ד"ר שי רוזנס 1. Capacity Requirements Planning (CRP) מודול ממערכת ה MRP המשמש לתכנון קיבולת ייצור והמזהה עומסים הגרמים מתכנון ההזמנות (planned order releases.

Slides:



Advertisements
Similar presentations
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Advertisements

© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
WEEK 05A – CAPACITY PLANNING AND CONTROL (CHAPTER 7S) Definitions, capacity measurement, MRP II and capacity, utilization, efficiency, breakeven SJSU Bus.
Materials Requirements Planning
Rev. 11/30/03SJSU Bus David Bentley1 Chapter 5 – Capacity Planning and Control Definitions, capacity measurement, MRP II and capacity, utilization,
Material Requirements Planning (MRP)
Materials Requirements Planning. Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance.
Perencanaan Kapasitas Produksi
Chapter 5 – Capacity Planning and Control
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 6 th Edition Chapter.
Production Planning & Control
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
Production and Service Systems Operations
Operations Scheduling. Scheduling in a Process-Focused Environment.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Production Activity Control
Production Planning and Control Introduction
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 5 th Edition Chapter.
Capacity Requirements Planning (CRP). Capacity requirements planning (CRP) “A computerized system that projects the load from a given Material Requirements.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 13 Material Requirements Planning.
Week #14-2 Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Sales and Operations Planning
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
1 Example: MRP Schedule LocoMopeds is a manufacturer of off-road mopeds. The following product structure diagram represents the bill of materials for.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Resource Requirements Planning:
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Master Production Scheduling Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004.
Chapter 12a Resource Requirements Planning: MRP and CRP.
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 15.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
Materials Requirements Planning. Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Resource.
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 15.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Resource.
Activity Scheduling and Control
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 12 Enterprise Resource Planning.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
SchedulingProducingControllingSchedulingProducingControlling.
Basics of Supply Chain Management
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Capacity Planning and Utilization
MRP and ERP  Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
XII. PERENCANAAN KEBUTUHAN MATERIAL (MATERIAL REQUIREMENT PLANNING)
Master Production Scheduling (MPS)
Inputs and Outputs to Aggregate Production Planning
Facility Inventory Old Facilities Modern Facilities Classroom Size
PRODUCTION ACTIVITY CONTROL (PAC)
Introduction to Materials Management
PRODUCTION ACTIVITY CONTROL (PAC)
Outline Questions? Quiz on Thursday Any Questions on MRP Records?
Capacity Planning.
Resource Planning Chapter 16
Inputs and Outputs to Aggregate Production Planning
Inputs and Outputs to Aggregate Production Planning
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Presentation transcript:

ד"ר שי רוזנס 1

Capacity Requirements Planning (CRP) מודול ממערכת ה MRP המשמש לתכנון קיבולת ייצור והמזהה עומסים הגרמים מתכנון ההזמנות (planned order releases ). מייצר פרופיל עומס. מזהה עומס יתר וזמני בטלה.

ד"ר שי רוזנס3 Capacity Requirements Planning Routing file Capacity requirements planning Open orders file MRP planned order releases Load profile for each machine center

ד"ר שי רוזנס4 Capacity Terms Load profile - compares released and planned orders with work center capacity Capacity - productive capability; Includes utilization and efficiency Utilization - % of available working time spent working Efficiency - performance compared to a standard Load - the standard hours of work assigned to a facility Load percent - the ratio of load to capacity

ד"ר שי רוזנס5 פרופיל עומס התחלתי Time (weeks) Normal capacity Hours of capacity

ד"ר שי רוזנס6 פרופיל עומס מתוקן Time (weeks) Work an extra shift Push back Pull ahead Overtime Hours of capacity

ד"ר שי רוזנס חישוב הקיבולת 2 מכונות, 2 מפעילים 5 ימים/שבוע, 8 שעות/יום 1/2 שעה הפסקה, ½ שעת תחזוקה לכל יום. יעילות = 100% נצילות = = 7/9 87.5% קיבולת יומית = 2 מכונות x 2 משמרות x 8 שעות/משמרתx100% יעילות x 87.5% נצילות = 28 שעות או 1,680 דקות

ד"ר שי רוזנס הגדרת עומס (500 x 0.08)= , (1,000 x 0.10)= , (5,000 x 0.12)= , (10,000 x 0.14)=1, , (2,000 x 0.10) = min אחוז עומס = 2,385.7 / 1,680 = 1.42 x 100% = 142% הוספת משמרת נוספת: קיבולת יומית = 2 מכונות x 3 משמרות x 8 שעות/משמרת x 100% יעילות x 87.5% נצילות= 42 שעות = 2,520 דקות אחוז עומס מתוקן = 2,385.7 / 2,520 = x 100% = 94.67% עבודה זמן זמן ריצה זמן זמן ריצה # כמות כיוונון ( דק ') ליחידה כיוונון (min/unit) סה " כ זמן

ד"ר שי רוזנס9 Capacity Requirements Date:Week: 32 Plant 01 Dept. 03: Lathe Station Capacity: 320 hours per week Week Planned hours Actual hours Total hours

ד"ר שי רוזנס10 Capacity Requirements הקיבולת הצפויה תחרוג מעבר לקיבולת הקיימת Date:Week: 32 Plant 01 Dept. 03: Lathe Station Capacity: 320 hours per week Week Planned hours Actual hours Total hours

ד"ר שי רוזנס11 Input-output Report Workstation: Rough MillWeek: 32 Tolerance:  25 hours Week Ending Planned Actual Cumulative deviation Planned Actual Cumulative deviation Inputs Outputs

ד"ר שי רוזנס12 Input-output Report Planned Actual Cumulative deviation Planned Actual Cumulative deviation Workstation: Rough MillWeek: 32 Tolerance:  25 hours Week Ending Inputs Outputs הסבר: הסטייה המצטברת המותרת הינה בין 25+ לבין 25 – שעות.

ד"ר שי רוזנס13 Input-output Report הסבר: הסטייה המצטברת חרגה מעבר לגבול התחתון המותר השעות בפועל יהיו מעל למתוכנן ויש לנקוט בצעדים לתיקון המצב Planned Actual Cumulative deviation Planned Actual Cumulative deviation Workstation: Rough MillWeek: 32 Tolerance:  25 hours Week Ending Inputs Outputs הסבר: הסטייה המצטברת המותרת הינה בין 25+ לבין 25 – שעות.

ד"ר שי רוזנס תרופות לתת עומס Under loads דרוש עוד עבודה. קדם עבודה שתוזמנה לביצוע בתקופה מאוחרת יותר. הקטן את הקיבולת הסטנדרטית.

ד"ר שי רוזנס תרופות לעומס יתר Overloads הוצא דרישות לא נחוצות. נתב עבודות למרכזי עבודה אחרים. פצל מנות בין שתי מכונות או יותר. הגדלת הקיבולת. פנייה לקבלנות משנה. הגדל את יעילות מרכזי העבודה.

ד"ר שי רוזנס תרופות לעומס יתר Overloads דחה עבודות עד כמה שניתן. עדכן את זימון האב ( MPS). בצע שעות נוספות. קיים משמרות נוספות.

ד"ר שי רוזנס פיצול הזמנות יש עומס על המחרטה יש להעביר לכרסומת. מכונהזמן כוונוןזמן הפעלה מחרטה 30 דקות5 דקות כרסומת 45 דקות10 דקות שלוש אלטרנטיבות ייצוריות : 1.ייצר 100 יחידות על המחרטה. 2.חלק 50:50 בין המחרטה לכרסומת. 3.חלוקה אופטימלית בין המכונות.

ד"ר שי רוזנס פתרון: חלופות 1,2 1. ייצור 100 יחידות על המחרטה: (100) = 530 min 2. חלוקת 50:50 בין המכונות: (50) = 280 min on lathe (50) = 545 min on mill זמן סיום העבודה : 545 דקות.

ד"ר שי רוזנס פתרון: חלופה 3 3. חלוקה אופטימלית X על המחרטה ( X – 100 ) על הכרסומת x = (100-x) 5x = x 15x = 1015 x = or 68 units on lathe,(100-x) = 32 units on mill דקות מחרטה :30 + 5(68) = 370 דקות כרסומת : (32) = 365 זמן סיום העבודה : 370 דקות.

ד"ר שי רוזנס Manufacturing Resource Planning (MRP II) הרחבה של MRP. תכנון כל המשאבים הנדרשים לעסק. השינויים הקיימים ב MRP II: Service Requirements Planning (SRP). Business Requirements Planning (BRP). Distribution Requirements Planning (DRP).

ד"ר שי רוזנס MRP II Modules Forecasting Customer order entry Production planning / master production scheduling Product structure / bill-of-material processor Inventory control Material requirements planning Capacity planning Shop floor control Purchasing Accounting Financial analysis

ד"ר שי רוזנס22 MRP II Flowchart Feasible? Marketing Plan Financial Plan Business Plan Production Plan No more Yes

ד"ר שי רוזנס23 Master production schedule Material requirements planning Capacity requirements planning Manufacture Inventory Shop floor control Purchase orders Work orders Feasible? No Yes Feedback