Assessing Maintenance Effectiveness and Efficiency How is your maintenance dollar used, breakdown, inspection, improvements, demolition, operational support,

Slides:



Advertisements
Similar presentations
Job Hazard Analysis I. Speaker’s Notes:
Advertisements

MAINTENANCE PLANNING AND SCHEDULING
Total Productive Maintenance
Five to Ten Year Vision for CBM by: John S. Mitchell for: ATP Fall Meeting -- Condition Based Maintenance Workshop November 17, 1998, Atlanta Georgia.
KPI Familiarisation.
Job Hazard Analysis. © Business & Legal Reports, Inc Session Objectives Identify the purpose of JHA Recognize the benefits of JHA Understand the.
Pre-quiz: Test Your Knowledge
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
ABB Reliability Fingerprint
Environmental Management Systems An Overview With Practical Applications.
INDUSTRIAL & SYSTEMS ENGINEERING
Unit 8: Tests, Training, and Exercises Unit Introduction and Overview Unit objectives:  Define and explain the terms tests, training, and exercises. 
Maintenance Work Measurement
Maintenance Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March.
Computerised Maintenance Management Systems
© 2013 BOS Solutions Ltd. Revised: Mar 15,2013 Version 2 – BOS HSE MSpg. 1 The BOS HSE Management System Brad Whitaker, MSPH, CSP BOS Solutions HSE Director.
Objectives  Understand what a Loss Incident is.  Know the real cost of a Loss Incident.  Understand the Causes of a Loss Incident.  Understand what.
SAFETY AND HEALTH PROGRAMS 1. This presentation is adapted from the OSHA Safety and Health Programs presentation available on the OSHA website. CREDITS.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15S Maintenance.
Copyright 2005 – Kristen S. Kurland, Carnegie Mellon University Managing Furniture and Equipment Assets.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
EHS Management System Elements
Reaching Goals: Plans and Controls
Operations Management Maintenance and Reliability 保養維護與可靠程度 Chapter 17
MAINTENANCE STANDARDS & PLANNING
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT Kumar Gyanendra Mohan
ISO OPERATIONAL CONTROL
Material Handling & Lifting Resource
CHALLENGES IN MAINTENANCE FUNCTIONS
CASE STUDY EXAMPLE Work Process Flow Charts. WORK IDENTIFICATION / WORK ORDER PROCESSING Review Notification Asset Coordinator Notification complete and.
Presentation on Preventive Maintenance
Risk Management and PINs Why risk management is so important Why HSRs should be “qualified” to issue PINs 1 Training & Safety Consultants.
Colorado Rural Electric Association 2009 Loss Control Conference NEAR MISSES REPORT/LEARN/USE Presented By: Eldon Humphers, CLCP-CUSA July 14, 2009.
Hazards Identification and Risk Assessment
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Job Hazard Analysis.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Division of Risk Management State of Florida Loss Prevention Program.
Course of Study 5. Maintenance Management Assessing Maintenance Needs
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
PMO2000™ 1 Improved Reliability through PM Optimisation Project Team: Electrician Planner Mechanic Operator Reliability Engineer.
Computerised Maintenance Management Systems
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
Maintenance Management [14]
Modern Maintenance. Management
OUTAGE MANAGEMENT. OUTAGE APPROACH/PHILOSOPHY A) Time based / machine operating hours based concept related to OEM recommendations - More expensive than.
SOLGM Wanaka Retreat Health and Safety at Work Act 2015 Ready? 4 February 2016 Samantha Turner Partner DDI: Mob:
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Planning and Organizing Chapter 13. The Planning Function Planning for a business should stem from the company’s Business Plan – The business plan sets.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
OHSAS Occupational health and safety management system.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Maintenance Management
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
1 Identification & Elimination of High Potentials Lessons Learned - Discussion.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
MAINTENANCE ENGINEERING
Maintenance Scheduling
Small Sites Planning & Scheduling
Chapter 16 Supplement Maintenance.
15S Maintenance.
MAINTENANCE PLANNING AND SCHEDULING
Operations Management
Management of Change Report Errors to Management.
KPI Familiarisation
Operations Management
Unit I Module 3 - RCM Terminology and Concepts
Operations Management
Presentation transcript:

Assessing Maintenance Effectiveness and Efficiency How is your maintenance dollar used, breakdown, inspection, improvements, demolition, operational support, or capital expense? Do you have a "value added" assessment process? Are preventive maintenance activities/critical inspections are at their optimum? The right frequency, accurate plans, no sacred cows. What is the typical environment maintenance personnel work in, reactive or proactive. How do you know? What's the average lead time for planning and scheduling. How accurate and effective is your maintenance schedule, start and finish time, equipment readiness, material and tool requirements, coordination, lockout tag out requirements identified, permit requirements, plan versus actual What is the average time required to obtain a safe work permit? do you have the available resources or schedules to optimize. Time on tools, are you working the most effective schedule, what are your current work practices, how much time do you actually have to perform maintenance work. Maintenance effectiveness survey (survey to obtain perspective from operations and maintenance personnel as to your current maintenance work process) When was the last time you've managed by wandering around? you get what you inspect not what you expect.

Assessing Maintenance Effectiveness and Efficiency How is your maintenance dollar used, breakdown, inspection, improvements, demolition, operational support, or capital expense? Maintenance: 10Predictive/Preventive Maintenance (P/PM) Material, labor or equipment used in the prediction or prevention of routine maintenance or failures. This would include all work associated with the 10 PPM Elements such as services for lube oil and vibration analyses, regularly scheduled oil or filter changes, regularly scheduled inspections, root cause analysis investigations, etc. 20Repair Maintenance Normal work performed on equipment. This includes repairs due to failures, normal wear, process upset that mechanically damages the equipment, and work performed to correct problems that were identified as a result of using predictive tools (such as vibration analysis, non-destructive evaluation (NDE), or routine inspections). It also includes painting or insulation work that is done as part of a repair. 30Project Maintenance Includes any planned shutdowns or "planned projects" that modify, refurbish or replace facilities which are intended to reduce maintenance cost, or to improve reliability, and yet do not meet the capitalization rules. These expenditures are normally not recurring. Projects which install new and improved** equipment or materials and increase the asset base are not included in maintenance.

Assessing Maintenance Effectiveness and Efficiency Non-Maintenance 60Process Cleaning Chemical cleaning, hydro blasting, grit blasting, etc., of mechanical equipment, exchangers, vessels and piping. 70Environmental This includes activities such as clean up of process spills, pond closures and other remediation. 80Engineering Work that will be recharged to an engineering account. 90Start-Up This includes expenses preparatory to, as well as those resulting from actual start-up of a new or major expanded facility. This work is always done on a special account assigned by the Accounting function. The work must meet their pre-determined guidelines before the account will be assigned. 100Process Reconfiguring Any work done to reorganize the equipment or piping when two or more products are routinely produced in the same equipment. This would not include any cleaning that is involved, as this should be included with "Process Cleaning".

Assessing Maintenance Effectiveness and Efficiency Non-Maintenance 110Capital Projects that will be charged to a capital authorization. 120Project/Improvement Activity that may modify assets but do not reduce maintenance cost, or improve reliability. Improvements that do not meet the capitalization requirement. This would include any modifications for safety or quality purposes. These expenditures are normally not recurring. 130Demolition Removal of equipment or facilities that are no longer needed and will not be re-installed or replaced. 140Other All other activities that are not defined as maintenance, environmental or capital. This includes work such as contract labor for operations (bagging laborers, etc.), routine clean-up of facilities.

Assessing Maintenance Effectiveness and Efficiency Do you have a "value added" assessment process?

Assessing Maintenance Effectiveness and Efficiency Are preventive maintenance activities/critical inspections are at their optimum? The right frequency, accurate plans, no sacred cows. To FrequentTo Infrequent

Assessing Maintenance Effectiveness and Efficiency What is the typical environment maintenance personnel work in, reactive or proactive. How do you know? Lead Time Vs Resource Utilization What is the average lead time you get for a job ? Manage Resources Sharing Enabled Reactive E-Job % High Utilization 30%-40% 40%-50% 50%-60% 60%- 100% Days

Assessing Maintenance Effectiveness and Efficiency What's the average lead time for planning and scheduling. Five Day Schedule Work Request Work Order Plan MTWTFSSMTWTF Execute The Schedule Non - Work Create Schedule Communicate Schedule Coordinate Resources Define Needs Net Capacity Lead Time Current WeekNext Week

Assessing Maintenance Effectiveness and Efficiency How accurate and effective is your maintenance schedule, start and finish time, equipment readiness, material and tool requirements, coordination, lockout tag out requirements identified, permit requirements, plan versus actual.

Assessing Maintenance Effectiveness and Efficiency

What is the average time required to obtain a safe work permit? do you have the available resources or schedules to optimize. What is the average time to acquire an typical safe work permit? Do you require a safe work permit for all maintenance work? How many permits are required per day? How many permit writers are available? Do you stager maintenance start times to accommodate issuing safe permit? Have you completed risk assessments for levels of safe permit requirements?

Assessing Maintenance Effectiveness and Efficiency Time on tools, are you working the most effective schedule, what are your current work practices, how much time do you actually have to perform maintenance work. Eight Hour Day 7:308:309:3010:3011:3012:001:002:003:004:00 Legend Wrench Time Safety Meeting Job Line Up Travel Break Lunch Wash Up Wrench Time 28 Hours 45 Minutes per week Wrench Time 31 Hours per week Ten Hour Day 7:008:009:0010:0011:0012:0012:301:302:303:304:305:30

Assessing Maintenance Effectiveness and Efficiency Maintenance effectiveness survey (survey to obtain perspective from operations and maintenance personnel as to your current maintenance work process)

Assessing Maintenance Effectiveness and Efficiency

When was the last time you've managed by wandering around? You get what you inspect not what you expect. When did you last attend a morning tail gate and job lineup? Have you observed the control room at the start of the work day? When was the last time you reviewed a routine job plan with your planner? When was the last time you randomly picked a job from the daily schedule and observed with the maintenance supervisor if the activates were occurring as scheduled? Have you made radium observations to asses time on tools? Have you meet with the planner and maintenance supervisor to review plan Vs actual on routine schedules?

HEART OF THE MAINTENANCE WORK PROCESS ‘Fix it when you can’ mentality Operators trained in troubleshooting techniques, certain minor maintenance activities, and defined Operator Assisted Maintenance duties. Operators are identified as the primary equipment owners. Value Added work requests. All personnel are trained to correctly write a work request / notification and evaluate each work request / notification as to whether or not it adds value to the unit/business. Operations/Maintenance Coordinator Concept Person performing the OMC Role must have an in depth knowledge of Unit Operations, Maintenance Procedures and Business plans. The individual must be capable of making difficult decisions and challenging “Sacred Cows”. This person must also have the full support of the Operations Leadership. Value Added Focus Business rules are established Projects and improvements are reviewed to insure value creation. Inspections and Predictive/Preventive task are optimized. All jobs approved meet business needs. A culture must be created where personnel recognize the need to be realistic in setting priorities for work. The system will drive out unnecessary schedule interruptions. Reliance on retrieval of previous planned and critiqued jobs. Archived planned jobs are available. Planners use common planning practices to improve quality and reduce variability in the planning process The ability of the computerized maintenance management system to retrieve developed job plans. Job Packages include cost estimate Planners focus their effort on future work. Interruptions are planned and executed by the execution supervisor.

HEART OF THE MAINTENANCE WORK PROCESS Resource Management and Scheduling. Planned work is scheduled on a weekly basis Standard planning process for Daily Planning and Turnaround Planning Scheduler Focused on meeting Operations needs while optimizing Maintenance resources. Schedule provides site integration. Final Approval and Cost Control is the responsibility of Operations Gatekeeper Work will be completed safely without environmental insults and will comply with regulatory requirements. Procedures exist. Employees must be trained to use proper procedures There should be an understanding of the interrelationships of all of the work processes in order for seamless “handoffs” to occur. Completed work is analyzed for improvement opportunities. A culture exists that encourages continuous improvement. Accurate and complete data must be recorded in CMMS such that the Improvement Process can be successful. Each job should be evaluated for areas of improvements i.e. equipment reliability using RCFA, job plans, etc. Key performance indicators are used to manage Work Process Key performance indicators are identified, measured, monitored and communicated. Every one in the organization owns some part of the work process. Each person is responsible and accountable for their role. They measure the outcome of the activities that they control.