Speaker I Organism I adresse mail www.jerico-fp7.euMay 5 to 7 2014 / Oslo / Norway 2 nd General Assembly – NIVA HQ WP5: DATA MANAGEMENT AND DISTRIBUTION.

Slides:



Advertisements
Similar presentations
Science and Policy Integration for COastal Systems Assessment
Advertisements

Portable and Predictable Performance on Heterogeneous Embedded Manycores (ARTEMIS ) ARTEMIS Project Review October 2014 WP1 “Management and IPR”
1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
Work Package 3 PROCEDURAL HARMONISATION FixO3 General Assembly 14 – 16 October 2014, Heraklion-CRETE George Petihakis, HCMR.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP1: A Common Strategy Pascal Morin (INSU) Ingrid Puillat (Ifremer) Dominique.
JERICO WP5 Data management and distribution Alessandro Crise Istituto Nazionale di Oceanografia e di Geofisica Sperimentale JERICO Project Kick-Off meeting.
Ocean Data Interoperability Platform EU-US-Australia collaborative project Grant Number: Call: FP7-INFRASTRUCTURES INFSO Activity: INFRA :
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Wilhelm PetersenI HZGI 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW WP 3 Harmonizing technological.
FOSS4G 2009 Building Human Sensor Webs with 52° North SWE Implementations Building Human Sensor Webs with 52° North SWE Implementations Eike Hinderk Jürrens,
Jo Foden I Cefas I 5 to / Oslo / Norway WP6: OUTREACH Jo Foden (Cefas) David Mills, Simon Keeble, Aldo.
Ocean Data Interoperability Platform (ODIP) ODIP Background and Prototype 1 development EGU 2014 – ESSI 2.5 Session – Vienna – Austria – 1 st May 2014.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Recent international developments in Energy Statistics United Nations Statistics Division International Workshop on Energy Statistics September 2012,
Introduction to Standard 2: Partnering with consumers Advice Centre Network Meeting Nicola Dunbar October 2012.
The Marine Strategy Framework Directive 17th March 2010, Newcastle North Sea Stakeholders Conference Leo de Vrees European Commission (DG Environment,
David MillsI CefasI 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW WP 6.
Anna Scipioni Stefano Nativi Jerome Bequignon Mirco Mazzucato Lorenzo Bigagli Vincenzo Cuomo CYCLOPS Project.
The MyOcean Concept P.Bahurel, project coordinator.
Helen Glaves (NERC- BGS), Dick Schaap (MARIS), Robert Arko (LDEO) and Roger Proctor (IMOS)
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
WP 9 (former Task 1b of WP 1): Data infrastructure Robert Huber UNI-HB Esonet 2nd all regions workshop, Paris
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
Sensors, SWE and European spatial data initiatives – INSPIRE and GMES Brno, Radim Štampach, Ph.D.
CEOS WGISS, Hanoi May OSCAR Prototyping the sensor web Wyn Cudlip BNSC/QinetiQ Presentation to WGISS Hanoi May 2007 (Slides.
© GEO Secretariat Global Datasets (GEOSS task DA-09-03) 3rd GEO European Project Workshop 8-9 October 2009 Istanbul Douglas Cripe, GEO Secretariat.
MyOcean2 First Annual Meeting – April 2013 WP 15 THEMATIC & ASSEMBLY CENTRE for In Situ MyOcean2 First Annual Meeting – Cork /16-17 April 2013.
MRI Expert Group JERICO A Joint European Research Infrastructure network for Coastal Observatories.
Lesley Rickards MEDIN Core Team European initiatives and how MEDIN and the data in the framework relates to them.
ECOOP Annual meeting | | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine.
WP5: DATA MANAGEMENT AND DISTRIBUTION Overview and Status: months Caterina Fanara 1, Loic Petit De La.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
Introduction 1. Purpose of the Chapter 2. Institutional arrangements Country Practices 3. Legal framework Country Practices 4. Preliminary conclusions.
Loïc Petit de la Villéon I IFREMER I WP 7: Service and data access Mid-term review: june , June 18/19.
Suggestions for the GEOSS Workplan C. Waldmann and R. Huber MARUM, Germany.
Henning Wehde I IMR I 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW Wp 2 Strengthening regional and trans-regional.
EuroGOOS Annual Meeting 2009/10/ /10/08 2b: Contribution of open ocean observatories to GEO Data Core – Biodiversity, Ecosystems and Health Richard.
MEDIN Work Plan for By March 2011 MEDIN will be 3 years into the original 5 year development plan started in Would normally ask for continued.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP 7 SERVICES AND DATA ACCESS.
JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum.
Speaker I Organism I adresse mail Date I City I Land Future Strategy for Coastal Observatories From National programme to a pan European.
Henning Wehde I IMR I 5 to / Oslo / Norway 2 nd General Assembly – NIVA HQ WP 2 Strengthening regional.
Speaker I Organism I adresse mail GA & BPW I Heraklion I Crete – Greece WP 1: A common stategy P. Morin, D. Durand, P. Farcy and.
United Nations Oslo City Group on Energy Statistics OG7, Helsinki, Finland October 2012 ESCM Chapter 8: Data Quality and Meta Data 1.
WSMO in Knowledge Web 2nd SDK cluster f2f meeting Rubén Lara Digital Enterprise.
UNSD Recent international developments in Energy Statistics.
EMODNet Physics + My Ocean – SeaDataNet Dick Schaap (MARIS) – Brussels – 1 March 2013.
Helen Glaves 1 and Dick Schaap 2 1 British Geological Survey, United Kingdom 2 MARIS, The Netherlands.
Work Package 3 FixO3 “label” FixO3 General Assembly October 2014, Heraklion-CRETE Jean-Francois Rolin, George Petihakis IFREMER, HCMR.
Co-funded by the European Union Ref. number: LLP FI-ERASMUS-ENW OI-Net The European Academic Network for Open Innovation ,
Sensor Web Enablement (SWE) developments for fixed monitoring platforms and research vessels By Dick M.A. Schaap – SeaDataNet Technical Coordinator with.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 1 SI O S Svalbard Integrated Arctic.
Workshop Sensor Web Enablement (SWE) for oceanography - introduction Dick M.A. Schaap – MARIS March 2016.
WP3 Task 3.2 Adaptation of the Training Material.
SEXTANT PRODUCTS CATALOGUE
Task 2.6 Eric Delory PLOCAN
INTAROS – Integrated Arctic Observation System
WORK PROGRAMME to support the implementation of the Recommendation
EMODnet - Ingestion and safe-keeping of marine data
Strategy for standardization of LIDO in ESONET
SEPA AND EEA, FIVE YEARS OF COOPERATION
O3YellowPages “Open Ocean Observatories Yellow Pages – O3YP”-
Project Coordination Group (PCG) for the implementation of the MSFD
ESSnet on Linked Open Statistics
RECARE set-up Rudi Hessel on behalf of coordination team
Animal-Borne Instrument Task Team ABI TT Terms of Reference
EMODNet Physics + My Ocean – SeaDataNet
APENet and EUROPEANA: Digitization Issues in the European Context
Presentation transcript:

Speaker I Organism I adresse mail 5 to / Oslo / Norway 2 nd General Assembly – NIVA HQ WP5: DATA MANAGEMENT AND DISTRIBUTION Review and Status Rajesh Nair 1, Loic Petit De La Villeon 2, Gilbert Maudire 2, Caterina Fanara 1, and Alessandro Crise 1 1 OGS (Istituto Nazionale di Oceanografia e di Geofisica Sperimentale), Italy 2 IFREMER, France

General Assembly 2 - JERICO - 2 WP5: THE OPERATING STRATEGY Create suitable partnerships with ongoing European data management initiatives to meet objectives → formalize links and actively engage with SeaDataNet-II (SDN-II) & MyOcean (MyO) to support JERICO data flow and dissemination. Use what exists → SDN-II for Delayed-mode (DM) data & MyO for (near) Real-time (nRT) data. Avoid duplication of efforts → cooperate with SDN-II & MyO in the development/improvement of data handling methodologies and data quality assurance procedures, prioritizing JERICO-specific monitoring parameters/technologies.

General Assembly 2 - JERICO - 3www.jerico-fp7.eu WP5: WHY THIS OPERATING STRATEGY? Create suitable partnerships with ongoing European data management initiatives to meet objectives → supports the “open & free” data policy paradigm; will aid in ensuring compatibilty, interoperability, and the implementation of communal data handling practices. Use what exists → Many JERICO partners are already contributing to (or are prepared to contribute to) SDN-II/MyO. Avoid duplication of efforts → cooperating with SDN-II/MyO will allow JERICO to participate in establishing Europe’s database and management infrastructure for coastal marine data.

General Assembly 2 - JERICO - 4 WP5: THE OPERATING STRUCTURE Oceanboard JERICO has an «open access» data policy. The flow of data from JERICO partners to the community of users is driven by the synergic action of three WPs. WP5 defines the rules for data management and distribution. WP7 is collecting data from partners. WP6 provides the platform for distribution of data and tools.

General Assembly 2 - JERICO - 5 WP5: A FUNCTIONAL DESCRIPTION EMODNETPP

General Assembly 2 - JERICO - 6 WP5: OVERVIEW OF TASKS 5.1 Create value for measured data (Task Leader: OGS; other partner involved: HCMR) Activity description: development of common procedures for assigning uncertainties to measured parameters. 5.2 Harmonization of delayed-mode data management procedures with SeaDataNet (Task Leader: IFREMER; other partners involved: HCMR, MUMM, OGS) Activity description: development of the JERICO data management framework for delayed-mode data. 5.3 Harmonization of real-time data management procedures with MyOcean/EuroGOOS (Task leader: IFREMER; other partners involved: CNR, NIVA, IMR, HCMR, PUERTO, SMHI) Activity description: development of the JERICO data management framework for dealing with real-time data.

General Assembly 2 - JERICO - 7 WP5: CREATING VALUE FOR MEASURED DATA Guidelines for Uncertainty Activity partners: OGS / HCMR Rajesh Nair Nevio Medeot George Petihakis Manolis Ntoumas

General Assembly 2 - JERICO - 8 WP5: CREATING VALUE FOR MEASURED DATA Guidelines for Uncertainty The deliverable, D5.4, the document “Guidelines for Uncertainty” was prepared, and has been submitted to the Coordinator. D5.4: presents the essential principles and concepts central to the determination of measurement uncertainty; describes the different steps involved in an uncertainty calculation, and introduces reporting conventions; Provides guidance on the proper preparation of relevant documentation; outlines the importance of uncertainty determinations in the context of coastal marine observing activity.

General Assembly 2 - JERICO - 9 WP5: CREATING VALUE FOR MEASURED DATA 1.DOCUMENT DESCRIPTION 2.EXECUTIVE SUMMARY 3.INTRODUCTION 4.MAIN REPORT 4.1. Some useful elementary concepts 4.2. Measurement and uncertainty 4.2.1What is (and is not) a measurement? 4.2.2What is measurement uncertainty? 4.2.3Error, accuracy and precision versus uncertainty 4.2.4Sources of uncertainty 4.3. Determining uncertainty 4.3.1Defining the measurand 4.3.2Designating the sources of uncertainty 4.3.3Quantifying the uncertainty components 4.3.4Calculating the combined uncertainty 4.3.5Expanded uncertainty 4.4. Reporting uncertainty 4.4.1The combined standard uncertainty (u c ) 4.4.2The expanded uncertainty (U) 4.4.3The uncertainty budget 4.4.4Good Practice recommendations for preparing documentation 4.5 Uncertainty evaluation in the context of coastal marine observatories 5.CONCLUSION 6.BIBLIOGRAPHY D5.4: contents

General Assembly 2 - JERICO - 10 WP5: HARMONIZATION Towards real-time integration of the heterogeneous, distributed JERICO sensor network into mainstream European information infrastructures Activity partners: IFREMER / MARUM Loïc Petit De la Villeon Thomas Loubrieu Andree Behnken

General Assembly 2 - JERICO - 11 WP5: HARMONIZATION OGC/SWE for JERICO: SensorML templates  Sensor Web Enablement is a suite of OGC standards enabling real time integration of heterogeneous sensors into the information infrastructure.  These standards cover: platform/sensor and process descriptions (sensorML, TML), the observation data flow from sensors (O&M) and the management of sensor requests, planning and alerts (SOS, SPS, SAS, WNS).  SensorML is the XML format dedicated to sensor system descriptions: it describes hierarchically sensor and observation networks. As such, it can be used to implement valuable platform catalogues.  Synergies with earlier studies in ESONET and OceanSites, and current work within SeaDataNet and ODIP, have been considered.

General Assembly 2 - JERICO - 12 WP5: HARMONIZATION A sensorML description of HCMR’s Poseidon - Pylos Platform  Mooring with 14 sensors (atmospheric, sea-surface and water-column)

General Assembly 2 - JERICO - 13 WP5: HARMONIZATION Results (available on an alfresco collaborative basis) Demonstration description in XML. Report on description from MARUM. IFREMER feedback. Perspectives MARUM is considering feedback (to be sent). Implementation of requirements in SeaDataNet SensorML editor (12/2014).

General Assembly 2 - JERICO - 14 WP5: HARMONIZATION Delayed Mode data management Activity partners: IFREMER / MARIS Loïc Petit De la Villeon Dick Schaap

General Assembly 2 - JERICO - 15 WP5: HARMONIZATION Results (available as deliverable D5.1) End of last year: release of the second version of the “Delayed Mode Data Management Handbook”; Includes latest developments of SeaDataNet together with Eurofleets and ODIP (EU - USA - Australia); IFREMER feedback transmitted. Perspectives Implementation when data will be available in Delayed Mode (at the end of the JERICO project).

General Assembly 2 - JERICO - 16 WP5: LINK TO WP7 (SERVICE & DATA ACCESS) Platforms and status of data flow (as at the end of 2013)

General Assembly 2 - JERICO - 17 WP5: DELIVERABLES Rendered deliverables  D5.1: “DM data management handbook, V1”  D5.2: “RT data management handbook, V1”  D5.3: “First data management report”  D5.4: “Guidelines for uncertainty”

General Assembly 2 - JERICO - 18 WP5: DELIVERABLES Progressing deliverables  D5.5: “Report on uncertainty for selected key parameters: temperature, salinity and chlorophyll-a”  D5.6: “DM data management handbook, V2”  D5.7: “Second data management report”  D5.8: “RT data management handbook, V2”

Speaker I Organism I adresse mail 5 to / Oslo / Norway 2 nd General Assembly – NIVA HQ Thank You

General Assembly 2 - JERICO - 20 DATA: SOME FOOD FOR THOUGHT

General Assembly 2 - JERICO - 21 DATA: SOME FOOD FOR THOUGHT

General Assembly 2 - JERICO - 22 DATA: SOME FOOD FOR THOUGHT