Injector MD planning and requests for 2014 Giovanni Rumolo and Hannes Bartosik Thanks to all MD users, machine supervisors, operators, experts … MSWG meeting,

Slides:



Advertisements
Similar presentations
Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
SPS scrubbing run in 2014 H. Bartosik, G. Iadarola, G. Rumolo LHC Performance Workshop (Chamonix 2014), 22/9/2014 Many thanks to: G. Arduini, T. Argyropoulos,
H. Damerau, S. Hancock, LHC Beam Studies Review 28/08/2012 PS: the Longitudinal Plane 1 H. Damerau, S. Hancock LIU Beam Studies Review Meeting 28 August.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni, Hannes Bartosik, Sandra Aumon 27/06/2012 ICE.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
Collected by E. Jensen, BE-RF 1 ATOP days RF limitations.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
SPS Scrubbing Runs 2014 week 45 and week 50 (part I) H. Bartosik, G. Iadarola, K. Li, L. Mether, G. Rumolo, M. Schenk Thanks to: SPS OP crew, G. Arduini,
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni 05/06/2012 LIU-PS meeting, CERN.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
Lessons from SPS studies in 2010 E. Shaposhnikova Chamonix’11 session 09: LHC injectors upgrade.
E.M, PS-OP shut-down lectures, 20/02/ u Requirements of the LHC on its injectors u What are the nominal & already achieved beams at PS exit? u How.
Update on injection studies of LHC beams from Linac4 V. Forte (BE/ABP-HSC) Acknowledgements: J. Abelleira, C. Bracco, E. Benedetto, S. Hancock, M. Kowalska.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Coupled bunch instabilities in the CERN PS
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
Space charge studies at the CERN PS A. Huschauer, Raymond Wasef H. Damerau, S. Gilardoni, S.Hancock, D. Schoerling, R. Steerenberg Acknowledgements: All.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Progress on e-cloud effects (PS and SPS) G. Iadarola, H.Bartosik, G. Rumolo, M. Taborelli, C. Yin Vallgren Many thanks to: G. Arduini, T. Argyropoulos,
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Longitudinal Limitations of Beams for the LHC in the CERN PS 0.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
PS beam dynamics issues in view of LHC beams upgrade: brief status and prospects G. Rumolo (Beam Dynamics for the PSB/PS Upgrade Working Groups), based.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
A preliminary overview on the 2014 Scrubbing Run II The scrubbing team, i.e. H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, B. Salvant,
LIU-PS Beam Dynamics Working Group Introduction and objectives
Lead performance throughout the injector chain with focus on LEIR
Longitudinal impedance of the SPS
Space charge studies at the SPS
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
Summary of the dedicated MD on July 4th 50ns in SPS with nominal and low γt optics – transverse aspects T. Argyropoulos, H. Bartosik, T. Bohl, A. Burov,
Proposals for 2015 impedance-related MD requests for PSB and SPS
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Multiturn extraction for PS2
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
The LHC25ns cycle in the PS Triple splitting after 2nd injection
Introduction to LHC beam production in PSB and PS
Saturday 7th May Sat – Sun night
MSWG Report – SPS OP Crew
News on TMCI in the SPS: Injecting high intensity bunches
Beam dynamics requirements after LS2
Collective effects in the SPS and LHC (longitudinal plane)
CERN-SPS horizontal instability
Presentation transcript:

Injector MD planning and requests for 2014 Giovanni Rumolo and Hannes Bartosik Thanks to all MD users, machine supervisors, operators, experts … MSWG meeting, 30 May

2 Machine start up and beginning of the MDs PSBPS SPS MSWG meeting, 30/05/2014

3 Machine start up and beginning of the MDs Start of Start of MSWG meeting, 30/05/ h dedicated MD & PS

4 Machine start up and beginning of the MDs Start of Scrubbing run 80h dedicated MD + 2 x 24h UA9 MSWG meeting, 30/05/2014

5 Organisation of the MDs Parallel MDs → Always one cycle available in the PSB and PS mainly during working hours (i.e. working days from 8:00 to 18:00)  In 2012/13 MD schedule in the PS was based on a doodle among the users  In 2014, weekly meetings will take place on Fridays in the CCC Glassbox with both PSB and PS MD users with primary goal to establish the MD schedule for the following week.  Schedule published on MD page soon after meeting → One short MD cycle in parallel with physics also in the SPS  Is Ar ion cycle set up also considered as an MD? Dedicated MD blocks → 10h blocks will be available on Wednesdays for dedicated MDs (can we move to 12h to improve efficiency, especially in case of two users?)  PSB, PS  MD users have priority over physics users, but physics users will be served on a best effort basis  SPS  FT physics is stopped and MD users share the supercycle MSWG meeting, 30/05/2014

6 Organisation of the MDs Cycle creation and naming convention → No MDs on operational cycles → To avoid uncontrolled proliferation of machine cycles, MD users will be asked to create and subsequently work on their own cycles (which will be mapped on free timing users at the time of the MD)  Clone cycle closer to the desired settings and adapt it to MD needs  Give it a name easy to identify MD_MDIdentifier_BeamType Ex. For an MD on electron cloud build up in the PS: MD_ecloudbu_LHC25 MSWG meeting, 30/05/2014  MD users will be fully responsible for the settings on their own cycles

7 MD requests: PSB Parallel MDs with time constraints (or preferences) → YASP commissioning (B. Mikulec, J.F. Comblin) + Effect of realignment on beam dynamics (E. Benedetto, V. Forte, M. McAteer)  soon after restart → Longitudinal studies with new RF control (A. Findlay, M. E. Angoletta)  Longitudinal shaving, C16 blow-up, rebucketing, h1+2 synchro, single batch transfer, other cycle type commissioning  In Weeks 26, 27, → New BTM optics (W. Bartmann, B. Mikulec)  Summer → Loss identification and studies (M. Kowalska, B. Mikulec)  Summer, based on new BLMs → Commissioning of new production scheme for LHC beams (A. Findlay, S. Hancock, B. Mikulec, G. Rumolo)  Increased longitudinal blow up along the ramp and h1+2 transfer to PS  Should be by August to allow set up in PS and use for the SPS scrubbing run (22 September) → Test of Finemet cavities (M.E. Angoletta, A. Findlay, M. Paoluzzi)  Requires half a day access before Week 37  Will extend over Weeks → Injection kicker: kick distribution (T. Fowler, B. Mikulec)  End of Summer → Optimise BI optics wrt brightness and losses (E. Benedetto, B. Mikulec)  Autumn → Turn-by-turn linear and nonlinear ring optics studies (M. McAteer, B. Mikulec, J. Sanchez)  After application is ready MSWG meeting, 30/05/2014

8 MD requests: PSB Other parallel MDs → Beam extraction at 160 MeV (W. Bartmann, B. Mikulec, J. Sanchez)  Relying on new timings for extraction kickers → Resonance compensation based on measurement of resonance driving terms (G.P. Di Giovanni, M. McAteer) → Double batch injection of LHC beams into PS with reduced time between batches (K. Hanke) → Orthogonal injection knobs for PSB-PS injection (K. Hanke) → Space charge measurements at 50 and 160 MeV (E. Benedetto, V. Forte. M. Kowalska, B. Mikulec)  Measurements at 50 MeV require a new magnetic cycle → Effect of chromaticiy correction (E. Benedetto, V. Forte. M. Kowalska, B. Mikulec)  Tune scans with different chroma settings → Effect of octupoles on space charge (E. Benedetto, V. Forte) → Tune shift measurements for impedance model (K. Li, C. Zannini)  Maybe localization with the new turn-by-turn acquisition in place? → Hollow bunch creation by injection of sinusoidal offset function into C02 phase loop (A. Findlay, S. Hancock, A. Oeftiger) MSWG meeting, 30/05/2014

9 MD requests: PSB MDs affecting the machines downstream → Effect of changing the integer part of the tune (E. Benedetto, V. Forte. M. Kowalska)  Requires temporary recabling  dedicated time → Emittance measurements across injection chain (G. Sterbini, A. Guerrero)  Calibration of measurements in the PSB (all four rings, WS and SEM)  Emittance preservation along the injection chain  simultaneous measurements in PS and SPS MSWG meeting, 30/05/2014 Globally for the PSB: About as many MD type requests as many available weeks for MDs (~25)

10 MD requests: PS Parallel MDs (general transverse) → Kick response measurements (R. Wasef) → Dispersion and non-linear chromaticity measurements, as for matrix measurements (R. Wasef) → WP control + nonlinear chromaticity measurement (A. Huschauer) → Transverse injection vs. injection error/chromaticity/tune (A. Huschauer) → Transverse damper (G. Sterbini, A. Blas) → New injection optics (W. Bartmann) → Injection error with quadrupolar PU from recabling of ion tune meter or WCM (S. Gilardoni) → Tune vs kick strength at different dp/p for modelling chromo-geom terms at 2 GeV (R. Wasef, A. Lachaize) → TMCI at transition for low longitudinal emttances (< 1eVs) (G. Sterbini) → TT2-TT10 optics (H. Bartosik) → Compensation of integer with sextupoles/quadrupoles (R. Wasef) → Emittance preservation across injection chain (G. Sterbini, A. Guerrero) MSWG meeting, 30/05/2014

11 MD requests: PS Parallel MDs (general longitudinal) → Tests of new longitudinal coupled-bunch feedback (H. Damerau, M. Migliorati) → Coupled bunch instabilities (H. Damerau, L. Ventura)  With and without 1-turn delay feedback on LHC-type beams  Using C11 to stabilize beam → Increased voltage from 40 MHz cavities (C. Rossi, H. Damerau) → RF manipulations for new exotic beams: 8b+4e, pure batch compression (H. Damerau, S. Hancock) → Measurements of beam induced voltages in 10 MHz cavities (effect of wide-band feedback gain) (H. Damerau) → E-cloud from energy loss/phase error (H. Damerau) MSWG meeting, 30/05/2014

12 MD requests: PS Parallel MDs (space charge studies + impedance) → Compensation of 4Qv=1 (R. Wasef) → Special large H dispersion optics (R. Wasef) → Direct tune spread measurement with quadrupolar PU (S. Gilardoni) → Fully coupled optics at injection to induce V dispersion (Y. Papaphilippou) → Integer tune split of two units (R. Wasef) → Emittance blow up vs. working point (R. Wasef) → Efficiency of hollow bunches to mitigate space charge (A. Oeftiger, S. Hancock, R. Wasef)  depends on the results from PSB MDs → Transverse impedance via Tune shift (N. Biancacci, S. Persichelli) → Impedance localization (N. Biancacci) → Longitudinal impedance via quadrupole oscillation (H. Damerau) MSWG meeting, 30/05/2014

13 MD requests: PS Parallel MDs with time constraints → Beta-beating before and after orbit correction pivoting the MUs (R. Wasef, A. Lachaize)  first time after start up → Flat top electron cloud instability (G. Iadarola, G. Sterbini)  after start up, when electron cloud could be more severe → Resonance identification before and after orbit correction pivoting the MUs (A. Huschauer)  first time after start up → General electron cloud measurements with new detectors in MU (C. Yin-Valgren, G. Iadarola, A. Romano)  begin measurements after start up to monitor possible scrubbing effect → Transfer of larger longitudinal emittance bunches from PSB and benefits (H. Damerau, S. Hancock, PSB)  part of commissioning of the new production scheme for LHC beams MSWG meeting, 30/05/2014 ~700h MD request  18 weeks considering only working hours Should be o.k. with the 21 weeks potentially available – but MD time has to be used wisely

14 MD requests: SPS Parallel MDs (I) → Test of new SPS BQM (G. Papotti) → Longitudinal impedance (E. Shaposhnikova et al)  single bunch on Q26, scanning longitudinal emittance in small steps → Longitudinal space charge (E. Shaposhnikova et al)  need intermediate flat portion → Microwave instability (E. Shaposhnikova et al) → Instability threshold due to the S shape of the injected bunch (E. Shaposhnikova et al.) → Transverse feedback systems (W. Höfle et al): → Normal damper  commissioning should be done during first two weeks of set up with beam → High bandwidth damper  MDs will take place mainly during the scrubbing run and then later during MDs with 25 ns or doublet beams MSWG meeting, 30/05/2014

15 MD requests: SPS Parallel MDs (II) → Transverse impedance measurements (H. Bartosik, N. Biancacci, C. Zannini)  Tune shift vs intensity  Growth times with chromaticity  TMCI thresholds  Impedance localization → Transverse space charge, explore tune space with ultra-bright beams (H. Bartosik) → Set up of Ar cycle for 2015 (T. Bohl, D. Manglunki) → AWAKE synchronization tests (T. Bohl)  initially without beam → Emittance preservation across injection chain (G. Sterbini, A. Guerrero) MSWG meeting, 30/05/2014

16 MD requests: SPS Parallel MDs (II) → Transverse impedance measurements (H. Bartosik, N. Biancacci, C. Zannini)  Tune shift vs intensity  Growth times with chromaticity  TMCI thresholds  Impedance localization → Transverse space charge, explore tune space with ultra-bright beams (H. Bartosik) → Set up of Ar cycle for 2015 (T. Bohl, D. Manglunki) → AWAKE synchronization tests (T. Bohl)  initially without beam → Emittance preservation across injection chain (G. Sterbini, A. Guerrero) MSWG meeting, 30/05/2014 Requested MD time amounts to about 8 weeks (4 days per week – excluding Wednesdays) out of the 9 available weeks

17 MD requests: SPS Dedicated MDs → Optimization of both 50 ns (1.7e11 ppb) and 25 ns (1.2e11 ppb) beams and recovery of 2012 performances (LIU-SPS) → Recover doublet beam production and set up of acceleration to 450 GeV (H. Bartosik, G. Iadarola, et al)  Requires new magnetic cycle with slow ramp → 800 MHz commissioning with beam (E. Shaposhnikova et al)  1 session at beginning of run, 2 after performance recovery → Coupled bunch instability (E. Shaposhnikova et al)  studies with different numbers of bunches and scanning bunch intensity → Test of 8b + 4e scheme (LIU-SPS) → Test controls for the collimation alignment with in-jaw BPMs (collimation team) → Qualification of sponge materials on UA9 goniometer (UA9 team) → Emittance growth for crab cavity tests (R. Calaga) MSWG meeting, 30/05/2014

18 MD requests: SPS Dedicated MDs → Optimization of both 50 ns (1.7e11 ppb) and 25 ns (1.2e11 ppb) beams and recovery of 2012 performances (LIU-SPS) → Recover doublet beam production and set up of acceleration to 450 GeV (H. Bartosik, G. Iadarola, et al)  Requires new magnetic cycle with slow ramp → 800 MHz commissioning with beam (E. Shaposhnikova et al)  1 session at beginning of run, 2 after performance recovery → Coupled bunch instability (E. Shaposhnikova et al)  studies with different numbers of bunches and scanning bunch intensity → Test of 8b + 4e scheme (LIU-SPS) → Test controls for the collimation alignment with in-jaw BPMs (collimation team) → Qualification of sponge materials on UA9 goniometer (UA9 team) → Emittance growth for crab cavity tests (R. Calaga) MSWG meeting, 30/05/2014 Requested MD time amounts to about 160h out of the presently available 80h (8 x 10h blocks) Calculated MD time does not include set up of the coasting cycles, which in previous years took at least one shift per cycle Here prioritization and MD efficiency will be crucial

19 MD requests: Ion chain MDs in the different machines → Dedicated MDs in Linac3 will take place half a day per week from July to December 2014 (D. Küchler)  Slot can change from week to week (excluded Monday mornings) and is agreed upon in the weekly LEIR supervisor meetings → MDs in LEIR do not need detailed coordination, because there is usually enough space in the supercycle (PS is the only user) → No request for PS MDs with ions so far → SPS requests are mainly Ar cycle set up and for the moment included in parallel MD program (as traditionally was in the past) MSWG meeting, 30/05/2014

20 Summary Injector MDs in 2014: key dates → Foreseen start is on Week 26 (PSB) and Week 29 (PS)  As from June 20th, 2014, weekly meeting with PSB and PS MD users will take place on Fridays in the Glassbox from 11:00 to 12:00 for MD scheduling → SPS MDs will start in Week 42 after the scrubbing run (Weeks 39 and 40). Requests → A large number of requests received for the different machines  PSB, PS  Available MD time should be compatible with requests, but need to make good use of MD time  SPS  Parallel MD time should be compatible with requests, but dedicated MD time is far below the requested time. MSWG meeting, 30/05/2014