeting.
Intelligent Supply Chain Management Strategic Supply Chain Management
Activity Scheduling and Control
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
Basics of Supply Chain Management
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
PRODUCTION PLANNING AND CONTROL (PPC). PLANNING CONTROL CONTROL PRODUCTION.
QAD Customer Day – Santa Clara, CA QAD Customer Value Day WELCOME!
Manufacturing Update: Rising To The Challenge Carianne Nieuwstraten – Sr. Product Manager, QAD R&D MFG September 23, 2014 Midwest User Group.
LESSON 5 Introduction to Materials Requirements Planning (MRP)
AXUG Partner Showcase – Introducing Preactor
Make-to-Stock Scenario Overview
QAD Browses.
Facility Inventory Old Facilities Modern Facilities Classroom Size
Make-to-Stock Scenario Overview
The Production Process
When You Can See It, You Can Believe It.
Material Requirements Planning (MRP)
Operations Management
Incorporating lot sizing into MRP
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization Fall, 2012.
Manufacturing Planning and Control
Presentation transcript:

QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG - 03/22/2010

QAD Proprietary Agenda  MFG/SC - Key Strategic Initiative  Production Scheduling Objective & Challenges  Workbench Framework Introduction  Roadmap  Production Scheduling Futures  Demo  Early Adopter Program  Wrap Up

QAD Proprietary Key Strategic Initiative Provide a workbench for each key role in the Manufacturing and Supply Chain areas

QAD Proprietary Production Planning & Execution Production Scheduling Workbench (PSW) Master Schedule Workbench (MSW) Production SchedulingRelease To shop FloorExecutionMaster Scheduling Months-Weeks-DaysDay-Shift-IntervalsDays Component Available Check (CAC) Integration Maximize Production Efficiency Release to production with verification of available materials Create a masterschedule balancedto Supply /Demand/Resources Production Planning & Execution

QAD Proprietary Production Scheduler’s Objective  Establish a Production Schedule that Meets Requirements – Measurements : On Time Production Deliveries – Minimize order lateness Short Lead Times – Better Customer Responsiveness Minimal Work-In-Process – Reduced inventory investment – Improving quality Maximum Utilization of Resources – Machines – Materials – Manpower » Reduced set up costs/time

QAD Proprietary Production Scheduler’s Challenge Finance Engineering Materials Manufacturing Quality Work-In-Process inventory is too high and there seems to be excessive labor costs. Engineering Change Orders must be implemented smoothly to the shop floor. Are all production compliance issues and procedures being followed and met? Why are scrap costs rising? Do you have all the material to start production? Supplier “X” will be late with their order! There are too many last minute changes! Have you planned for machine downtimes? Will you meet production due dates? Five workers are out sick!

QAD Proprietary Production Scheduling Challenge

QAD Proprietary Common Scheduling Situation

MSW & PSW Framework Introduction

QAD Proprietary Planning & Scheduling – Future Flow Period - > Month - > Week - > Day - > Shift - > Interval - > hour Initial plan is created by the system MRP (traditional) Leveling (new) GRC (new) Demand Received Balance demand / supply /resources to ensure a feasible and level production plan. Production Planned Sequence production orders by item attributes and resource allocations to Optimize shop floor Production Scheduled Verify materials available Release orders Print work orders and schedules Production Dispatched Monitor Production & Manage Production Order Production Reported Base MSW PSW Production Planned (MSW) Capacity & Load Planning Capacity & Load Planning Manage Scheduling Horizon Manage Scheduling Horizon Apply Data Groupings/Filters Apply Data Groupings/Filters Select Views (daily-weekly-monthly) Select Views (daily-weekly-monthly) Apply Totaling (KYB) Apply Totaling (KYB) Apply Leveling (KYB) Apply Leveling (KYB) Production Planned (MSW) Capacity & Load Planning Capacity & Load Planning Manage Scheduling Horizon Manage Scheduling Horizon Apply Data Groupings/Filters Apply Data Groupings/Filters Select Views (daily-weekly-monthly) Select Views (daily-weekly-monthly) Apply Totaling (KYB) Apply Totaling (KYB) Apply Leveling (KYB) Apply Leveling (KYB) Production Planned (Base) Auto-Firm Auto-Firm Manage Production Order Manage Production Order  Header Attributes  Operation Attributes  Date & Times Production Planned (Base) Auto-Firm Auto-Firm Manage Production Order Manage Production Order  Header Attributes  Operation Attributes  Date & Times Many new capabilities + 60> reports, inquiries, maintenance and process programs rolled up into the new Production Scheduler Production Planned Production Scheduled Production Dispatched Production ReportedDemand received CAC Demand Received (MSW) Exception Based Visual Indicators Exception Based Visual Indicators Filtering by Exceptions Filtering by Exceptions Control Content - Demand/Supply Control Content - Demand/Supply Control Demand Sources Control Demand Sources Demand Received (MSW) Exception Based Visual Indicators Exception Based Visual Indicators Filtering by Exceptions Filtering by Exceptions Control Content - Demand/Supply Control Content - Demand/Supply Control Demand Sources Control Demand Sources Demand Received (Base) Integrated CRP calculates operation dates Integrated CRP calculates operation dates Demand Detail Drilldown Demand Detail Drilldown Monitor Inventory Monitor Inventory Demand Received (Base) Integrated CRP calculates operation dates Integrated CRP calculates operation dates Demand Detail Drilldown Demand Detail Drilldown Monitor Inventory Monitor Inventory Production Dispatched (PSW) Multi-Select Multi-Select Auto Release Auto Release Export Dispatch List To Excel Export Dispatch List To Excel(MSW) Export Schedule To Excel Export Schedule To Excel Production Dispatched (PSW) Multi-Select Multi-Select Auto Release Auto Release Export Dispatch List To Excel Export Dispatch List To Excel(MSW) Export Schedule To Excel Export Schedule To Excel Production Dispatched (Base) Integrated Component Availability Check Integrated Component Availability Check Integrated Single & Multi WO Print Integrated Single & Multi WO Print View only security for shop floor personnel View only security for shop floor personnel Production Dispatched (Base) Integrated Component Availability Check Integrated Component Availability Check Integrated Single & Multi WO Print Integrated Single & Multi WO Print View only security for shop floor personnel View only security for shop floor personnel Production Reported (PSW) (MSW) Monitor activity with visual completion indicators Monitor activity with visual completion indicators Production Reported (PSW) (MSW) Monitor activity with visual completion indicators Monitor activity with visual completion indicators Production Reported (Base) Monitor WIP of production order Monitor WIP of production order Monitor WIP of operations Monitor WIP of operations Monitor WIP of production cum Monitor WIP of production cum Production Reported (Base) Monitor WIP of production order Monitor WIP of production order Monitor WIP of operations Monitor WIP of operations Monitor WIP of production cum Monitor WIP of production cum MSW PSW Base CAC MSW/PSW/CAC Together - Consolidation of 50 maintenance, report and inquiry programs - New capabilities (production scheduling, integrated component checking)

QAD Proprietary Framework Introduction Master Scheduling (MSW) Scheduling view designed for the purpose of master scheduling

QAD Proprietary Framework Introduction Production Scheduling (PSW) Scheduling view designed for the purpose of production scheduling

QAD Proprietary Framework Introduction Search Panel extracts content for both workbench views Navigator Panel drives content focus of both workbench views Supporting Frames apply seamlessly to both workbench views

PSW: Layout Introduction

QAD Proprietary Production Order Browse Locate un-sequenced production orders by attributes (red/yellow) (large/small) Production Order Sequence Grid Schedule and sequence production orders by item attributes - Create a schedule by (release date, shift, sequence) Drag & Drop the orders to the desired position on the Sequence Grid Production Order Maintenance View and maintain all order details

QAD Proprietary

PSW: Views Create customized workbench layouts

QAD Proprietary Views Provides ability to create different user defined workbench layouts and save them for quick access Saves Filter/Sort/Group Settings of each Panel Saves Panel Size

QAD Proprietary Example: Created View with Master Scheduling (MSW) and Production Scheduling (PSW) side-by-side

QAD Proprietary Standard Edition June 2010 : QAD 2010 SE release  Core Functionality : - Production Scheduling Workbench (PSW)  Order Based - PSW integrated Component Check Capabilities PSW Roadmap

QAD Proprietary Enterprise Edition September 2010 : QAD EE release  Core Functionality : - Production Scheduling Workbench (PSW)  Order Based - PSW integrated Component Check Capabilities PSW Roadmap

QAD Proprietary Op 10 Work Center Extrude Day 1 Day 2Day 3 Routing Operations Pacemaker – Flow rate across all operations Day 4 WO Release Date Op 20 Work Center Assemble Op 30 Work Center Paint Op 40 Work Center Inspect Pacemaker-OP WO Due Date OP 20 Release/Due Order Based Scheduling Single Operation Scheduling Multi Operation Scheduling WO Release Date WO Due Date Scheduled-OP OP Release/Due Order Release Date WO Due Date Scheduled-OP OP Release/Due Production Line / Process

QAD Proprietary Enterprise Edition March 2011 : QAD 2011 EE release*  Core Functionality : - Production Scheduling Workbench (PSW)  Operational Scheduling * Subject to change PSW Roadmap

QAD Proprietary WO & Date Conflict! WO Due Date Anchored? Operation Conflict! DueRelease DueRelease Due ReleaseDue 4 days (WO Duration) 4 days (WO Duration).8 days (Inter-OP Duration).8 days (Inter-OP Duration) 1.5 days (OP Duration) 1.5 days (OP Duration) Operation Sequenced? No Back Schedule Date Conflict! Yes 5 days (WO Duration) 5 days (WO Duration) No Alternate Scenario Operational Scheduling

Demo

QAD Proprietary Production Scheduling Workbench Value  Reduces production scheduling time and complexity  Increases shop floor optimization  Ability to simulate changes  Removes need for spreadsheets

QAD Proprietary Interested In Being An Early Adopter?  Early Adopter Criteria: –.Net use with QAD Enterprise Applications – eB2.1, SP4 or higher – Using QAD Enterprise Applications Discrete Work Orders or Advanced Repetitive No or verified customizations – High data integrity/accuracy BOM’s, inventory records, clean MRP data etc. – Verified business need for MSW, PSW and integrated component check capabilities – Resource availability from May 10 th through around July 12 th Project Manager, Master Scheduler, Production Scheduler, Material Planner availability – Go live within the May 10 th – July 12 th time period

QAD Proprietary QAD Demo Center  MSW and PSW  Tuesday, March 23 rd : 8:30 – 11:30am  Step through specific business scenarios You ask, we show  Come talk to us!

QAD Proprietary Contact Information  Carianne Nieuwstraten Phone:  Brent Shooltz Phone: