MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.

Slides:



Advertisements
Similar presentations
© 2003, Cisco Systems, Inc. All rights reserved..
Advertisements

HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade1 AIP /02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
Ports, Cables and Connectors
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
Brian Martlew 6 th June 2006 Controls Ground Rules Brian Martlew.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
5/8/2006 Nicole SAN Protocols 1 Storage Networking Protocols Nicole Opferman CS 526.
EtherCAT (Beckhoff) for advanced LIGO
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
EtherCAT Driver for Remote I/O James Rowland, Ronaldo Mercado and Nick Rees.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
EPICS Meeting, APS, June 14 th 2006 MCS-8 The 8 axes motion control system Rok Šabjan
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
ACCESS CONTROL ExpansE - Distributed Access Control.
MOM Report Galina Vankova RAL, MICE Video Conference.
Controls for High-Availability Magnet PS’s for ATF2 Glen White SLAC September
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Electronic Communication Understanding Serial Communications in Manufacturing.
FBI Unveils Next-Gen IT Strategy By Antoine Tadros May 20, 2010.
Electrical & Control Power Supplies Trevor Hartnett.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
1 Cost of controls TB L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Oct 8-9, 2005ACS Collaboration Meeting – Archamps, France The MicroIOC From Custom To Production First customer: PSI 25 pieces.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Computer Hardware Introduction to Computer Components and Terminology.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Controls & Monitoring Status Update J. Leaver 05/11/2009.
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
© 2002, Cisco Systems, Inc. All rights reserved..
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Adrian Oates Graham Cox Daresbury Laboratory MICE Control System DL Contribution June 09.
EXIT IP600 Overview Avaya IP600 Internet Protocol Communication Server.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of Babar sc.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Chris Booth Sheffield 29th March 2006
MICE RF System Power Supplies, Control and Monitoring Status report
MICE Control System.
DCS WG report 9/09/11 FV.
PLC-based control systems at SOLEIL - ICALEPCS 2017
Database High-Level Overview
Control system network security issues and recommendations
CP220x The Industry’s Smallest Ethernet Controller
PLC Workshop Adrian Oates Daresbury Laboratory Warrington Cheshire UK.
DCS WG report 9/09/11 FV.
May 7 About the Datacenter (hardware show and tell)
Magnet PS Controls Hardware Status
Hall D Cryogenic requirements
ESS Main Control Room & ICS Infrastructure
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen system control

Controls Infrastructure + Network 15 th March 2007 * Linux PC Servers and consoles on order * Can be used either rack mounted or desktop * EPICS V3.14 * Planning network cabling needs within the MICE Hall and Local Control Room. Any special needs to Adrian Oates

Target 15 th March 2007 * Contributed to recent Target Design Review * Future need to consider full controls integration

15 th March 2007 Superconducting Solenoid * Power supply and control rack currently at DL * Evaluating suitability of existing PLC control system * PLC is obsolete and not supported by the manufacturer * Currently assessing the option to replace with a modern alternative

15 th March 2007 Magnet Power Supplies * Danfisik communication protocol has been evaluated and is straightforward to implement * One or more supplies are due to be delivered to DL shortly and can be used for controls testing and rack integration * Considering several hardware options: terminal server, Hytec blade, VME system * edm synoptic panel to be developed for user interface

15 th March 2007 Hydrogen System * Functional specification and signal list already defined * To be implemented in a PLC system * External controls integration (EPICS) also required